ML041130501

From kanterella
Jump to navigation Jump to search
March 2004 Monthly Operating Report for Ginna Nuclear Power Plant
ML041130501
Person / Time
Site: Ginna Constellation icon.png
Issue date: 04/09/2004
From: Widay J
Rochester Gas & Electric Corp
To: Clark R
Document Control Desk, NRC/NRR/DLPM/LPD1
References
Download: ML041130501 (2)


Text

Joseph A. Widay R OWg Always at Your Service Vice President and Plant Manager April 9, 2004 US Nuclear Regulatory Commission Document Control Desk Attn: Robert Clark Project Directorate 1-1 Washington, DC 20555

Subject:

Monthly Report for March 2004 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Clark:

Pursuantto Ginna ImprovedTechnical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of March 2004.

Very truly yours, Joeh k.Widay VP and Plant Manager xc: U.S. Nuclear Regulatory Commission Mr. Robert Clark (Mail Stop O-8E9)

Project Directorate 1-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments An equal opportunity employer 89 East Avenue I Rochester, NY 14649 tel (585) 546-2700 www.rge.com An Energy East Company

U S-OPERATING DATA REPORT DOCKET NO. 50 -244 UNIT NAME Gi nna 1 DATE Apiril 09, 2004 COMPLETED BY Jolhn V. Walden..

TELEPHONE (5 35) 771-3588 REPORTING PERIOD: March 2004

1. Design Electrical Rating 470.00
2. Maximum Dependable Capacity (MWe-Net) 480.00 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 2,184.00 249,182.22
4. Number of Hours Generator On-line 744.00 2,184.00 245,969.70
5. Reserve Shutdown Hours 0.00 0.00 8.50
6. Net Electrical Energy Generated (MWHrs) 369,582.00 1,084,071.00 112,281,572.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action S: Scheduled (Hours) Down 2 Comments

SUMMARY

The unit operated at full power for the entire month of March. Average power for the month was 99.7%.

1 2 Reason: Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

Page 1 of 1