t-AAO Rg Z An Energy East Company ROCHESTER GAS AND ELECRIC CORPOMAJION

  • 89 EASTAVENUE, ROCHESTER, N.Y 14649-0001 585 546-2700 www.,excom April 10, 2003 US Nuclear Regulatory Commission Document Control Desk Attn: Robert Clark Project Directorate I-1 Washington, DC 20555

Subject:

Monthly Report for March 2003 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Clark:

Pursuantto Ginna Improved Technical Specifications Section 5.6.4, attached is the monthlyoperating status report for Ginna Station for the month of March 2003.

Very truly yours, sep A. Widay C}

Plant Manager xc: U.S. Nuclear Regulatory Commission Mr. Robert Clark (Mail Stop O-8E9)

Project Directorate 1-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments

OPERATING DATA REPORT 50-244 April 10, 2003 COMPLETEDBY: K J TL John V. Walden TELEPHONE (585) 771-3588 OPERATING STATUS

1. Unit Name: R.E. GINNA NUCLEAR POWER PLANT Notes:
2. Reporting Period: March, 2003
3. Design Electric Rating (Net MWe): 470
4. Maximum Dependable Capacity (Net MWe): 480 This Month Yr.-to-Date Cumulative**
5. Number of hours Reactor Was Critical 744.0 2160.0 241176.9
6. Hours Generator On-line 733.1 2149.1 238008.2
7. Unit Reserve Shutdown Hours 0.0 0.0 8.5 *
8. Net Electrical Energy Generated (MWH) 358503.4 1060698.4 108389607.4
  • CUMULATIVE TOTAL COMMENCING NOVEMBER 8,1969

I, DOCKET NO: 50-24 UNIT NAME- M.,

R.E..- GINNA NUCLEAR POWER PLANT _

DATE: April 10. 2003 COMPLETED BY: John V. Walden TELEPHONE: (585) 771-3588 UNIT SHUTDOWN REPORTING PERIOD: March 2003 (Month/Year)

NO. DATE TYPE DURATION REASON(') METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS) SHUTTING S: SCHEDULED DOWN(2) COMMENTS 1 030301 S 10.9 B 1 Feedwater regulator valve actuator repair AOV-4269 A A-L --

SUMMARY

The unit was shut down on March 1, 2003 for repairs to AOV-4269. Ginna Station was off-line from 0611 to 1704. Power was increased gradually and the unit reached full power at 0600 on March 2, 2003. The unit remained at full power for the remainder of the month. Average power for the month of March was 97.0%/6.

(1) Reason (2) Method A - Equipment Failure (Explain) 1- Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D- Regulatory Restriction 4- Continuation E - Operator Training/Umense Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)