ML042080311

From kanterella
Jump to navigation Jump to search
June 2004 Monthly Operating Report for R.E. Ginna Nuclear Power Plant
ML042080311
Person / Time
Site: Ginna Constellation icon.png
Issue date: 07/09/2004
From: Widay J
Constellation Energy Group
To: Clark R
Document Control Desk, NRC/NRR/DLPM/LPD1
References
Download: ML042080311 (2)


Text

1503 Lake Road Ontario, New York 14519-9364 585.771.3000

. Constellation Energy R.E. Ginna Nuclear Power Plant, LLC July 9, 2004 US Nuclear Regulatory Commission Document Control Desk Attn: Robert Clark Project Directorate 1-1 Washington, DC 20555

Subject:

Monthly Report for June 2004 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Clark:

Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of June 2004.

Very truly yours, ago 47seph A. Widay ant Manager xc: U.S. Nuclear Regulatory Commission Mr. Robert Clark (Mail Stop O-8E9)

Project Directorate 1-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments

OPERATING DATA REPORT DOCKET NO. 5 .244 UNIT NAME Gilnna I DATE Jul y 08, 2004 COMPLETED BY Jol in Walden a e TELEPHONE (5E85) 771-3588 REPORTING PERIOD: June 2004

1. Design Electrical Rating 470.00
2. Maximum Dependable Capacity (MWe-Net) 480.00 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 4,367.00 251,365.22
4. Number of Hours Generator On-line 720.00 4,367.00 248,152.70
5. Reserve Shutdown Hours 0.00 0.00 8.50
6. Net Electrical Energy Generated (MWHrs) 355,430.00 2,165,580.00 113,363,081.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason I Down 2 Comments

SUMMARY

The unit operated at full power for the entire month of June. Average power for the month was 99.7%.

I 2 Reason: Method:

A Equipment Failure (Explain) I Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

Page 1 of 1