MONTHYEARIR 05000244/20243012024-10-22022 October 2024 Initial Operator Licensing Examination Report 05000244/2024301 ML24286A0022024-10-11011 October 2024 Core Operating Limits Report Cycle 45, Revision 0 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing RS-24-092, Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-09-25025 September 2024 Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000244/20245012024-09-24024 September 2024 LLC - Emergency Preparedness Biennial Exercise Inspection Report 05000244/2024501 IR 05000244/20240052024-08-29029 August 2024 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant (Report 05000244/2024005) ML24234A0922024-08-21021 August 2024 Requalification Program Inspection IR 05000244/20240102024-08-19019 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000244/2024010 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000244/20240022024-08-0505 August 2024 LLC - Integrated Inspection Report 05000244/2024002 and Independent Spent Fuel Storage Installation Report 07200067/2024001 ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) ML24170A3852024-07-16016 July 2024 R. E. Ginna Nuclear Power Plant - Alternative Associated with Inservice Testing of B Auxiliary Feedwater Pump - PR-03 ML24197A0302024-07-15015 July 2024 LLC - Operator Licensing Examination Approval RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions IR 05000244/20244022024-06-20020 June 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000244/2024402 RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24143A0752024-05-22022 May 2024 Re. Ginna Nuclear Power Plant and Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License ISFSI Casks ML24136A1692024-05-14014 May 2024 And Independent Spent Fuel Storage Installation (ISFSI) - 2023 Annual Radioactive Effluent Release Report and 2023 Annual Radiological Environmental Operating Report ML24134A0042024-05-13013 May 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000244/2024010 RS-24-049, Updated Notice of Intent to Pursue Subsequent License Renewal Applications2024-05-0909 May 2024 Updated Notice of Intent to Pursue Subsequent License Renewal Applications RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests IR 05000244/20240012024-04-24024 April 2024 LLC - Integrated Inspection Report 05000244/2024001 ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24101A0432024-04-10010 April 2024 2024 10 CFR 50.46 Annual Report IR 05000244/20240112024-04-10010 April 2024 LLC - Fire Protection Team Inspection Report 05000244/2024011 RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24088A2042024-03-28028 March 2024 R. E. Ginna Nuclear Power Plant - Response to NRC Request for Additional Information Regarding Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump ML24110A0122024-03-28028 March 2024 2023 Report of Individual Monitoring for R.E. Ginna Nuclear Power Plant LLC, License DPR-18 05000244/LER-2023-003-01, Re. Ginna Nuclear Power Plant, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam2024-03-0707 March 2024 Re. Ginna Nuclear Power Plant, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam IR 05000244/20230062024-02-28028 February 2024 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC, (Report 05000244/2023006) IR 05000244/20230042024-02-0505 February 2024 LLC - Integrated Inspection Report 05000244/2023004 ML24026A0112024-01-26026 January 2024 R. E. Ginna Nuclear Power Plant, Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump IR 05000244/20230102023-12-19019 December 2023 LLC - Age-Related Degradation Inspection Report 05000244/2023010 ML23348A0992023-12-15015 December 2023 R. E. Ginna Nuclear Power Plant – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0029 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23347A0092023-12-13013 December 2023 Annual Commitment Change Notification ML23346A0142023-12-12012 December 2023 LLC - Senior Reactor and Reactor Operator Initial License Examinations 05000244/LER-2023-003, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam Generator Level2023-12-11011 December 2023 Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam Generator Level ML23341A1252023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23321A1392023-11-17017 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information and Request for Additional Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums 05000244/LER-2023-002, Overtemperature Delta Temperature Reactor Protection System and Auxiliary Feedwater System Actuations on Due to 100% Load Rejection Caused by Turbine Overspeed Circuit Card Failure2023-11-0808 November 2023 Overtemperature Delta Temperature Reactor Protection System and Auxiliary Feedwater System Actuations on Due to 100% Load Rejection Caused by Turbine Overspeed Circuit Card Failure. IR 05000244/20230032023-10-25025 October 2023 LLC - Integrated Inspection Report 05000244/2023003 ML23292A0282023-10-19019 October 2023 LLC - Notification of Conduct of a Fire Protection Team Inspection RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23258A1382023-09-18018 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000244/2023010 IR 05000244/20230052023-08-31031 August 2023 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2023005) 2024-09-25
[Table view] |
Text
[Type here]
October 19, 2023
David P. Rhoades Senior Vice President Constellation Energy Generation, LLC President and Chief Nuclear Officer (CNO)
Constellation Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
R.E. GINNA NUCLEAR POWER PLANT, LLC - NOTIFICATION OF CONDUCT OF A FIRE PROTECTION TEAM INSPECTION
Dear David Rhoades:
The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC) staff will conduct a fire protection team inspection at your R.E. Ginna Nuclear Power Plant, LLC starting in March 2024. The inspection will be conducted in accordance with Inspection Procedure 71111 Attachment 21N.05, Fire Protection Team Inspection (FPTI), dated January 1, 20 20. The inspection team will be led by Jenn Tifft, a Reactor Inspector from the NRC Region I Office.
The inspection will verify that plant structures, systems, and components, and/or administrative controls credited in the approved fire protection program can perform their licensing basis function.
The schedule for the inspection is as follows:
- Information Gathering Visit : Week of January 15, 202 4
- Onsite I nspection: Weeks of March 4, 2024 and March 18, 2024
The purpose of the information gathering visit is to obtain information and documentation needed to support the inspection and to become familiar with the stations fire protection program, fire protection features, post -fire safe shutdown capabilities, and plant layout. During the information gathering visit, the team leader will select the specific samples to be reviewed during the onsite inspection weeks.
The enclosure lists the types of documents that will be needed prior to the information gathering visit. Please provide the referenced information to the Region I office by January 8, 2024.
Following sample selection, additional documents will be requested specific to those samples.
Your cooperation and support during this inspection will be appreciated.
If you have questions concerning this inspection or the inspection team's information request or logistical needs, please contact Jenn Tifft, Team Leader at (610) 337-5315, or via email at jennifer.tifft@nrc.gov.
D. Rhoades 2
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, under Control Number 3150- 0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
Glenn T. Dentel, Chief Engineering Branch 2 Division of Operating Reactor Safety
Docket No. 05000244 License No. DPR-18
Enclosure:
Fire Protection Team Inspection Supporting Documentation
cc w/ encl: Distribution via LISTSERV
D. Rhoades 3
SUBJECT:
R.E. GINNA NUCLEAR POWER PLANT, LLC - NOTIFICATION OF CONDUCT OF A FIRE PROTECTION TEAM INSPECTION DATED OCTOBER 19, 2023
DISTRIBUTION:
JTifft, DORS GDentel, DORS ECarfang, DORS EEve, DORS MHardgrove, DORS KSmetana, DORS JSchussler, DORS, SRI ACass, DORS, AA JJosey, RI OEDO RidsNrrPMREGinna Resource RidsNrrDorlLpl1 Resource
DOCUMENT NAME: https://usnrc.sharepoint.com/teams/EngineeringBranch2/Shared Documents/Fire Protection/90 Day Letter and Inspection Plan Templates/Ginna 2024 90-Day Letter.docx ADAMS ACCESSION NUMBER: ML23292A028 n -Sensitive Publvlle
Sensitive n -Publiclyvlable
OFFICE RI/DORS RI/DORS ME Jfft GDent TE 10/17/2023 10/18/2023 OFFIAL RERD CO
Fire Protection Team Inspection Supporting Documentation
If you have any questions regarding this information request, please contact Jenn Tifft at (610) 337-5315 or via email at jennifer.tifft@nrc.gov.
Electronic format is preferred. If electronic media is made available via an internet-based document management system, then document access must allow inspectors to download, save, and print the documents in the NRC's Regional office. Additionally, word-searchable documents are preferred, if available. Paper records (hard copy) are acceptable. At the end of the inspection, the documents in the teams possession will not be retained.
This document request is based on typical documents that a generic plant might have. As such, this generic document request is not meant to imply that any specific plant is required to have all of the listed documents. It is recognized that some documents listed below may not be available for your plant. In addition, the document titles listed below are based on typical industry document names; your plant specific document titles may vary.
Note that following sample selection, additional documents will be requested specific to those samples.
Please provide these documents to the inspection team leader in the Region I Office by January 8, 2024:
- 1. Copy of the Nuclear Safety Capability Assessment.
- 2. Copy of the Fire Hazards Analysis Report and/or NFPA 805 Design Basis Document.
- 3. Copy of the Fire Probabilistic Risk Assessment (Fire PRA) summary document, or full PRA document if summary is not available.
- 4. Copy of the NFPA 805 transition report, developed in accordance with NEI 04- 02.
- 5. Copy of the Post-Fire Human Reliability Assessment Calculation.
- 6. Copy of any Plant Change Evaluations completed since May 2021 (NFPA 805 Section 2.4.4).
- 7. Copy of any fire protection engineering equivalency evaluations completed since May 2021.
(NFPA 805 Section 2.2.7).
- 8. Copy of any other fire protection program design basis documents, if available.
- 9. List of change packages associated with any fire protection system, fire protection program, safe shutdown system, or nuclear safety capability modifications completed since May 2021.
Include a short description and/or title of each change.
- 10. List of all fire protection system impact screening reviews for any design changes, modifications, or temporary modifications completed since May 2021 (e.g., LS-AA-128 review, etc.). Include a short description and/or title of each review.
Enclosure
- 11. List of current fire protection system impairments, including description.
- 12. List of recovery actions and associated program procedure for validation of recovery actions, if not included above.
- 13. Thermal-hydraulic calculation or analysis that determines the time requirements for time-critical operator actions and/or recovery actions, if not included above.
- 14. Copy of the Updated Final Safety Analysis Report.
- 15. Copy of the Technical Requirements Manual.
- 16. Copy of station procedures used for fire safe shutdown from inside and outside of the control room (e.g., alarm response procedure, procedure for shutdown from the remote shutdown panel, etc.).
- 17. Copy of basis documents for the procedures in item 16, if available.
- 18. List of open and closed issue reports related to post-fire safe shutdown or alternative shutdown issues since May 2021 (e.g., issues affecting safe shutdown analysis, fire hazards analysis, safe shutdown operating procedures and/or training, timeline evaluations for operator actions, etc.). Include the issue report number and a brief description.
- 19. List of open and closed issue reports for fire protection system issues (e.g., fire pumps, detection, suppression, etc.) since May 2021. Include the issue report number and a brief description.
- 20. List of open and closed issue reports related to the fire brigade or fire drills since May 2021.
Include the issue report number and a brief description.
- 21. Copies of procedures, work orders, preventive maintenance tasks, or other documents which implement the commitments made as part of the license extension related to fire protection.
- 22. Copy of the Fire Protection Program and/or Fire Protection Plan Documents if not already included above.
- 23. Copies of the Fire Protection Program implementing procedures, if not already included above. This could include procedures for programs such as transient combustible controls, hot work, changes/modifications to the fire protection program, NFPA 805 monitoring program, etc.
- 24. Copies of any fire protection related self-assessments or audits performed since May 2021.
- 25. Copies of aging management programs applicable to fire protection including, but not limited to, the following:
- Above-ground metallic tanks
2
- Buried and underground piping and tanks
- 26. Copy of the Corrective Action Program Procedure(s)
- 27. Copies of the following condition reports:
4424323 4424527 4424635 4424750, PCR 21-01616