R. E. Ginna - Forwards Monthly Operating Status Information for Month of October 1975
ML18142B393
Person / Time
Site: Ginna Constellation icon.png
Issue date: 11/06/1975
From: Platt C
Rochester Gas & Electric Corp
To:
Office of Nuclear Reactor Regulation
References
Download: ML18142B393 (10)


Text

MONTHLY FvPORTS (FOR GRAY BOOK PREPARATIO>'X NRC D w R I BUTION FOR PART 50 DOCK E >v(ATER I AL (TEMPORARY FORM)

CONTROL NO:

FILE MONTHLY REPORT FILE FROM Rochester Gas 8 Elec. Cor. DATE OF DOC DATE REC'D LTR TWX'PT OTHER Rochester, N.Y.

TO: ORIG CC OTHER NRC 1 i d SENT LOCAL PDR CLASS UNC LASS P ROP INFO INPUT NO CYS REC'D DOCKET NO'0-244 DESCR IPTION: ENCLOSURES:

Ltr trans the following: Monthly Report for 0 Plant & Comporient Operability & Availability This Report to be used in preparing Gray Book by Plans & Operations.

C NUMBER OF COPIES REC'D:

PLANT NAME: RE. Ginna b 1 FOR ACTION/INFORMATION SAB 11-17-75 BUTLER (L) SCHWENCER (L) ZIEMANN (L) REGAN (E)"

W/ Copies W/ Copies W/ Copies W/ Copies CLARK (L) STOLZ (L) DICKER (E) LEAR (L)

. W/ Copies W/ Copies W/ Copies W/ Copies PARR (L)

W/ Copies VASSALLO (L)

W/ Copies KN(GHTON (E(

W/ Copies SPELS W/ Copies DQ NQT HEMQ (/E KNIEL (L) EMPURPLE (L) YOUNGBLOOD (E(~ MPPC/PE W/ Copies W/ Copies INTERNAL DISTRIBUTION R F IL TECH REVIEW DENTON LIC ASST - A/T IND .

~NRC R SCHROEDER GRIMES R. DIGGS (L) BRAITMAN OGC, ROOM P-506A- MACCARY GAMMII L ~

H. GEAR IN (L) SALTZMAN-GOSSI CK/STAFF, KNIGHT KASTNER E. GOULBOURNE (L) MELTZ CASE PAWLICK I BALLARD P. KREUTZER (E)

GI AMBUSSO SHAO SPANGLER LEF (L) PLANS BOYD MOORE (L)

STE LLO HOUSTON M.

J S.

EM%NOOK (L)

REED (E)

~~CHAPMAN MCDONALD DEYOUNG (L) NOVAK MULLER M. SERVICE (L) DUBE (Ltr)

.SKQVHOLT (L)

GOLLER (L) (Ltr)

ROSS IPPOLITO DICKER KNIGHTON

~.M. SHEPPARD (L)

SLATER (E)

E. COUPE PETERSON P. COLLINS TED ESCO .YOUNG BLOOD H. SMITH (L) HARTFIELD (2)

DENISE J. COLLINS REGAN S. TEETS (L) KLECKER REG OPR LAINAS PROJECT LDR G. WI LLIAMS (E) 'ISENHUT FILE 5 REGION (2) BENAROYA V. WILSON (L) WIG G I NTON VOLLMER HARLESS R. INGRAM (L)

STEELE MDUNA EXTERNAL DISTRIBUTION

~1 LOCAL TIC PDR~~

(ABERNATHY)

Rochester, N.Y.

(1)(2)(10) NATIONALLABS P D R-SAN/LA/NY

~1 W. P E NN IN GTON, R m E-201 GT' 1

BROOKHAVEN NAT LAB

~1 NSIC (BUCHANAN) 1 1 ASLB CONSULTANTS 1 G. ULR IKSON, ORNL 1 Newton Anderson

" NEWMARK/BLUME/AGBABIAN 1 AGMED (RUTH GUSSMAN)

C ACRS )QIIIjG/SENT ~

'J.

Rm 8-127 GT 1 D. RUNKLES,'Rm E-201 GT

'< 1

',I %

lt

HC't 444 ~ Owl ~ AIO h.

(ui isa,.

ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649

~Pl TELEPHONE ARE* cooc 7ld 546.2700 saC~<~~.

uu~~"c Ginna Station November 6> 1975 G'j" pe

%if prTg(p

'NN>

r XOVZ7]S75 Office of Plans and Schedules 0'4 A> a C~,ii:tvlPH c.e,vi Directorate I tgr~

of Licensing /p U. S. Nuclear Regulatory Commission P~fl 8<."le Washington, D. C. 20555 Cjp

Subject:

Monthly Report for October 1975 Operating Status Information R. E. Ginna Nuclear Power Plant Unit No. 1 Docket No. 50-244 Gentlemen:

Pursuant to the letter dated February 19> 1974 of Mr. L. Manning Muntzing>

Director of Regulation, enclosed herewith is .the requested operating status information of the Ginna Station for the month of October.

Very truly yours>

Charles E. Platt Superintendent CEP:fah Enclosures (3) cc: Mr. James P. O'Reilly

a p

~ Wj

)

4

0 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 244 UNIT ¹I Ginna Station DATE November 6 1975 COMPLETED B Andrew E. McNamara> 0 erations Aide TELEPHONE EXT: 291-214 at Ginna MONTH October 1975 DAY AVERAGE DAILY POWER LEVEL DAY. AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Ne t) 480>'&' 482%%

1 17 479>w 48].>'n'c 18 425 48].AA 455 4824k 20 482m~ 4804>'r 21 48].M 48].o'cA 22 482%~'c 48].dn'c 23 482>H< 48].wv 24 480m.>> 48004 25 381 468 10 26 ll 27 480~m 12 44 28 479~

13 459 48].~H<

28 14 48].AA 30 48].~w'81~>v 15 481m 31 482%%

16

  • UNIT OUTAGE: 751010 8 2100 to 751012 8 1630

~'<Maximum dependable capacity is being used for the net electrical rating of the unit. The daily average power level is currently exceeding this value.

INSTRUCTIONS On this form, list the average daily unit power level in MWe<'et for each.day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Rote that when maximum depend-able capacity'.is used for the net electrical rating of the unit, there may'be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). 'n such cases, the average dail'y unit power output sheet should be footnoted to explain the apparent anomaly.

I ~

OPERATING DATA REPORT DOCKET NO. 50 2~4 UNIT ¹1 Qiana Station DATE November 6> 1975 COMPLETED BY~8 0 erations Aide PW TELEPHONE Ext: 291-214 at Ginna OPERATING STATUS

1. REPQRTING PERI0D: 0 o e > 97 GRoss H0URs IN REPDRTING PERI0D:

2, CURRENTLY AUTHORIZED POWER LEVEL (MWG 1520 MAX. DEPEHD, CAPACITY (MW .N 1): 470 DESIGH ELECTRICAL RATING (MW .N I) 470

3. POWER LFVEL TO WHICH RESTRICTED (IF ANY) (MWE).Net)2
4. REASONS FOR RESTRICTION (IF ANY):

THIS MONTH YR TO DATE CUMULATIVE'9

5. NUMBER OF HOURS REACTOR WAS CRITICAL 705.42' 429.96 784.42
6. REACTOR RESERVE SHUTDOWH HOURS. 0.91 292.13 292 '3>>>>
7. HOURS GENERATOR ON LINE 701.5 59290 '5 389492.38
8. UNIT RESERVE SHUTDOWN HOURS 0 8.5 8,5>>>>

9, GROSS THERMAL ENERGY GENERATED(MWH).......,..., .. 1~047 31 ~7 584I475 48g248g794

10. GROSS ELECTRICAL ENERGY GENERATED (MWH) . ~3~3 \

2 491 734 16 098 552 ll. HET ELECTRICAL ENERGY GEHERATED (MWH).........,... ~331 241 293679664 1592189826

12. REACTOR SERVICE FACTOR .............. 94 ~ 69% 74.42% 75.88%

.. ~,

13. REACTOR
14. UNIT SERVICE FACTOR,,

AVAILABILITYFACTOR

15. UNIT AVAILABILITYFACTOR

~ ~ ~ ~

~ ..

~ ~, ~

~, ...

~

~ 94 ~ 8 94 ~ 16%

94 ~ 16%

78.43%

72.5 72.62%

76.5 74 '5%

74.06%

16. UNIT CAPACITY FACTOR (UBIny MDC) g ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 7 ~

94 ~ 59% 69 '5% 66 '  %

l)UNIT CAPACITY FAC,TOR (U ~ I g D Ig MW )............... ~94 59 ~69. 05 . 66 '  %

18. UNIT FORCED OUTAGE RATE 0% 5.01% 9. 08%
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE. AND DURATION OF EACH):
20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUPZ 2I ~ UNITS IN TEST STATUS(PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICAI.ITY INITIALELECTRICITY COMMERCIAL OPERATION

>>Changeover - Eastern Daylight Savings Time to Eastern Standard Time

>>>>Cumulative Data Commencing January 1> 1975 40 88 RSVP 20/75

~ ~

o 0 ~

0 4

~ n

DOCKET NO. 50-244 "PNMARY: Reactor powe~ levels were maintained GINNA STATION, UNIT II'I approximately 100% during the reporting UNIT NAME period, The exceptions were: yearly outage November 6, 1975 813 and power reduction, detailed below. DATE COMPLETED BY Andrew E. MCNamara> Operations Aide TELEPHONE 2 1-214 at Ginna REPORT MONTH October, 1975 UNIT SHUTDOlA AND PONER REDUCTIONS METHOD OF TYPE SHUTTING DOWN F-FORCED DURATION THE REACTOR OR CORRECTIVE ACTIONS/COMMENTS NO. DATE S-SCHEDULED (HOURS) REASON ( I ) REDUCING POWER (2)

NA4 751003 Reactor power level reduction to "47% to perform T-18B>

Turbine main steam stop valves test.

751010 '3.5 H Unit outage to replace power cables for Lake intake heaters-other maintenance NA4 751026 F 4'. Loss of 41 generator transformer cooling fans. Reactor power level reduction to '70%.

(I) REASON: (2) METHOD:

A - EQUIPMENT FAILURE (EXPLAIN) MANUAL B - MAINT. OR TEST 2 - MANUAL SCRAM C - REFUELING 3 - AUTOMATIC SCRAM D REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)

E - OPERATOR TRAINING AND LICENSE EXAMINATION F - ADMINISTRATIVE G - OPERATIONAL ERROR (EXPLAIN)

H - OTHER (EXPLAIN)

-"Power reductions were not previously reported. Data not available.

Commencing January 1> 19769 this data will be REV. I 0/75 49 89 available.

~ ~'