ML042310552

From kanterella
Jump to navigation Jump to search
July 2004 Monthly Operating Report for R E Ginna
ML042310552
Person / Time
Site: Ginna Constellation icon.png
Issue date: 08/10/2004
From: Widay J
Constellation Energy Group
To: Clark R
Document Control Desk, NRC/NRR/DLPM/LPD1
References
Download: ML042310552 (2)


Text

'

~J' 1503 Lake Road Ontario, New York 14519-9364 585.771.3000 Constellation Energy R.E. Ginna Nuclear Power Plant, LLC August 10, 2004 US Nuclear Regulatory Commission Document Control Desk Attn:

Robert Clark Project Directorate 1-1 Washington, DC 20555

Subject:

Monthly Report for July 2004 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Clark:

Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of July 2004.

Very truly yours, h A. Widay 7J Plant Manager xc:

U.S. Nuclear Regulatory Commission Mr. Robert Clark (Mail Stop O-8E9)

Project Directorate 1-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments

wr OPERATING DATA REPORT DOCKET NO.

50 UNIT NAME Gi DATE Au COMPLETED BY Xi TELEPHONE (51 REPORTING PERIOD:

-244 nna I igust 09, 2004 hn Walden.,

m i5) 771-3588 July 2004

1. Design Electrical Rating
2. Maximum Dependable Capacity (MWe-Net) 470.00 480.00
3.

Number of Hours the Reactor was Critical

4. Numberof Hours GeneratorOn-line
6. Reserve Shutdown Hours
6.

Net Electrical Energy Generated (MWHrs)

This Month 744.00 744.00 0.00 363,554.00 Yr-to-Date 5,111.00 5,111.00 0.00 2,529,134.00 Cumulative 252,109.22 248,896.70 8.50 113,726,635.0 UNIT SHUTDOWNS Type Method of N F: Forced Duration Shutting Cause & Corrective Action No.

Date S Scheduled (Hours) Reason1 Down 2 Comments

SUMMARY

The unit operated at full power for the entire month of July. Average power for the month was 99.7%.

1 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

I Manual 2

Manual Trip/Scram 3

Automatic TriplScram 4

Continuation 6

Other (Explain)

Page 1 of 1