R}
a S
An Energy East Company ROCHESIER G4SAND ELECRCORPOCT70N
- 89 ETAVEUE, ROCHES7ER, NY 14649-OW I 585 546-2700 w.rgecom July 10, 2003 US Nuclear Regulatory Commission Document Control Desk Attn:
Robert Clark Project Directorate I-1 Washington, DC 20555
Subject:
Monthly Report for June 2003 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Mr. Clark:
PursuanttoGinna Improved Technical Specifications Section 5.6.4, attached'isthe moithIlyoperating status report for Ginna Station for the month of June 2003.
Very truly yours, Joseph.Widay Plant Manager xc:
U.S. Nuclear Regulatory Commission Mr. Robert Clark (Mail Stop O-8E9)
Project Directorate I-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments
OPERATING DATA REPORT 50-244 July 10, 2003 COMPLETED BY: _k.LL4.&
,,John V. Walden TELEPHONE (585) 771-3588 OPERATING STATUS 1.
2.
3.
4.
Unit Name:
R.E. GINNA NUCLEAR POWER PLANT Reporting Period:
June, 2003 Design Electric Rating (Net MWe):
470 Maximum Dependable Capacity (Net MWe):
480 Notes:
This Month Yr.-to-Date Cumulative*
5.
6.
7.
8.
Number of hours Reactor Was Critical Hours Generator On-line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH) 720.0 720.0 0.0 355748.0 4343.0 4332.1 0.0 2143536.4 243359.9 240191.2 8.5
- 109472445.4
- CUMULATIVE TOTAL COMMENCING NOVEMBER 8, 1969
DOCKET NO: 50-244 UNIT NAME: R.E. GINNA NUCLEAR POWER PLANT DATE: July 10. 2003 COMPLETED BY: John V. Walden TELEPHONE: (585) 771-3588 UNIT SHUTDOWN REPORTING PERIOD:
June 2003 (MonthNear)
NO.
DATE TYPE DURATION REASON<')
METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS)
SHUTTING l____ _____5:
SCHEDULED DOWN12)
COMMENTS
SUMMARY
- The unit operated at full power for the entire of the month of June. Average power for the month of June was 99.7%.
(1) Reason A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/LUcense Examination F - Administrative G -Operational Error (Exqleln)
H -Other (Explain)
(2) Method 1 -Manual 2-Manual Trip/Scram 3 - Automatic Trip/Scram 4-Continuation 5 - Other (Explain)