ML020580214

From kanterella
Jump to navigation Jump to search
January 2002 Monthly Operating Report for R. E. Ginna Nuclear Power Plant
ML020580214
Person / Time
Site: Ginna Constellation icon.png
Issue date: 02/11/2002
From: Widay J
Rochester Gas & Electric Corp
To: Clark R
Document Control Desk, NRC/NRR/DLPM/LPD1
References
Download: ML020580214 (3)


Text

ROCHESTER GAS AND ELECTRIC CORPORATION

  • 89 EAST AVENUE, ROCHESTER, N. Y 14649-0031 AREA CODE 716 546-2700 February 11, 2002 US Nuclear Regulatory Commission Document Control Desk Attn:

Robert Clark Project Directorate I-1 Washington, DC 20555

Subject:

Monthly Report for January, 2002 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Clark:

Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of January, 2002.

Very truly yours, sh A. Wida lant Manager xc:

U.S. Nuclear Regulatory Commission Mr. Robert Clark (Mail Stop O-8E9)

Project Directorate I-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments (VJ

OPERATING DATA REPORT 50-244 February 11, 2002 COMPLETED BY:

I ud 7John V. Walden TELEPHONE (585) 771-3588 OPERATING STATUS

1.
2.
3.

4.

Unit Name:

R.E. GINNA NUCLEAR POWER PLANT Reporting Period:

January, 2002 Design Electric Rating (Net MWe):

470 Maximum Dependable Capacity (Net MWe):

480 Notes:

Number of hours Reactor Was Critical Hours Generator On-line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)

This Month 744.0 744.0 0.0 369436.0 Yr.-to-Date 744.0 744.0 0.0 369436.0 Cumulative**

231766.2 228650.1 8.5

  • 103854996.8
    • CUMULATIVE TOTAL COMMENCING NOVEMBER 8, 1969
5.
6.
7.

8.

DOCKET NO: 50-244 UNIT NAME: R.E. GINNA NUCLEAR POWER PLANT DATE: February 11, 2002 COMPLETED BY: John V. Walden TELEPHONE: (585) 771-3588 UNIT SHUTDOWN REPORTING PERIOD:

January, 2002 (Month/Year)

SUMMARY

The unit operated at full power for the entire month of January. Average power for the month of January was 99.8%.

(1) Reason A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

(2) Method 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)

NO.

I DATE TYPE DURATION REASON(1)

METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS)

SHUTTING

&:SCHEDULED DOWN (2)

COMMENTS

.L _______

I ________

____________________