NA< ponM 19 U.S. NUCLL7AIR AECULATOAYCOMMISSION I2. JG) r)LE NUMorn NRC DIS:l RIBUTlON Fon PAR . DOCl(ET MATERIAL MONTHLY REPORT

','O: FROM:ROCHESTER GAS & ELECTRIC CORP DATE OF DOCUMEN'r NRC ROCHESTER> NY 2-9-76 DATE RECEIVED 2-19-76 ETTE n QNOTonizE'D PROP INPUT FORM NUMDEA OF COPIES RECEIVED 19pnIGINAL QUNC LASSIF I L. D CI COP Y 1 DESCRIPTION LETTER TRANS TkIE FOLLO>JXNG: y~OfjTNLY REPPRv PPR JANUARY 1976 PLANT 6r CONPONENT OPERAETLTTY 6 AVAXLABXIXTY ~ THIS REPORT TO BE USED XN PREPARING GRAY BOOK BY PLANS & OPERATXONS

'V PLANT NAME:, G.INNA ~

FOR ACTION/INFORMATION ~

J MXPC C~S ~O>> AC XON INTenNWI n IS1 RIBUTION GL'6 u:LE I<C Pn tKJLO~NM.D

.M. CIQ,%LYCH BRANCH CH~XEI' EXTF RNhl. DISTRIBUTION NTROL NUMBER JJ?PR: LYONS NY ROCHESTER, NY

.DS Di 1631 Ping FQIIM IGS (2.7G)

1

-l g

J e

ff&tf A nfff IIII6 yonff:

ESg/gl// ///I/SS szzidfE /////I////

ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649 TCLKPHONK i3 AREA cooc 7l6 546.2700 7 irma Station

'H'6gUIBl'Oig g~U~~, ."; e ruary 9, 1976 kC(Gt Fll8. Cr~

~zo<"

v(GQ V

+ o~ 4 fo Cb

/(l- 8 Director, Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Subject:

Monthly Report for January, 1976 (Revised)

Operating Status Information R. E. Ginna Nuclear Power Plant Unit No. 1 Docket No. 50-244 Gentlemen:

Attached herewith is the revised (Item II6) Operating Data Report for the month of January, 1976.

Please discard the first copy sent you and insert the revised page enclosed.

Very truly yours, I,

C Charles'E. Platt Superintendent CEP:fah Attachments.

cc: Mr. James P. O'Reilly, NRC (1)

Mr. William G. McDonald, NRC (2)

SIOCKErSO ASHRAM 8

E'EBL818jg L O'S'Uf f "AR RECV Ato CO4fg ASS fok

<<< Socf Ion v /j7

0 .1

~

)

l l

l'i

~ v tf t

OPERATING DATA REPORT DOCKET NO. 50 2~4 UNIT Ill Girina Station DATE 'Februar 9 1976 revised COMPLETED BY a Andrew E. Pcfgap~ (~~~at ons Aide Ext. 291-214> at Ginna OPERATING STATUS

1. REPORTING PERIOD: GROSS HOUR81IN REPORTING PERIOD: 744
2. CURRENTLY AUTHOR)TED POWER LEVEL(MEIN~52 MAX. DEPEND. CAPACITY (MW .N I); 470
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe>et):
4. REASONS FOR RESTRICTION (IF ANY):

THIS MONTH YR TO DATE CUMULATIVE S. NUMBER OF HOURS REACTOR WAS CRITICAL

6. REACTOR RESERVE SHUTDOWN HOURS 66.2~ 66.2 ~'c 358.335'03"
7. HOURS GENERATOR ON LINE...,, ..... 371 371 ~40 283.63 8, UNIT REsERYE sHUTDowH H0URs ~.... ~.... ~ ~, ~ ~ ~ ~ ~ ~ ~ ~ 9 0 0 8 ~ 55"
9. GROSSTHERMALEHERGYGENERATED(MWH)...,.......,., ~532 560 ~532 560 5099039434 IO. GROSS ELECTRICAL ENERGY GENERATED (MWII) ...,....... ~175 205 ~175 205 169 9819066 II. NET ELECTRICAL EHERGY GEHERATED(MWH)........,..., ~166 526 ~166 526 169058 ~ 891
12. REACTOR SERVICE FACTOR ~ ~ ~ ~ ~ 9 ~

'iaA6

13. REACTOR AVAILABILITYFACTOR '5996",9999 ~68 YNY
14. UNIT SERVICE FACTOR...... ~ .. ~.... ~ . 49. 9% 49.9% 74.3%
15. UHIT AVAILABILITYFACTOR 49 '% 49.9% 74.35%

(~

'6.

UNIT CAPACITY FACTOR (U ~ I 9 MDC)........ ~j'j ~6037

)...............

12. UNIT CAPACITY FACTOR (U ~ I 9 D
18. UNIT FORCED OUTAGE RATE IS MW
19. SHUTDOWNS SCHEDULED OYER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH)2

(~6 5lL13%

()~6 00 LV '~6 67 03%

20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUPS A r>1 1t
21. UNITS IN TEST STATUS (PRIOR To COMMERCIAL OPERATION)s FORECAST ACHIEVED INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION

>> Cumul'atrlve. data commencing January 1975

~ To correct previously reported figures 1>

40 88 REVr 10/75

h o

o

~ 4 ~ 4 ~ 4 IP

e>PERATIRG DATA REPORT DOCKET NO.

UNIT II1 Ginna Station DATE Februar 9 1976 revised COMPLETED BY

( 2CEP9 Hg ~~I (ME~~

Andrew E. ((cf~~ihla~a~ (p~~at ons Aide Ext. 291-2149 at Ginna OP E RAT IN G STATUS

2. CURREHTLY AUTHORIZED POIYER LEVEL (MWO:~52 IAAE. DEPEHD. CAPACITY (MW .H I( 470 DESIGN ELECTRICAL RATIHG (Milo.Hot): 470
3. POWER LEVEL TO WHICH RESTRICTED (IF AHY) (MWo.Hot):
4. REASONS FOR RESTRICTIOH (IF ANY):

THIS MONTH YR TO DATE CUIAULATIYE

5. NUMBER OF HOURS REACTOR WAS CRITICAL 376.89 376.89 41 545.59 6 ~ REACTOR RESERVE SHUTDOWH HOURS ~

66 2-'("- 66. 2 (-'( 358. 335'-'(

7. HOURS GEHERATOR OH LINE . ~ ~ . ~......, ~, ~ . ~.... ~ ~ ~ 371 371 40,283.63
8. UNIT RESERYE SHUTDOWH HOURS 0 0 8. 5"(
9. GROSS TtIERMAL EHERGY GENERATED (MWH)..........., .. 5329560 5329560 5099039434
10. GROSS ELECTRICAL ENERGY GENERATED (thWH) .. ~175 205 175 205 16,981,066 ll. tIET ELECTRICAL ENERGY GENERATED (MWH)........... 166 526 1669526 1690589891-
12. REACTOR SERYICE FACTOR
13. REACTOR AVAILABILITYFACTOR ~9 6 1(4 ~76 8.~'1
14. UHIT SERVICE FACTOR.... 49. 9% 49. 9% 74.3%

IS. UNIT AVAIL.AGILITYFACTOR 49. 9% 49. 9% 74.35%

16. UHIT CAPACITY FACTOR (Using MDC) ~ ~ ~6J, 67 03%
17. UNIT CAPACITY P*CTOR (U ~ I g D Ig Ml'I I. ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~4 6'7.03%
18. UNIT FORCED OUTAGE RATE '!KJ2%
19. SHUTDOWHS SCtlEDULED OYER NEXT 6 MONTIIS (TYPE, DATE, AHD DURATION OF EACH):
20. IF SHUT DOWN AT EHD OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: A ri1 19
21. UNITS IH TEST STATUS (PRIOR TO COMMERCIAL OPERATION)2 FORECAST ACHIEVED INITIAL CRITICALITY ItllTIALELECTRICITY COMMERCIAL OPERATIOH Cumulative data commencing January 15 1975 9( To coxxect previous1y reported figures 40 bs (2EVP 20/727

PERATING DATA REPORT DOCKET HO.

'tl Ginna Station DATE Februar 9 1976 revi sed coMPLETED BY(dao M .+/7 AT

'AndreN E. I(ICIIIIIIalah (p~rat ona Aide Ext. 291-214, at Ginna OP E RATING STATU 5

2. CURRENTLY AUTIIORIZED POIYEII LEVEL (MIY1): J 520 HAX DE.PEND, CAPACITY (III IN '470 Il:
3. PO'HER LEVEL TO 'WHICH RESTRICTED (IF ANY) (MWo-Not):
4. REASONS FOR RESTRICTION (IF ANY):

THIS MONTH YR TO DATE CUMULATIVE S. I(UMBER OF HOURS REACTOR iI*5 CRITICAL........., 576.8O>>6 ~ BO ~4> >4>.>~

EACTOR RESERV SHUTDOWN HOURS

7. HOURS GENERATOR OH I.IHE 371 371 405283.63
8. UHIT RESERVE SHUTDOWH HOURS 0 0 8.5 8
9. GROSS THERMAL ENERGY GENERATED(MWH)... ~......., .. 5325560 532,560 505903,434

'ID. GROSS ELECTRICAL BIERGY GEIIERATED (MIIH) .......,... ~175 205 175,205 1.6 981,066

}I. HRT ELECTRICAL ENERGY GENERATED (MIYII},,,...,...,. ~166 526 166,526 1650585891.

FACTOR,,.........,....,.........

S

12. REACTOR SERVICE
13. REACTOR AVAILABILITYFACTOR ~9OERI':: 59 6 -': 76~8'a
14. UNIT SERVICE FACTOR. 49. 9% 49.9% 74.3%

1S. UHIT AVAILABII.ITYFACTOR 49.9% 49.9%

UHIT CAPACITY FACTOR (Using MDC) ~6~3%

16 ~

17. UHIT CAPACITY FACTOR (Uolng Design MWe) . ~ ~ ~ . 47I6', '~kJ2i'4.35%

~i7 6A 67 '3%

18. UHIT FORCED OUTAGE RATE iKJ3%
19. SIIUTDOWHS SCHEDULED OVER NEXT 6 hlOHTHS (TYPE, DATE, AHD DURATION OF EACH):

S

20. IF SHUT D017N AT EHD OF REPORT PERIOD, ESTIMATED DATE OF STARTUPi ~ ril lt
21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

>" Cumulative data commencinp 'January 1> 1975 52 . To correct previously reported figures 40 88 RIP S/ 10/75

'I 2

~

IPERATING DATA REPORT DOCi<ET NO. '0-2'~<

()NIT ltl Gtnna Stat ton DATE Februar 9 1976 revised COMPLETED BY~

Andrew E. ((c)~agama~ )~ezatkons Aide Ext. 291-214, at Ginna OPERATING STATUS

1. REPORTING PERIOD 6 GROSS HOURIIIIN REPORTING PERIOD: 744
2. CURRENTLY AUTHORIZED POWER LEVEL(MIYE:~52 IIIAX. DEPEND, CAPACITY (MW .N 4) 470 DESIGN ELECTRICAL RATING (MWo-Not)t 470
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWo.Not):
4. REASOHS FOR RESTRICTION (IF ANY):

THIS EIGHTH YR TO DATE CUMULATIVE S. NUMBER OF HOURS REACTOR WAS CRITICAL 376.89 376.89 41 545.59

6. REACTOR RESERVE SHUTDOWH HOURS 66. 29'-': 66. 2:"" 358. 335'-'-
7. HOURS GENERATOR ON LINE ......, .. ~,...,... ~ ~ ~ 371 371 409283.63
8. UNIT RESERVE SHUTDOWN HOURS 0 0 8.5 ('.

GRDSS THERMAL ENERGY GENERATED(MWH)..........., .. 5329560 5329560 50,903,434 ID. GROSS ELECTRICAL ENERGY GEHERATED (MYIH( ...,...,... ~175 205 175 205 16,981>4066 ll, II"T ELECTRICAL EIIERGY GENERATED (MIYH(,......,..... ~166 526 1669526 1690588891-

12. REACTOR SERVICE FACTOR P ~ ~ 'PIQ.rifi
13. REACTOR AVAILABILITYFACTOR 5996'v'5~6':"l: ~76 8'(:
14. UNIT SERVICE FACTOR 49.9% 49.9% 74.3%
15. UNIT AVAILABILITYFACTOR 49.9% 49.9% 74.35%
16. UNIT CAPACITY FACTOR (Ustng MDC)

((% ~6 Il. UNIT CAPACITY PACTUM(U*I 2 D Il MW (..............'. (4776', ~47 6'7.03%

18. UNIT FORCED OUTAGE RATE ~3413% ~KJX/.
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

ril V

20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUPS A 1t
21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)1 'ORECAST ACHIEVED INITIAL CRITICALITY INITIALELECTRICITY COMMERCIAL OPERATIOH Cumulative data commencing January 19 1975

"-'- To correct previously reported figures 4(7 88 BGV to/7(5

~

~

lV

~

PERATIRO DATA REPORT DOCKET NO.

Nl Ginna Station DATE Febrnar 9 1976 ~zevised COMPLETED OY(NMa~a .~27

'Andrew 8. (Ic))I)h)a)ah [Fmat ons Aide Ext. 291-214, at Ginna OPERATING STATUS

1. REPORTIHG PERIOD: 6 GROSS HOURBtIH REPORTING PERIOD: 744
2. CURRENTLY AUTHORIZED POWER LEVEL(MWi)(~52 l(AX. DEPEND. CAPACITY (MW .H ()(: 470 DESIGtt ELECTRICAL RATIHG (IAWo.Not)i 470
3. POWER LEVEL TO WHICH RESTRICTED (IF AHY) (MWo Not):
4. REASONS FOR RESTRICTION (IF ANY):

THIS MONTH YR TO DATE CUhIULATIVE

5. NUMBER OF HOURS REACTOR WAS CRITICAI. 376.89 376.89 41 545.59
6. REACTOR RESERVE SHUTDOWN HOURS.... 66 ~ 2vvvv 358 ~ 33 vis
7. HOURS GEHERATOR OH LINE ~

371 371 409283,63

8. UHIT RESERVE SHUTDOWN HOURS 0 0 8.5
9. GROSS TIIERMAL ENERGY GENERATED (MWH).............. 532 560 532 560 50,903,434
10. GROSS ELECTRICAL ENERGY GEHERATEO(IIWH) ........... ~17> 205 ~175 205 1629812066 II. IIET ELECTRICAL ENERGY GENERATPD
12. REACTOR'SERVICE FACTOR .
13. REACTOR AVAILABILITYFACTOR (MIIH),...,...,,...

2

~166 526

~~6"-':

')0%6 ~~1661~526

~)

ldiy058 (891.

~6%-': ~76 8'::

14. UtIIT SERVICE FACTOR. 49. 9% 49. 9% 74. 3%
15. UNIT AVAILABILITYFACTOR 49. 9% 49. 9% 74. 35%

((1~ ~<03%

16. UNIT CAPACITY FACTOR (Using MDC)
17. UNIT CAPACITY FACTOR
18. UtllT FORCED OUTAGE RATE (using Design MWe) .. ..

~ ~ ..... ~6 (ZZE

~4~6 IZ/

67.03%')0 19 SHUTDOWHS SCHEDULED OVER HEXT 6 MOHTHS (TYPE, DATE, AND DURATION OF EACH):

20. IF sHUT DowN AT EHD 0F REPDRT PERIDD, EsTlhlATED DATE oF sTARTUPE ~ ril 1 t
21. UNITS IN TEST STATUS (PRIOR To COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIALELECTRICITY COMMERCIAI. OPERATIOH Cumulative data commencing January 1 1975 >

5'bo TO COrreCt preViOuSly repOrted figureS 40 08 It)TVP 10/70

PERATINB DATA REPORT DOCKET NO.

I/1 Ginna Station DATE Februar 9 1976 revised COMPLETED DY (MMDWI~F,W Andrew 8. )1(c))IIIIG1RI (perec one Aide Ext. 291-214, at Ginna OPERATING STATUS

1. REPORTIHG PERIOD: GROSS HOURIIIIN REPORTING PERIODE 744
2. CURREHTLY AUTHDRIZED POWER LEVEL(MIIGC:~52 MAX OE.PEHD. CAPACITY (IAW .H 8: 470 DEslGN ELEGTRIGAL RATING (Mwe.Net)E 470
3. POWER LEVEL TO WHICH RESTRICTED (IF AHY) (MWe.Net):
4. REASOHS FOR RESTRICTIOH (IF ANY):

THIS IhONTH YR TO DATE CUMULATIVE S. HUMBER OF HOURS REACTOR IIAS CRITICAL ........., ...,, 376.89 376.89 ~41 545.59

66. 25'< - 358. 335'~'-
6. REACTOR RESERVE SHUTDOWH HOURS ~
66. 2 <'"
7. HOURS O'EHERATOR OH LIHE 371 371 405283.63
8. UNIT RESERVE SHUTDOWH HOURS .... ~..... ~..........

~

0 0 8.

(MWH).......,..... ~532 560 5059035434 5~'325560

9. GROSS TIIERMAL EIIERGY GEHEIIATED

'lg. GROSS ELECTR)CA). EIIERGY GEHERATED (MWH) ......,.... ~175 205 ~175 205 149 9818066 li. I(ET ELECTRICAL EIIERGY GEHERATED (IIWH).......,...., ~166 526 146g 526 1680588891.

12. REACTOR SERVICE FACTOR . '81&iL
13. REACTOR AVAILABILITYF ACTOR 5996'." w 55 4+ 9 17"8 8TA."'4.

UNIT SERVICE FACTOR . 49. 9% 49.9% 74.3%

15. UHIT AVAILABILITYFACTOR 49.9% 49.9% 74.35%
16. CHIT CAPACITY FACTOR (U I g SIDC) ................... '((i+  % 6~6 ~6 03%

)...,....,,...., ~7~6 17, UIIIT CAPACITY FACTOR UHIT FORCED (U I g D Hg IAI(

OUTAGE RATE ...,,.....,,....,...,... "iJL13% ~(L1W.

19. SHUTDOWNS SCIIEDULED OVER HEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

~6%

~6 67.03%'8

20. IF SHUT DOWH AT END OF REPORT PERIOD, ESTIAIATED DATE OF STARTUPE
21. -UNITS IH-TESTYSTATUS (PRIOR TO COMMERCIAL OPERATIOH)s FORECAST ACHIEVED INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATIOII Cumulative, data commencing January 1> 1975

-': To correct previously reported figures

~ ~

PERATING DATA REPORT DOCKET No. '0-2'~<

UNIT Nl Gttina Station DATE FebTUOT 9 1976 LTZeviserl COMPLETED BY~

Andxew E. Mcftlhsisi )pS5st ons Aide Ext. 291-214t at Ginna OPERATING STATUS GROSS HOURfhlH REPORTING PERIODE 744

2. CURRENTLY AUTHORIZED POWER LEVEL (MWil:~52 MAX. DEPEND. CAPACITY (IIW NN)l 470 DESIGN ELECTRICAL RATING (MYlo.Not)i 470
3. POWER LEVEL TO 'I'WHICH RESTRICTED (IF ANY) (MITo.Not)t
4. REASONS FOR flESTRICTION (IF ANY):

THIS IhONTH YR TO DATE CUMULATIVE S. NUMBER OF HOURS REACTOR YIAS CRITICAL 376.89 376.89 41 545.59

6. REACTOR RESERVE SHUTDOWN HOURS.

66.2 -': 66 25'-:- 358. 335'-':

'I. HOURS GEHERATOR ON LINE 371 371 40t283.63

8. UNIT RESERVE SHUTDOWN HOURS 0 0 8.5
9. GROSS THERMAL EHEIIGY GENERATED(M)YH)........,..... ~532 560 5321t560 50s903s434 IG. GROSS ELECTIIICAL ENERGY GEIIERATED (MIIH)....,, . ~175 205 ~175 205 16,981,066 II. NET ELECTRICAL ENERGY GENERATED (Ml)H)....,,...,... ~166 526 166,526 16,058,891.

s

12. REACTOR SERVICE FACTOR '(0 66 ~ 6'sr dfL
13. REACTOR AYAILABILITYFACTOR Lo ~

~ ~

AA ~9 76 j8'.:.s

14. UHIT SERVICE FACTOR 49. 9% 49. 9% 74. 3%
15. UHIT AYAII.ABILITYFACTOR 49. 9% 49. 9% 74.35%

~603%

16. UHIT CAPACITY FACTOR (Uslntt IhDC)
17. UHIT CAPACITY P*CTOR (U s D *Is MW )............... ~47 6'76 ~6 67. 03%

~

I UNIT FORCED OUTAGE RATE...., ., ..~ ~KJ3% 1FJ.

'8.

19. SHUTDOIYNS SCHEDULED OVER HEXT 6 IAOHTHS (TYPE, DATE, AND DURATIOH OF EACH):
20. IF sHUT D0MN AT END 0F REP0RT PERloD, EsTIhIATED DATL 0F sTARTUPE A ril lt 2l. UNITS IH TEST STATUS (PRIOR TO COMMERCIAL OPERATIOH)t FORECAST ACHIEVED INITIAL CRITICALITY IHITIALELECTRICITY COMhIERCIAL OPERATION

< Cumulative data commencing January 1, 1975

-': To correct previously reported figures 49 SO tttAV lo/75

V

'OIPERATIIIG DATA REPORT DOCKET NO.

UNIT i/1 Ginna Station DATE Febxuar 9 1976 revised CGMPLETEG GY~~YP..<>l GS~~

'Andrew E. )SOII(tie~ah )p8rac ona Aide Ext. 291-214> at Ginna OP ERATIHG STATUS g

2. CURRENTLY *UTNORIZEG POWER LEYEI. (MWI) ~52 MAX, OEPENG. CAPACITY (IIIT .N I) 470 DESIGH ELECTRICAL RATING (MWo Not)S 470
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWo-Not):
4. REASONS FOR RESTRICTION (IF ANY):

THIS MONTH YR TO DATE CUMULATIVE S. NUMBER OF HOURS REACTOR WAS CRITICAL ~... ~ ~

376.89 376.89 41 545.59

6. REACTOR RESERVE SHUTDOWH HOURS
66. 2"-v 66. 2'-" 358. 33"-'-
7. HOURS GEHERATOR OH LINE 371 371 40,283,63
8. UHIT RESERVE SHUTDOWH HOURS 0 0 8.5
9. GROSS THERMAL ENERGY GENERATED(MWH)..........., .. 5329560 5329560 505903,434 Ig. GROSS ELECTRiCAL ENERGY GENERATEG (I'IITN)..., ...., . ~175 205 ~175 205 26I 981g066 11 ~ NET EI.ECTRICAL ENERGY GEHERATED (MWH)...,,,,...... 166 526 166,526 16,058,891-
12. REACTOR SERVICE FACTOR
13. REACTOR AVAILABILITYFACTOR ~ .. 5'))571 5~6'" ~76. 8 "w':
14. UHIT SERVICE FACTOR 49.9% 49.9% 74.3%
15. UNIT AVAILABILITYFACTOR 49.9% 49.9% 74.35%

'l6. UN'IT CAPACITY FACTOR (Using IADC) (47 I'I. ~6 03%

)T. VIIIT CAPACITY FACTOR (U I g O Ig lili )............... ~47 6 (LTA&6 67.03%

18. UNIT FORCED OUTAGE RATE 'ikey ')% Sd) J.Z/.
19. SHUTDOWHS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AHD DURATION OF EACH):
20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIIAATED DATE OF STARTUP:
21. UNITS IH TEST STATUS (PRIOR TO COAIMERCIAL OPERATION): FORECAST ACHIEVED IHITIAL CRITICALITY INITIALELECTRICITY COMMERCIAL OPERATIOH Cumulative. data commencing Januaxy 15 1975

-.> To corxect previously reported liguxes 40 88 RSAV 20j7(S

"0

~. ~

r

~ ~

0 ERATING DATA REPORT Doci<ET No. 'o-2'I<

Ill Ginna Station DATE Februar 9 1976 revised COIIPLETED EY~S,+F7 WlSE~LFLX

8. )(O))(h)D1eh IIDMGC%ons Aide

'Andrew Ext.'91-214> at Ginna OPERATING STATUS

1. REPORTING PERIOD: T~ r GROSS HOUR(hIN REPORTING PERIOD: 744 S. CURRENTLY AUTIIORIXEO POWER LEYEL (IIYh) ~(52 IAAX DEP.EHD. CAPACITY (MW .N 1)l 470 DESIGN ELECTRICAL RATING (Mwe.N,2)E 470
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe.Net):
4. REASONS FOR RESTRICTION (IF ANY):

THIS MONTH YR TO DATE CUMULATIVE S. NUMBER OF HOURS REACTOR WAS CRITICAL 376.89 376.89 41 545.59

6. REACTOR RESERVE SHUTDOWN HOURS 66.2>>>> 66. 2 -': 358. 335'>>

7 ~ HOURS GENERATOR ON I.INE 371 371 409283.63

8. UNIT Rf SERVE SHUTDOWN HOURS 0 0 8.5>>
9. GROSS TH l!IIAL )!ERGY GEN-I)AWED (I,',",IH)....,...,,..., ~532 560 ~532 560 50,903,43(I

)O. GROSS ELECTR(CAL ENERGY GENERATED (MWH),...,...... ~175 205 ~175 205 16,981,066 ll. NET ELEOTR)cAL El(ERGY GENERATED(ewH)............. ~166 526 166I526 16s058s891.

A

12. REACTOR SERVICE FACTOR . ~0W6

" 5567""0

13. REACTOR AVAILAIIILITYFACTOR ALT 76 8'(6'4 UNIT SERVICE FACTOR, 49 ~ 9% 49 ~ 9% 74.3%

FACTOR,..... ..,,....,..., 49 ~ 9% 49 ~ 9% 74.35%

15. UNIT AVAILABILITY IS. UHIT CAPACITY FACTOR (U ~ I S IIDC)
17. UNIT CAPACITY FACTOR (Using Design

~

MWe).... . .. .

l~

~~6

~'/ ~6

~a 6(a. 67.03%

03%

~

~ ~ ~ ~ ~ ~ ~

ls. UIIIT FORCED OUTAGE RATE ...........,............. LQ 23% L0

19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)E FORECAST ACHIEVED INITIAL CRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION

>> Cumulat:ive data commencing January 1> 1975

>>>> To correct previously reported figures 4D Oe AIPVA 1(3/1()

,~ ~

AA 0 ERATING DATA REPORT DOCKET NO. '0-2'i<

UNIT II1 Ginnn Station DATE Februar 9 1976'evised k COMPLETED BY Andrew E. (Cc)gaga~ p~rat ons Aide Ext, 291-214, at Ginna OPERATING STATUS

2. CURREHTLY AUTIIORIZED POWER LEYEI. (MW>>)(~520 IAAX. DEPEND. CAPACITY (IIYI .N>>l: 470 DESIGN ELECTRICAL RATING (MWo-Not): 470
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWo.Not)t
4. REASONS FOR RESTRICTION (IF ANY):

I THIS MONTH YR To DATE CUMULATIVE I

376.89 545.59 S. NUMBER OF HOURS REACTOR WAS CRITICAL 2:"'76.89 41 358,33::

6. REACTOR RESERVE SHUTDOWN HOURS. 66. 66,2 c Y
67. HOURS GENERATOR ON LINE .. ~ .. ~ .. ~ ~ ., .. ~ .,,,..., . 371 371 409283.63
8. UNIT RESERVE SHUTDOWN HOURS ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 0 8.5 4
9. GPOSS THERMAL EHEPGY GEHEI',ATED (MWH) 532 560 532,560 50,903,43lh lg. GROSS ELECTRICAL ENERGY GEIIERATED (IIWH) ........... ~175 205 ~175 205 16,981,066 II. )IET ELECTRICAL ENERGY GENERATED (h(WH)....,,...,... ~166 526 ~166 526 16>>058>>891.
12. REACTOR SERVICE FACTOR
13. REACTOR AVAILABILITYFACTOR 5996A." 2 76 8'/6""
14. UNIT SERVICE FACTOR........... 49 ~ 9% 49 ~ 9% 74.3%

49.9% 49.9% 74.35%

15. UNIT AVAILABILITYFACTOR
16. UNIT CAPACITY PACTOR (U ~ I g MDC) ...................

)............

l~

4776

. (LT 32/

47 ~6

~603%

67.03%

~~7

12. UNIT CAPACITY I'ACTOR (U Mg D lg MW ~ ~

Ig. UNIT FORCED OUTAGE RATE ..........., . ~ ~ ~ ~ ~ ~ ~ ' ~ ~ ~

19. SHUTDOWHS SCHEDUI.ED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATIOH OF EACH):
20. IF SIIUT DOWN AT EHD OF REPORT PERIOD, ESTIMATED DATE OF STARTUPE 2'I. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)t FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

>2 Cumulative data commencing January 1> 1975

>Y>v To correct previously reported figures 4D oo tt lt V>> 10/1 2)

C M4