August 2004 Monthly Report for R.E. Ginna Nuclear Power Plant
ML042660073
Person / Time
Site: Ginna Constellation icon.png
Issue date: 09/10/2004
From: Widay J
Constellation Energy Group
To: Clark R
Document Control Desk, NRC/NRR/DLPM/LPD1
References
Download: ML042660073 (2)


Text

1503 Lake Road Ontario, NewYork 14519-9364 585.771.3000 Constellation Energy R.E. Ginna Nuclear Power Plant, LLC September 10, 2004 US Nuclear Regulatory Commission Document Control Desk Attn:

Robert Clark Project Directorate 1-1 Washington, DC 20555

Subject:

Monthly Report for August 2004 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Clark:

Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of August 2004.

Very truly yours,

\\44L3 (jos&gh A. Widay)

Plant Manager K xc:

U.S. Nuclear Regulatory Commission Mr. Robert Clark (Mail Stop 0-8-C2)

Project Directorate 1-1 One White Flint North 11555 Rockville Pike Rockville, MD 20852 Regional Administrator U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments

OPERATING DATA REPORT DOCKET NO.

50-244 UNIT NAME Ginna 1 DATE September03 2004 COMPLETED BY John Walden TELEPHONE 585) 771-3588 i:-

REPORTING PERIOD:

August 2004

1. Design Electrical Rating
2. Maximum Dependable Capacity (MWe-Net) 470.00 480.00 3.

4.

5.

6.

Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)

This Month 744.00 744.00 0.00 360,422.00 Yr-to-Date 5,855.00 5,855.00 0.00 2,889,556.00 Cumulative 252,853.22 249,640.70 8.50 114,087,057.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.

Date S: Scheduled (Hours)

Reason 1 Down 2 Comments

SUMMARY

The unit operated at full power for the entire month of August. Average power for the month was 99.7%.

1 2

Reason:

A Equipment Fallure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

I Manual 2

Manual Trip/Scram 3

Automatic TriplScram 4

Continuation 5

Other (Explain)

Page 1 of 1