1503 Lake Road Ontario, New York 14519-9364 585.771.3000 Constellation Energy R.E. Ginna Nuclear Power Plant, LLC July 9, 2004 US Nuclear Regulatory Commission Document Control Desk Attn:
Robert Clark Project Directorate 1-1 Washington, DC 20555
Subject:
Monthly Report for June 2004 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Mr. Clark:
Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of June 2004.
Very truly yours,ago 47seph A. Widay ant Manager xc:
U.S. Nuclear Regulatory Commission Mr. Robert Clark (Mail Stop O-8E9)
Project Directorate 1-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments
OPERATING DATA REPORT DOCKET NO.
5 UNIT NAME Gil DATE Jul COMPLETED BY Jol TELEPHONE (5E REPORTING PERIOD:
.244 nna I y 08, 2004 in Walden a
e
- 85) 771-3588 June 2004
- 1.
Design Electrical Rating
- 2.
Maximum Dependable Capacity (MWe-Net) 470.00 480.00
- 3. Number of Hours the Reactor was Critical
- 4.
Number of Hours Generator On-line
- 5.
Reserve Shutdown Hours
- 6.
Net Electrical Energy Generated (MWHrs)
This Month 720.00 720.00 0.00 355,430.00 Yr-to-Date 4,367.00 4,367.00 0.00 2,165,580.00 Cumulative 251,365.22 248,152.70 8.50 113,363,081.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.
Date S: Scheduled (Hours)
Reason I Down 2 Comments
SUMMARY
- The unit operated at full power for the entire month of June. Average power for the month was 99.7%.
I 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
I Manual 2
Manual Trip/Scram 3
Automatic Trip/Scram 4
Continuation 5
Other (Explain)
Page 1 of 1