An Energy East Company ROCHESTERGASANDELECTRICCORPORATION
- 89EASTAVENUEROCHESTERNY 14649-0001
- 585546-2700 iww.rge.com February 9, 2004 US Nuclear Regulatory Commission Document Control Desk Attn:
Robert Clark Project Directorate 1-1 Washington, DC 20555
Subject:
Monthly Report for January 2004 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Mr. Clark:
Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station forthe month of January 2004.
Very truly yours, seh A. Widay Plant Manager xc:
U.S. Nuclear Regulatory Commission Mr. Robert Clark (Mail Stop O-8E9)
Project Directorate 1-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments
OPERATING DATA REPORT DOCKET NO.
50-244 UNIT NAME Ginna 1 DATE February 06, 2004 COMPLETED BY John V. Walden TELEPHONE (585) 771-3588.
REPORTING PERIOD:
January 2004
- 1. Design Electrical Rating
- 2.
Maximum Dependable Capacity (MWe-Net) 470.00 480.00
- 3.
Number of Hours the Reactor was Critical
- 4.
Number of Hours Generator On-line
- 5. Reserve Shutdown Hours
- 6. Net Electrical Energy Generated (MWHrs)
This Month Yr-to-Date Cumulative 744.00 744.00 247,742.22 744.00 744.00 244,529.70 0.00 0.00 8.50 368,978.00 368,978.00 111,566,479.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.
Date S: Scheduled (Hours)
Reason 1 Down 2 Comments
SUMMARY
- The unit operated at full power for the entire month of January. Average power for the month was 99.7%.
1 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
1 Manual 2
Manual Trip/Scram 3
Automatic Trip/Scram 4
Continuation 5
Other (Explain)