I(ONTIILY Ie)RTS (FOR GRAY BOOK(REPARATIOII NRC DISTRIBUTION FOR PART 50 DOCKET MATERIAL (TEMPORARY FORM)
(P CONTROL NO:
FILF MONTHLY REPORT FILE FROM. Rochester Gas
& Elec.
Cor
'Rochester, N.Y.
'C.E. Platt TO:
'DATE OF DOC 12-4-75 ORIG DATE REC'D 12-11-75 CC,OTHER LTR TWX RPT
")Ixx SENT AEC PDR SENT LOCALPDR OTHER CLASS UNCLASS PROP INFO XXX INPUT NO CYS REC'D 1
DOCKET NO:
50-244 DESCRIPTION:
Ltr trans the following:
ENCLOSURES:
Monthly Rcport for November 1975 Plant 6 Component Operability & Availability This Report to be used in preparing Gray Book by Plans
& Operations.
i NUMBER OF COPIES REC'D:
1 PLANT NAME:
RE Ginna 0
1 FOR ACTION/INFORMATION SAB 12-12-75, BUTLER (L)
W/ Copies CLARK (L)
W/ Copies PARR (L)
W/ Copies KNIEL (L)
W/ Copies SCHWENCER (L W/ Copies STOLZ (L)
W/ Copies VASSALLO (L) opies RPLE (L)
W/ Copies
)
ZIEMANN(L)
REGAN (E)
W/ Copies W/ Copies DICKER (E)
LEAR (L)
KNIGHTON (E)
~CKNOWLEDQED
- W/ Copies W/ Copies YOUNGBLOOD (E)~ MIPC/PE W/ Copies W,4 Copies A TA~ D% MYHTP
~ vAJ.YPJVTI INTERNALDISTRIBUTION IL
GOSSI CK/STAFF CASE G IAMBUSSO BOYD MOORE(L)
DEYOUNG (L)
SKOVHOLT (L)
GOLLER (L) (Ltr)
P. COLLINS DENISE REG OPR FII,F. 8 REGION(2)
STEELE TECH REVIEW SCHROEDER MACCARY KNIGHT PAWLICKI SHAO STELLO HOUSTON NOVAK ROSS'PPOLITO TEDESCO J.
COLLINS LAINAS BENAROYA VOLLMER DENTON GRIMES GAMMILL KASTNER BALLARD SPANGLER ENVIRO IVIULLER DICKER KNIGHTON YOUNGB LOOD REGAN PROJECT LDR HAR LESS LIC ASST R. DIGGS (L)
H. GEARIN (L)
E. GOULBOURNE (L P. KREUTZER (E)
J. LEE (L)
M. RUSHBROOK {L)-
S. REED (E)
M. SE VICE (L)
EPPARD (L)
M. SLATER (E)
H. SMITH (L)
S. TEETS (L)
G. WILLIAMS(E)
V. WILSON (L)
R. INGRAM (L)
M DUNCA
~
A/T'IND.
BRAITMAN SA LTZMAN
)
ME LTZ PLANS
~ IVICDONALD
~ CHAPMAN DUBE (Ltr)
E. COUPE PETERSON
, HARTFIELD (2)
KLECKER
. EISENHUT WIGGINTON EXTERNALDISTRIBUTION LOCALPDR Lyons and Rochester, N. Y.
~1 TIC (ABERNATHY)
(1)(2)(10) NATIONALLABS
~1 NSIC (BUCHANAN) '
W. PENNINGTON, Rm E-201 GT 1 ASLB 1
CONSULTANTS 1 Newton Anderson NEWMAR K/BLUME/AGBA8IAN ACRS HOLDING/SENT 1 PD R-SAN/LA/NY 1 BROOKHAVENNAT LAB 1 G. ULRIKSON, ORNL 1 AGMED (RUTH'GUSSMAN)
Rm B-127 GT 1 J. D. RUNKLES, Rm E-201 GT
~ IIf I
I II//i7luV IIIIIIIIIII A HO
/IIIIlIg//
ISWil/
/I/II/IN II///ii/it/
ROCHESTER GAS AND ELECTRIC CORPORN IO
,-l ITALIC,"
EAST AVENUE, ROCHESTER, N.Y. 14649 apt gg f975
< ~>O'RR
~ga&
egufatory
'ELEPHONE ARE* coDE lid 546-2700 GFnnF(P tation December 4,
1975 Director, Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D.
C.
20555
Subject:
Monthly Report for November 1975 Operating, Status Information R.
E. Ginna Nuclear Power. Plant Unit No.
1 Docket No. 50-244 rP Pyp, Cg~
wPi+
'4 II o
Gentlemen:
Pursuant to Technical Specification 6.9.1c attached herewith is the monthly operating status report for Ginna St'ation for the month of
- November, 1975.
Also, ten additional copies of the attachment are enclosed.
C P~
Charles E. Platt Superintendent CEP:fah Attachments cc:
Mr. James P. O'Reilly, NRC (1)
Mr. William G. McDonald, NRC (2)
I'
'f
Ss~s OPERATING DATA REPORT 9
DOCKET NO UNIT
¹1 Ginna Station DATE December 4
1975 COMPLETED BY Andrew E.
c amara, pera 3.ons Aide
~
TELEPHONE Ext: 291-214 at Ginna 0 P E RA TIN G ST ATU 5 1.
REPORTIHG PERIOD:
November
~
1975 GROSS HOURS IN REPORTIHG PERIOD:
2.
CURRENTLY AUTHORIZED POWER LEVEL(MWI)1 MAX. DEPEND. CAPACITY (MW.H I):
DESIGN ELECTRICAL RATING (MW.H I):
3.
POWER LEVEL TO WHICH RESTRICTEP (IF AHY) (MWa4(et))
4.
REASONS FOR RESTRICTIOH (IF ANY):
THIS MONTH YR To DATE B NUMBER OF HOURS REACTOR WAS CRITICAL.........
~
~
~
~
~
720
~6149 6.
REACTOR RESERVE SHUTDOWN HOURS.
.~
292. 13 7.
HOURS GENERATOR ON LINE..
~
6 010.25 0
8.5 8.
UNIT RESERVE SHUTDOWN HOURS 9.
GROSS THERMAL ENERGY GENERATED(MWH)....,,...,....
1 085 784 8 670 259 16.
GROSS ELECTRICAL ENERGY GENERATED (MWH).......
362, 133 2,853,867 720 470 CUMULATIVE 40 468.42 292G13~
39 212.38 8,5%
49 334 578 16,460, 685
- 11. NET ELECTRICAL ENERGY GENERATED (MWH)...,....,....
344 991 2 712 655 15 563 817 12.
REACTOR SERVICE FACTOR
~
~
~
~
~
~
~
~
~
~
~
~.
~ ~,
100%
13.
REACTOR AVAILABILITYFACTOR 14.
UNIT SERVICE FACTOR
- 15. UNIT AVAILABILITYFACTOR 100%
100%
100%
16.
UNIT cAPAcITY FAcToR (U ~ I 6 MDO).................
101. 9'/
76.72%
80.37%
74.98%
75/72'6.
2%
76.75%
74.4%
74.4%
66.9%
19, UNIT CAPACITY FACTOR (U ~ I 6 D Is MW )......,........
101 9D1
~2
- 66. 9/
18.
UNIT FORCED OUTAGE RATE 0
~
~
~
~
~
19.
SHUTDOWNS SCHEDULED OYER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH)1 20.
IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP(
21.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION
~ Cumulative Data commencing January 1,
- 1975, 49 88 REV 10/75
AVERAGE DAILYUNIT POWER LEVEL DOCKET NQ.. 50 244 UNIT III Ginna Station December 4
1975 COMPLETED BY Andrew E. McNamara, Operations Aide TELEPHONE 1-716-546-2700 Ext. 291-214 at Ginna MONTH November 1
DAY AVERAGE DAILYPOWER LEVEL (MWe-Net)
DAY.AVERAGE DAILYPOWER LEVEL (MWe-Net) 7 10 12 13 14 16 481 483 482 481 482 481 481 482 481 480 17 18 20 21 22 23 20 25 26 27 28 29 30 31 482 482 481 481 480 INSTRUCTIONS On this form, list the average daily unit power level in MWe&et for each.day in the reporting month.
Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month. Note that when maximum depend-able capacity.'is used for the net electrical rating of the unit, there may'.be occasions when the daily average power level exceeds the 100% line (or the restricted power level line).'In such cases, the average dail'y unit power output sheet should be footnoted to explain the apparent anomaly.-
P II
DOCKET NO.
50-244
SUMMARY
Reactor Power Levels were maintained at approximately 99.5% during the reporting period.
The exceptions were the power reduc-tions detailed below.
REP0RT MQNTH November 1975 UNIT SHUTDOWN AND POWER REDUCTIONS.
G I NNA STAT I ON ~
UN I T O'I DATE December 4
1975 TELEPHONE 1-716-546-2700 Ext. 291-214 at Ginna NO ~
DATE TYPE F-FORCED S-SCHEDULED DURATION (HOURS)
REASON (I)
METHOD OF SHUTTING DOWN THE REACTOR OR REDUCING POWER (2)
CORRECTIVE ACTIONS/COMMENTS NA 751108 Reactor Power level reduction to perform T-18B, Turbine main steam stop valves test.
NA 751123 0" ~
Reactor power level reduction to 92% to perform T-18A, Intercept and reheat stop valves test.
(I)
REASON:
A -
EQUIPMENT FAILURE (EXPLAIN) 6 - MAINT. OR TEST C - REFUELING D -
REGULATORY RESTRICTION E " OPERATOR TRAINING AND LICENSE EXAMINATION F - ADMINISTRATIVE G - OPERATIONAL ERROR (EXPLAIN)
H - OTHER (EXPLAIN)
(2)
METHOD:
I -
MANUAL 2 - MANUAL SCRAM 3 -
AUTOMATIC SCRAM 4 -
OTHER (EXPLAIN)
+ Power reductions were not previously reported.
Data not available.
Commencing January 1, 1976"-'his data will be Rill'able.
re F