R. E. Ginna Nuclear Power Plant - Cyber Security Inspection Report 05000244/2024402 (Cover Letter Only)
ML24355A026
Person / Time
Site: Ginna 
Issue date: 12/20/2024
From: Glenn Dentel
Division of Operating Reactors
To: Rhoades D
Constellation Energy Generation, Constellation Nuclear
References
IR 2024402
Download: ML24355A026 (1)


Text

December 20, 2024

SUBJECT:

R.E. GINNA NUCLEAR POWER PLANT - CYBER SECURITY INSPECTION REPORT 05000244/2024402

Dear David Rhoades:

On November 8, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at R.E. Ginna Nuclear Power Plant. On December 5, 2024, the NRC inspectors discussed the results of this inspection with Chris Birke, Senior Manager Engineering and other members of your staff. The results of this inspection are documented in the enclosed report.

Three findings of very low security significance (Green) are documented in this report. Three of these findings involved violations of NRC requirements. We are treating these violations as non-cited violations (NCVs) consistent with Section 2.3.2 of the Enforcement Policy.

If you contest the violations or the significance or severity of the violations documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN:

Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region I; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at R.E. Ginna Nuclear Power Plant.

The following cross-cutting aspects were assigned to findings using Inspection Manual Chapter 0310, Aspects Within Cross Cutting Areas: one [H.13] - Consistent Process, one [H.7] - Documentation, and one [P.2] - Evaluation.

If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region I; the Director, Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at R.E. Ginna Nuclear Power Plant.

This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding.

The enclosed report contains Security-Related Information, so the enclosed report will not be made publicly available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely, Glenn T. Dentel, Chief Engineering Branch 2 Division of Operating Reactor Safety

Docket No. 05000244 License No. DPR-18

Enclosure:

As stated

cc w/o encl: Distribution via LISTSERV

cc w/encl:

R. Null, Manager Security Operations A. Peterson, State Liaison Officer Designee, NY State Energy, Research & Development Authority C. Hook, Security Manager B. Wright, NYS Division of Homeland Security and Emergency Services

Glenn T.

Dentel Digitally signed by Glenn T. Dentel Date: 2024.12.20 09:41:20 -05'00'

ML24355A024 (Cover letter w/ enclosure(s))

ADAMS ACCESSION NUMBER: ML24355A026 (Cover letter)

Entire Report:

X SUNSI Review Non-Sensitive X Sensitive Publicly Available X Non-Publicly Available Cover Letter Only:

X SUNSI Review X Non-Sensitive Sensitive X Publicly Available Non-Publicly Available OFFICE RI/DORS RI/DORS RI/DORS RI/DORS

NAME LDumont DWerkheiser JSchussler GDentel

DATE 12/18/24 12/18/24 12/19/24 12/19/24