June 2003 Monthly Operating Report for R.E. Ginna Nuclear Power Plant
ML031980438
Person / Time
Site: Ginna Constellation icon.png
Issue date: 07/10/2003
From: Widay J
Rochester Gas & Electric Corp
To: Clark R
Document Control Desk, NRC/NRR/DLPM/LPD1
References
Download: ML031980438 (3)


Text

R}

a S

An Energy East Company ROCHESIER G4SAND ELECRCORPOCT70N

  • 89 ETAVEUE, ROCHES7ER, NY 14649-OW I 585 546-2700 w.rgecom July 10, 2003 US Nuclear Regulatory Commission Document Control Desk Attn:

Robert Clark Project Directorate I-1 Washington, DC 20555

Subject:

Monthly Report for June 2003 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Clark:

PursuanttoGinna Improved Technical Specifications Section 5.6.4, attached'isthe moithIlyoperating status report for Ginna Station for the month of June 2003.

Very truly yours, Joseph.Widay Plant Manager xc:

U.S. Nuclear Regulatory Commission Mr. Robert Clark (Mail Stop O-8E9)

Project Directorate I-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments

OPERATING DATA REPORT 50-244 July 10, 2003 COMPLETED BY: _k.LL4.&

,,John V. Walden TELEPHONE (585) 771-3588 OPERATING STATUS 1.

2.

3.

4.

Unit Name:

R.E. GINNA NUCLEAR POWER PLANT Reporting Period:

June, 2003 Design Electric Rating (Net MWe):

470 Maximum Dependable Capacity (Net MWe):

480 Notes:

This Month Yr.-to-Date Cumulative*

5.

6.

7.

8.

Number of hours Reactor Was Critical Hours Generator On-line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH) 720.0 720.0 0.0 355748.0 4343.0 4332.1 0.0 2143536.4 243359.9 240191.2 8.5

  • 109472445.4
  • CUMULATIVE TOTAL COMMENCING NOVEMBER 8, 1969

DOCKET NO: 50-244 UNIT NAME: R.E. GINNA NUCLEAR POWER PLANT DATE: July 10. 2003 COMPLETED BY: John V. Walden TELEPHONE: (585) 771-3588 UNIT SHUTDOWN REPORTING PERIOD:

June 2003 (MonthNear)

NO.

DATE TYPE DURATION REASON<')

METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS)

SHUTTING l____ _____5:

SCHEDULED DOWN12)

COMMENTS

SUMMARY

The unit operated at full power for the entire of the month of June. Average power for the month of June was 99.7%.

(1) Reason A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/LUcense Examination F - Administrative G -Operational Error (Exqleln)

H -Other (Explain)

(2) Method 1 -Manual 2-Manual Trip/Scram 3 - Automatic Trip/Scram 4-Continuation 5 - Other (Explain)