1503 Lake Road Ontario, NewYork 14519-9364 585.771.3000 Constellation Energy R.E. Ginna Nuclear Power Plant, LLC October 8, 2004 US Nuclear Regulatory Commission Document Control Desk Attn: Robert Clark Project Directorate l-1 Washington, DC 20555

Subject:

Monthly Report for September 2004 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Clark:

Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of September 2004.

Very truly yours, Thomas A. Mar ow Plant Manager xc: U.S. Nuclear Regulatory Commission Mr. Robert Clark (Mail Stop 0-8-C2)

Project Directorate 1-1 One White Flint North 11555 Rockville Pike Rockville, MD 20852 Regional Administrator U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments

OPERATING DATA REPORT DOCKET NO. 50 -244 UNIT NAME Ui nna 1 DATE U ;tober 07, 2004 COMPLETED BY J2 nn V. walden .

TELEPHONE (5135) 771-3588 REPORTING PERIOD: September 2004

1. Design Electrical Rating 470.00
2. Maximum Dependable Capacity (MWe-Net) 480.00 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 6,575.00 253,573.22
4. Number of Hours Generator On-line 720.00 6,575.00 250,360.70
5. Reserve Shutdown Hours 0.00 0.00 8.50
6. Net Electrical Energy Generated (MWHrs) 351,488.00 3,241,044.00 114,438,545.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

The unit operated at full power for the entire month of September. Average power for the month was 99.7%.

1 2 Reason: Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

Page 1 of 1