i 1503 Lake Road Ontario, New York 14519-9364 585.771.3000 Constellation Energy R.E. Ginna Nuclear Power Plant, LLC November 10, 2004 US Nuclear Regulatory Commission Document Control Desk Attn:
Robert Clark Project Directorate 1-1 Washington, DC 20555
Subject:
Monthly Report for October 2004 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Mr. Clark:
Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of October 2004.
Very truly yours, Thomas A. Marlow Plant Manager xc:
U.S. Nuclear Regulatory Commission Mr. Robert Clark (Mail Stop 0-8-C2)
Project Directorate 1-1 One White Flint North 11555 Rockville Pike Rockville, MD 20852 Regional Administrator U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments
OPERATING DATA REPORT DOCKET NO.
50-244 UNIT NAME Ginna 1 DATE November 03, 2004 COMPLETED BY John V. Walden,-..
TELEPHONE 585-771-3588 REPORTING PERIOD:
October 2004
- 1.
Design Electrical Rating
- 2.
Maximum Dependable Capacity (MWe-Net) 470.00 480.00
- 3.
Number of Hours the Reactor was Critical
- 4.
Number of Hours Generator On-line
- 5. Reserve Shutdown Hours
- 6. Net Electrical Energy Generated (MWHrs)
This Month 699.58 694.53 0.00 338,906.80 Yr-to-Date 7,274.58 7,269.53 0.00 3,579,950.80 Cumulative 254,272.80 251,055.23 8.50 114,777,451.8 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.
Date S: Scheduled (Hours)
Reason I Down 2 Comments 1
10/16/2004 F
50.47 A
1 Seal weld leak repair of charging check valve 9314.
SUMMARY
- The unit operated at full power from the begining of the month until October 15, 2004 at 22:12 at which time power was reduced for scheduled turbine stop valve testing and repair of charging check valve 9314. The unit was taken off-line on October 16, 2004 at 03:26 and reactor scrammed per procedure at 03:28. Following the completion of repairs, the reactor was made critical on October 18, 2004 at 00:53. The unit was placed on-line on October 18, 2004 at 05:54. Full power was reached on October 18, 2004 at 17:59 and remained there for the duration of the month.
1 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
1 Manual 2
Manual Trip/Scram 3
Automatic Trip/Scram 4
Continuation 5
Other (Explain)