May 2003 Monthly Operating Report for R.E. Ginna
ML031681267
Person / Time
Site: Ginna Constellation icon.png
Issue date: 06/10/2003
From: Widay J
Rochester Gas & Electric Corp
To: Clark R
Document Control Desk, NRC/NRR/DLPM/LPD1
References
Download: ML031681267 (3)


Text

An Energy East Company ROCHESERGASANDELECIRCCORPORA71ON 89E4STAVENE,ROCHESTER,NY 14649-0001 585546-2700 wwwr.com June 10, 2003 US Nuclear Regulatory Commission Document Control Desk Attn:

Robert Clark Project Directorate 1-1 Washington, DC 20555

Subject:

Monthly Report for May 2003 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Clark:

Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of May 2003.

Very truly yours, s ep A. Widay Plant Manager xc:

U.S. Nuclear Regulatory Commission Mr. Robert Clark (Mail Stop O-8E9)

Project Directorate 1-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments TE/

I

OPERATING DATA REPORT 50-244 June 10,2003 COMPLETED BY:

TL John V. Walden TELEPHONE (585) 771-3588 OPERATING STATUS

1. Unit Name:

R.E. GINNA NUCLEAR POWER PLANT

2. Reporting Period:

May, 2003

3. Design Electric Rating (Net MWe):

470

4. Maximum Dependable Capacity (Net MWe):

480 Notes:

This Month Yr.-to-Date Cumulative**

5. Number of hours Reactor Was Critical
6. Hours Generator On-line
7. Unit Reserve Shutdown Hours
8. Net Electncal Energy Generated (MWH) 744.0 744.0 0.0 370027.0 3623.0 3612.1 0.0 1787788.4 242639.9 239471.2 8.5
  • 109116697.4
  • CUMULATIVE TOTAL COMMENCING NOVEMBER 8,1969

DOCKET NO: 50-244 UNIT NAME: R.E. GINNA NUCLEAR POWER PLANT DATE: June 10. 2003 COMPLETED BY: John V. Walden TELEPHONE: (585) 771-3588 UNIT SHUTDOWN REPORTING PERIOD:

May 2003 (MonthNear)

NO.

DATE TYPE DURATION REASON(')

METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS)

SHUTTING 5: SCHEDULED DOWN(2)

COMMENTS

SUMMARY

The unit operated at full power for the entire of the month of May. Average power for the month of May was 99.7%.

(1) Reason A - Equipment Fallure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/license Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

(2) Method 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4-Continuation 5 - Other (Explain)