An Energy East Company ROCHESERGASANDELECIRCCORPORA71ON 89E4STAVENE,ROCHESTER,NY 14649-0001 585546-2700 wwwr.com June 10, 2003 US Nuclear Regulatory Commission Document Control Desk Attn:
Robert Clark Project Directorate 1-1 Washington, DC 20555
Subject:
Monthly Report for May 2003 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Mr. Clark:
Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of May 2003.
Very truly yours, s ep A. Widay Plant Manager xc:
U.S. Nuclear Regulatory Commission Mr. Robert Clark (Mail Stop O-8E9)
Project Directorate 1-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments TE/
I
OPERATING DATA REPORT 50-244 June 10,2003 COMPLETED BY:
TL John V. Walden TELEPHONE (585) 771-3588 OPERATING STATUS
- 1. Unit Name:
R.E. GINNA NUCLEAR POWER PLANT
- 2. Reporting Period:
May, 2003
- 3. Design Electric Rating (Net MWe):
470
- 4. Maximum Dependable Capacity (Net MWe):
480 Notes:
This Month Yr.-to-Date Cumulative**
- 5. Number of hours Reactor Was Critical
- 6. Hours Generator On-line
- 7. Unit Reserve Shutdown Hours
- 8. Net Electncal Energy Generated (MWH) 744.0 744.0 0.0 370027.0 3623.0 3612.1 0.0 1787788.4 242639.9 239471.2 8.5
- 109116697.4
- CUMULATIVE TOTAL COMMENCING NOVEMBER 8,1969
DOCKET NO: 50-244 UNIT NAME: R.E. GINNA NUCLEAR POWER PLANT DATE: June 10. 2003 COMPLETED BY: John V. Walden TELEPHONE: (585) 771-3588 UNIT SHUTDOWN REPORTING PERIOD:
May 2003 (MonthNear)
NO.
DATE TYPE DURATION REASON(')
METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS)
SHUTTING 5: SCHEDULED DOWN(2)
COMMENTS
SUMMARY
- The unit operated at full power for the entire of the month of May. Average power for the month of May was 99.7%.
(1) Reason A - Equipment Fallure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/license Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)
(2) Method 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4-Continuation 5 - Other (Explain)