R ~ An Energy East Company ROCHESTER GAS AND ELETRIC CORPORATION

  • 89 EASTAVENUE, ROCHESTERN.Y 14649-0001
  • 585 546-2700 ww.rge.om November 10, 2003 US Nuclear Regulatory Commission Document Control Desk Attn: Robert Clark Project Directorate 1-1 Washington, DC 20555

Subject:

Monthly Report for October 2003 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Clark:

Pursuantto Ginna ImprovedTechnical Specifications Section5.6.4, attached is the monthly operating status report for Ginna Station for the month of October 2003.

Very truly yours, Plant Manager xc: U.S. Nuclear Regulatory Commission Mr. Robert Clark (Mail Stop O-8E9)

Project Directorate 1-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments

I OPERATING DATA REPORT 50-244 November 10, 2003 COMPLETED BY:

KLJohn V. Walden TELEPHONE (585) 771-3588 OPERATING STATUS

1. Unit Name: R.E. GINNA NUCLEAR POWER PLANT Notes:
2. Reporting Period: October, 2003
3. Design Electric Rating (Net MWe): 470
4. Maximum Dependable Capacity (Net MWe): 480 This Month Yr.-to-Date Cumulative*
5. Number of hours Reactor Was Critical 412.5 6517.3 245534.2
6. Hours Generator On-line 378.5 6462.6 242321.7
7. Unit Reserve Shutdown Hours 0.0 0.0 8.5 *
8. Net Electrical Energy Generated (MWH) 168563.7 3142171.0 110471080.0
  • CUMULATIVE TOTAL COMMENCING NOVEMBER 8,1969
    • CUMULATIVE TOTAL COMMENCING NOVEMBER 8,1969

DOCKET NO: 50-244 UNIT NAME: R.E. GINNA NUCLEAR POWER PLANT DATE: November 10, 2003 COMPLETED BY: John V. Walden TELEPHONE: (585) 771-3588 UNIT SHUTDOWN REPORTING PERIOD: October2003 (Month/Year)

NO. DATE TYPE DURATION REASON(') METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS) SHUTTING l_____ S: SCHEDULED DOWN(2 ) COMMENTS 4 030915 S 366.5 C 1 Refueling and maintenance outage 5 031015 F 13.0 H 2 Loss of of site circuit reactor trip

%f: -V

SUMMARY

The unit began the month of October In a refueling shutdown which started on September 15, 2003. Following the completion of refueling and reactor head replacement, the I reactor was made critical on October 14, 2003 at 0729. High winds on October 15, 2003 caused a branch to lay across phases of offsIte circuit 751. The circuit opened and caused the loss f.v of one reactor coolant pump. Emergency procedures directed the manual scram of the reactor at 1025 on October 15, 2003. The reactor was made critical again at 2325 later the same day.

The unit was place on-line at 0630 on October 16, 2003. Full power was reached on October 20, 2003 and remained there through the end of the month.

(1) Reason (2) Method A - Equipment Failure (Explain) 1- Manual B - Maintenance or Test 2 - Manual Trip/Scram C- Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4- Continuation E - Operator Training/1cense Examination 5 - Other (Explain)

F -Administrative G - Operational Error (Explain)

H - Other (Explain)