Joseph A. Widay R OWg Vice President Always at Your Service and Plant Manager April 9, 2004 US Nuclear Regulatory Commission Document Control Desk Attn:
Robert Clark Project Directorate 1-1 Washington, DC 20555
Subject:
Monthly Report for March 2004 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Mr. Clark:
Pursuantto Ginna ImprovedTechnical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of March 2004.
Very truly yours, Joeh k.Widay VP and Plant Manager xc:
U.S. Nuclear Regulatory Commission Mr. Robert Clark (Mail Stop O-8E9)
Project Directorate 1-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments An equal opportunity employer 89 East Avenue I Rochester, NY 14649 tel (585) 546-2700 www.rge.com An Energy East Company
U S -
OPERATING DATA REPORT DOCKET NO.
50 UNIT NAME Gi DATE Ap COMPLETED BY Jol TELEPHONE (5
REPORTING PERIOD:
-244 nna 1 iril 09, 2004 hn V. Walden..
- 35) 771-3588 March 2004
- 1.
Design Electrical Rating
- 2.
Maximum Dependable Capacity (MWe-Net) 470.00 480.00 3.
4.
5.
6.
Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)
This Month 744.00 744.00 0.00 369,582.00 Yr-to-Date 2,184.00 2,184.00 0.00 1,084,071.00 Cumulative 249,182.22 245,969.70 8.50 112,281,572.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action S: Scheduled (Hours)
Down 2 Comments
SUMMARY
- The unit operated at full power for the entire month of March. Average power for the month was 99.7%.
1 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
1 Manual 2
Manual Trip/Scram 3
Automatic Trip/Scram 4
Continuation 5
Other (Explain)
Page 1 of 1