R. E. Ginna - Forwards Revised Unit Shutdown and Power Reduction Data Sheet for Monthly Operating Report for December 1975
ML18142B390
Person / Time
Site: Ginna Constellation icon.png
Issue date: 01/08/1976
From: Platt C
Rochester Gas & Electric Corp
To:
NRC/IE
References
Download: ML18142B390 (28)


Text

MONTHLY " PORTS iFOR GRAY BOOK PREPARATT0%

NRC bsoTRIBUTION FOR PART 50 DOCKE .'IATERIAL (TEMPORARY FORM)

CONTROL NO:

FILE MONTHLY REPORT FILE oc ester Gas & Elec. C rg,qTEOF DOC DATE R EC'D LTR TWX RPT .OTHER Rochester; N.Y. s C.E. P1att ORIG CC OTHER NRC 1 Si ned LO CLASS UNCLASS PROPINFO INPUT NO CYS REC'D DOCKET NO:

XXX DESCRIPTION: ENCLOSURES:

'Ltr trans the following: Monthly Report for DeCember 1975 Plant & Component Operability & Availability This Report to be used in preparing Gray Book by Plans & Operations.

NUMBER OP COPIES REC'D:

PLANT NAME:

FOR ACTION/INFORMATION BUTLER (L) SCHWENCER (L) ZIEMANN (L) BEGAN (E)

W/ Copies W/ Copies W/ Copies Vil/ Copies +0 NOT REMO~

CLARK (L) STOLZ (L) DICKER (E) LEAR (L)

\A// Copssss W/ Copies

'ARR (L) VASSALLO (L)- KNIGHTON (Ei SPELS W/ Copies W pies W/. Copies W/ Copies KNtEt (L) RPLE (L) YOUNGBLOOD (E)>> MIPC/PE W/ Copies W/ Copies W/ Copies W,4 Copies tNTERNAL DtSTRIBUTION G FI TECH REVIEW DENTON LIC ASST A/T I ND ~

~NR DR SCHROEDER GRIMES R. DIGGS (L) 8 RAITMAN OGC, ROOM P-506A. MACCARY GAMM ILL H. GEAR IN (L) SALTZMAN GOSSI CK/STAF F KNIGHT KASTNER E. GOULBOURNE (L) MELTZ CASE PAWLICKI BALLARD P. KREUTZER (E)

BOYD MOORE (L)

DEYOUNG (L)

SKOVHOLT (L)

GOLLER {L) {Ltr)

/ SHAO STE LLO HOUSTON NOVAK ROSS IPPOLI TO SPANGLER FNVIRO MULLER DICKER KNIGHTON

'. J. LEE (L)

M. RUSHBROOK S. REED (EI M.

S (L)

VICE (t )

SHEPPARD (L)

SLATER (E)

PLANS

~MCDONALD

~CHAPMAN DUBE (Ltr)

E. COUP.E PETERSON P. COLLINS TEDESCO YOUNGBLOOD H. SMITH (L) HARTFIELD (2)

DENISE J. COLLINS REGAN S. TEETS (L) KLECKER REG OPR LAINAS PROJECT LDR G. WILLIAMS(E) E ISENHUT FI I.F. 6 REGION (2) BENAROYA V. WILSON (L) Wl GG INl ON VOLLMER HARLESS R. INGRAM (L)

STEELE M DUN A~N K. PARRISH L EXTERNAL DISTRIBUTION

~1 LOCAL PDR~~Mm Rochester, N.Y.

P D R-SAN/LA/NY

~'l TIC (ABERNATHY) (1}(2)('IO) NATIONALLABS 1

~1 NSIC (BUCHANAN) 1 W. PENNINGTON, Rm E-201 GT 1 BROOKIHAVEN NAT LAB 1 ASLB 1 CONSULTANTS s 1 G. ULRIKSON, ORNL 1 Newton Anderson NEWMARK/BLUME/AGBABIAN 1 AGMED (RUTH GUSSMAN)

ACRS HOLDING/SENT Rm B-127.GT 1 J. D. RUNKLES, Rm E-201 GT

P ~

', t ZW/// SIXES

//I/IIII'ZFiH':

/ ////I//8'///I///////

ROCHESTER GAS AND ELECTRIC CORPO T AVENUE, ROCHESTER, N.Y. 14649 cj TELEIIHONE URIEL AREA coDE 7ld 546-2700 Ginna Station JP, ge.lBES.>~- January 8, 1976

~ReguTatorP

.r 'Ajtk.N<'irector,

~

1 Office of Inspection and Enforcement (P i l U. S. Nuclear Regulatory Commission /N Washington, D. C. 20555 e

Subject:

Monthly Report for December, 1975 (Revised)

Operating Status Information R. E. Ginna Nuclear Power Plant Unit No. 1 Docket No. 50-244 Gentlemen:

Pursuant to Technical Specification 6.9.1c attached herewith is a re-vised unit shutdown and power reduction data sheet, to correct previous error in reporting reasons for reductions in reactor power levels on 12/13, 12/21 and 12/23.

Very truly yours, gtP Charles E. Platt Superintendent CEP:fah Attachments 1

cc: Mr. James P. O'Reilly, NRC (1)

Mr. William G. McDonald, NRC (2)

t I

11

DOCKET NO. 50-244

SUMMARY

The reactor power levels averaged GINNA STATION, UNIT PI 99% during the period. The major exceptions were the power reduc- January 8, 1976(Revision)

DATE tions and Outage 814 detailed below. COMPLETED BY Andrew E. McNamara, Operations Aide TELEPHONE Ext. 291-214, at Ginna REPORT MONTH UNIT SHUTDOWN AND POWER REDUCTIONS METHOD OF TYPE SHUTTING DOWN F-FORCED DURATION CORRECTIVE ACTIONS/COMMENTS THE REACTOR OR NO. DATE S-SCHEDULED (HOURS) REASON (I) REDUCING POWER (2)

N/A 75 12 13 Reactor power level reduction to~47%=to perform T-'8B, Turbine Main Steam Stop Valves test.

N/A 75 12 21 A Reactor power level reduction to ~ 47% to perform M-54.2, Check condenser 1B-1 Water Box for Leaks with Freon.

N/A 75 12 23 A Reactor power level reduction to~47% to perform M-54.2, Check condenser 1B-1 Water Box for Leaks, with Freon.

14 75 12 30 43.75 "B" Steam Generator Tube Leak See Note)

NOTE: Unit remained shutdown through the end of report month.

(I) REASON: (2) METHOD:

A - EOUIPMENT FAILURE (EXPLAIN) I - MANUAL B - MAINT. OR TEST 2 - MANUAL SCRAM C - REFUELING 3 - AUTOMATIC SCRAM D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)

E - OPERATOR TRAINING AND LICENSE EXAMINATION F - ADMINISTRATIVE G - OPERATIONAL ERROR (EXPLAIN)

H - OTHER (EXPLAIN) .

+Power reductions were not previously reported. Data not available. Commencing January 1, 1976, this data wig bp pegprteg.~9

0 L'~,

DOCKET RO. 50-2i:C 5!ARY I The reactor power levels averaged UVIT RAvE GIRRA STATlos, UR'T AI 99Z durirg the period. The ma)or exceptions vere the power reduc- DATE January 8, 1976(Revision) tions and Oueage F'14 deeailed be'v. COMPLETED SY Andzev E. McNamara, Operations Aide TELEPHONE -7 4 Ext. 291-214, at Ginra REPORT MONTH UNIT S-uTDOIY'N AND POWER REDUCTIONS METHOD OF TYP E SHUTTING DOWN F-FORCED DURAT I OiN THE REACTOR OR CORRECT I VE ACT I ONS/COLNENTS NO. DATE S-SCHEDUI.ED (HOURS) REASON (I) REDUCING POWER (2)

N/A 75 12 13 Reactor power level reduction toL 47Z to perform T-18B, Turbine venin Seeam Stop Ualves test.

N/A 75 12 21 0 Reactor power level reduction to '47Z to perform M-54.2, Check condenser 1B-1 Mater Box for Leaks vith Freon.

N/A 75 12 23 Reactor power level reduceion to I47Z to perform N-54.2, Check condenser 1B-1 Mater Box for Leaks, with Freon.

75 12 30 43.75 "B" Steam Generator - Tube Leak See Note)

NOTE: Unit remained shutdown thzough the end of zeport onth.

(I) REASORI (2) MEiHOOI A EOUIPME .T FAILURE (EXPLAIII) I VARUAL S MAINT. OR TEST 2 - MARUA'cRAv.

C - REFUELING 3 - AUTOVATIC SCRAM 0 - REGUlATORY RESTRICTION 4 - OTHER (EXPLAIN)

E OPERATOR TRAII<IRG ARO lICEiiSE EXAvlRATIOR F - ADMINISTRATIVE OPERATIONAL ERROR (EXPLAIN)

H OTHER (EXPL*III)

RPower reducti'ons were not previously reported. Data not available. Commencing Januazy 1, 1976, this data I

> DOCKET NO. 50-244 PIARYI The reactor power levels averaged GIMNA STATION OMIT > ~ . DOCKET NO. 50-244 DIARYI The reactor pover levels averaged UNIT NAME GINNA STATIDN. UNIT <I 99Z during the period. The ma)or exceptions 'were the power reduc- DATE January 8, 1976(Revision) tions and Outage 814 detailed belov. COVPLETEO SY Andrew E. McNamara, Operations Aide TELEPHONE 7 6- 4 Ext. 291-214, at Ginna REPORT MONTH UNIT SI-QTDOWN AND POWER REDUCTIONS METHOD OF TYPE SHUTTING DOWN F-FORCED DURATION THE REACTOR OR CORRECTIVE ACTIONS/COAIVENTS DATE S-SCHEDULED (HOURS) REASON (I) REDUCING POWER (2) N/A 75 12 13 0 B Reactor power level reduction to~47Z to perfo~ T-18B, Turbine Yogin Steam Stop Valves test. N/A 75 12 21 0 Reactor power level reduction to '47Z to perform iM.-54.2, Check condenser 1B-1 Mater Box for Leaks with Freon. N/A 75 12 23 0 Reactor power level reduction to~47Z to perform if-54.2, Check condenser 1B-1 Vater Box for Leaks, with Freon. 14 75 12 30 43.75 "B" Steam Generator Tube Leak See Note) NOTE: Unit remained shutdown through the end of report onth. (I) REASON! (2) METNODI A - EQUIPME::T FAILURE (EXPLAIN) I - VasuaL D - MAINT. OR TEST 2 - MANUA'cRav. C - REFUELING 3 - AUTGvaTIc scpav D - REGULATORY RESTRICTION 4 - OTNER (EXPLA!N) E OPERATOR TRAINING ANO I.ICENSE EXAMINaTION F - ADMINISTRATIVE G - OPERATIONAL ERROR (EXPLAIN) H OTIIER'(EXPLAIN) ~power reductions were not .previouslv reported. Data not available. Connencing January 1, 1976, this data wiQ bp,ge@rte>'c The reactor power levels averaged UNIT NAVE GINNA STATION, UNIT AI 99K during the period. The na)or exceptions were the power reduc- DATE January 8, 1976(Revision) tions and Outage J)14 detailed below. COMPLETED 8Y Andrew E. McNamara, Operations Aide TELEPHONE 7 4 Ext. 291-214, at Ginna REPORT MONTH UNIT S.uTDOWN AND POWER REDVCTI(NS METHOD OF TYPE SHUTTING DOWN F-FORCED DURATION THE REACTOR OR CORRECT I VE ACT I ONS/CO.'i'MENTS NO. DATE S-SCHEDUI.ED (HOURS) REASON (I) REDUCING POWER (2) N/A 75 12 13 0 B Reactor power level reduction toL"47X to perform T-18B, Turbine Main Steam Stop Valves test. N/A 75 12 21 0 Reactor power level reduction to ~ 47X to perform M-54.2, Check condenser lB-1 Water Box for Leaks with Freon. N/A 75 12 23 S. 0 A Reactor power level reduction to I47/ to perform M-54.2, Check condenser 1B-1 Water Box for Leaks, with Freon. 14 75 12 30 43.75* "B" Steam Generator - Tube Leak See Note) NOTE: Unit remained shutdown through the end of report =anth. (I) REASON: (2) METHOOr A - EOUIPMENT FAILURE (EXPLAIN) I - MANUAL 8 - MAINT. OR TEST 2 MANUAL scRAV C - REFUELING 3 AU OuATIC SCRAu D - REGVLATORY RE'STRICTION 4 - OTHER (EXPL*III) F. - OPERATOR TR*INI:IG ANO LICENSE EXAul>>lATION F - ADMINISTRATIVE G OPERATIONAL ERROR (EXPLAIN) H - OTHER (EXPLAI.'I) ~Power reductions were not previously reported. Data not aVailable. CODmreneing January 1, 1976, thiS data WiQ bp pep>rtegr t O. DOCKET NO. 50-24'.!ARY I The reactor pover levels averaged UNIT NAME GLNVA STATIOV, UNIT LI 99X during the period. The ma)or exceptions vere the power reduc- DATE January 8, 1976(Revision) tions and Outage II14 detailed below. COMPLETED SY Andrew E. McNamara, Operations Aide TEIEPHONE -7 - 4 Ext. 291-214, at Ginna REPORT MONTH UNIT 3-uTDOII AND POWER REDUCTIONS METHOD OF TYPE SHUTTING DOWN F-FORCED DURATION THE REACTOR OR CORRECT I VE ACTIONS/COIN!ENTS DATE S-SCHEDULED (HOURS) REASON (I) REDUCING POWER (2) N/A 75 12 13 0 B Reactor power level reduction to'A 47X to perform T-18B, Turbine venin Steam Stop Ualves test. N/A 75 12 21 0 Reactor power level reduction to '47K to perform )(-54.2, Check condenser 1B-1 Water Box for Leaks vith Ereon. N/A 75 12 23 0 Reactor power level reduction to~47X to perform M-54.2, Check condenser 1B-1 Water Box for Leaks, with Freon. 14 75 12 30 43.75 "B" Steam Generator - Tube Leak See Note) of report onth. NOTE: Unit remained shutdown through the end (I) REASOV: A EOUIPAtE;:T FAILURE (EXPLAIN) 8 - MAINT. OR TEST C - REFUELING D - REGULATORY RESTRtCTION E OPERATOR TRAINING AND LICENSE EXAMINATION F ADAIINISTRATIVE G OPERATIONAL ERROR (EXPLAIN) H - OTHER (EXPLAIN) ~Power reductions vere not previously reported. Data not available. Commencing January 1, 1976, this data viQ bp,ge@rtegt>> ~ . > A DOCKET NO. 50-244 'MARY: The reactor power levels averaged UV I 'T VAilE Gl NNA STA'Tl OV, UV I ~ > DOCKET NO. 50-2(4 t.'!PRY I The reactor power levels averaged UVIT VAvE GINVA STATIOV. ~ v! T =', 99X during the period. The ma)or exceptions vere the power reduc- DATE January 8, 1976(Revision) tions and Outage f14 detailed below. COMPLETED 8Y Andrew E. McNamara, Operations Aide TELEPHONE 4 Ext. 291-214, at Ginna REPORT NORTH UNIT SI-IUTOOWiil AND POWER RFOUCTIGMS METHOD OF TYP E SHUTTING DOIlVN F-FORCED DURATION THE REACTOR OR CORRECTIVE ACTIONS/CONTENTS DATE S-SCHEDULED (HOURS) REASON (I) REDUCING POPOVER (21 N/A>> 75 12 13 Reactor power level reduction toA"47X to perform T-18B, Turbine Ruin Steam Stop Valves test. N/A 75 12 21 0 Reactor power level reduction to ~ 47X to perform )(-54.2, Check condenser lB-1 Mater Box for Leaks with Preon. N/A 75 12 23 0 Reactor power level reduction to~47! to perform H-54.2, Check condenser 1B-1 Vater Box for Leaks, with Freon. 14 75 12 30 43.75 "BH Steam Generator - Tube Leak See Note) NOTE: Unit remained shutdown through the end of report onth. (I) REASOMI (2) A!ETHOD: A - EOUIPUE::t FAII.ORE (EXPLAIN) I UAVQAI. 8 - MAINT. OR TEST 2 - MANUAL SCPAv. C - REFUELING 3 - AUTOVATIC SCRAM D - REGULATORY RESTRICTION C - OTHER (EXPLAIN) E - OPERATOR TRAINING AND LICENSE EXAvIMATIOV F - ADA'llNI STRATI YE G OPERATIONAL ERROR (EXPLAIN) H - OTHER (EXPI.AIN) ~power reductions were not previously reported. Data not available. Commencing January 1, 1976, this data w'QT bp ge+rtegt>> DOCKET NO. 50 AC VARY: The reactor power levels averaged UV IT NAVE GINNA STAT I OV, UN I T ~l 99% during the period. The ma)or exceptions were the power reduc- DATE January 8, 1976(Revision) t'ons and Outage LB14 detailed below. COMPLETED BY Andrew E. McNamara, Operations Aide TELEPMONE 7 4 Ext. 291-214, at Ginna REPORT MONTH uwtT 3.RJTOORM AND POMER REOUCTIGQS hIETHOD OF TYPE SHUTTING DOWN F-FORCED DURATION THE REACTOR OR CORRECTIVE ACTIONS/COI'MENTS NO. DATE S-SCHEDULED (HOURS) REASON (I) REDUCING POWER (2) N/A 75 12 13 0 Reactor power level reduction toL 47% to perform T-18B, Turbine wain Steam Stop Valves test. N/A 75 12 21 0 Reactor power level reduction to ~ 47% to perform )(-54.2, Check condenser 1B-1 Water Box for Leaks with Preon. N/A 75 12 23 0 Reactor power level reduction to~47% to perform "(-54.2, Check condenser 1B-l Water Box for Leaks, with Freon. 14 75 12 30 43.75 A "B" Steam Generator - Tube Leak See Note) NOTFI Unit remained shutdown through the end of repozt onth. (I) REASON: (2) METNODI A - EOUIPME .T FAILURE (EXPLAIN) I VANDAL B - MAINT. OR TEST 2 - VANUA'CRAV C REFUELING 3 AUTOVATIC SCRAM D - REGULATORY RESTRICTION OTHER (EXPLAIN) E - OPERATOR TRAltllNG AND LICENSE EXAVINATION F - ADXIINISTRATI YE G OPERATIOVAL ERROR (EXPLAIN) H - OTHER (EXPLAIN) IIPower reductions were not previouslv reported. Data not available. COIImIencing Januazy I, 1976, this data wig bp,gegrtegt '0 OOCKET NO.50-24C YI The eactor power levels averaged UNIT NAVE GINNA STATION, "NIT <> Ce