R. E. Ginna - Forwards Monthly Operating Status Report for Month of November 1975
ML18142B392
Person / Time
Site: Ginna Constellation icon.png
Issue date: 12/04/1975
From: Platt C
Rochester Gas & Electric Corp
To:
NRC/IE
References
Download: ML18142B392 (10)


Text

I(ONTIILY Ie)RTS (FOR GRAY BOOK(REPARATIOII NRC DISTRIBUTION FOR PART 50 DOCKET MATERIAL (TEMPORARY FORM) (P CONTROL NO:

FILF MONTHLY REPORT FILE FROM. Rochester Gas & Elec. Cor 'DATE OF DOC DATE REC'D LTR TWX RPT OTHER

'Rochester, N.Y.

'C.E. Platt 12-4-75 12-11-75 ")Ixx TO: ORIG CC,OTHER SENT AEC PDR SENT LOCAL PDR CLASS UNCLASS PROP INFO INPUT NO CYS REC'D DOCKET NO:

XXX 1 50-244 DESCRIPTION: ENCLOSURES:

Ltr trans the following: Monthly Rcport for November 1975 Plant 6 Component Operability & Availability This Report to be used in preparing Gray Book by Plans & Operations.

i NUMBER OF COPIES REC'D: 1 PLANT NAME: RE Ginna 0 1 FOR ACTION/INFORMATION SAB 12-12-75, BUTLER (L) SCHWENCER (L) ZIEMANN (L) REGAN (E)

W/ Copies W/ Copies W/ Copies W/ Copies CLARK (L) STOLZ (L) DICKER (E) LEAR (L)

W/ Copies W/ Copies PARR (L) VASSALLO (L) KNIGHTON (E) SPE LS ~CKNOWLEDQED W/ Copies opies -

W/ Copies W/ Copies KNIEL (L) RPLE (L) YOUNGBLOOD (E)~ MIPC/PE W/ Copies W/ Copies W/ Copies W,4 Copies A TA~ ~D% MYHTP v AJ.YPJVTI INTERNAL DISTRIBUTION IL TECH REVIEW DENTON LI C ASST A/T'IND .

~NRC PD SCHROEDER GRIMES R. DIGGS (L) BRAITMAN OGC, ROOM P-506A. MACCARY GAMMILL H. GEARIN (L) SA LTZMAN GOSSI CK/STAFF KNIGHT KASTNER E. GOULBOURNE (L) ME LTZ CASE PAWLICKI BALLARD P. KREUTZER (E)

G I AMBUSSO SHAO SPANGLER J. LEE (L) PLANS BOYD STELLO M. RUSHBROOK {L)- ~ IVICDONALD MOORE(L)

DEYOUNG (L)

HOUSTON NOVAK ENVI RO IVIULLER S. REED (E)

M. SE VICE (L)

~ DUBE (Ltr)

CHAPMAN SKOVHOLT (L) DICKER EPPARD (L) E. COUPE ROSS'PPOLITO PETERSON GOLLER (L) (Ltr) KNIGHTON M. SLATER (E)

P. COLLINS TEDESCO YOUNG B LOOD H. SMITH (L) ,

HARTFIELD (2)

DENISE J. COLLINS REGAN S. TEETS (L) KLECKER REG OPR LAINAS PROJECT LDR G. WILLIAMS(E) . EISENHUT FII,F. 8 REGION(2) BENAROYA V. WILSON (L) WIGGINTON VOLLMER HAR LESS R. INGRAM (L)

STEELE M DUNCA ~

EXTERNAL DISTRIBUTION LOCAL PDR Lyons and Rochester, N. Y.

~1 TIC (ABERNATHY) (1)(2)(10) NATIONAL LABS 1 PD R-SAN/LA/NY NSIC (BUCHANAN)

' W. PENNINGTON, Rm E-201 GT BROOKHAVEN NAT LAB

~1 CONSULTANTS 1

G. ULRIKSON, ORNL 1 ASLB 1 1 1 Newton Anderson NEWMAR K/B LUME/AGBA8 I AN 1 AGMED (RUTH'GUSSMAN)

ACRS HOLDING/SENT Rm B-127 GT 1 J. D. RUNKLES, Rm E-201 GT

~ II f I

I II//i7luV A HO I IIIIIIIIII ITALIC,"

/IIIIlIg// ISWil/ ,-l

/I/II/IN II///ii/it/

ROCHESTER GAS AND ELECTRIC CORPORN IO EAST AVENUE, ROCHESTER, N.Y. 14649

'ELEPHONE ARE* coDE lid 546-2700 egufatory GFnnF(P ta t ion apt gg f975 December 4, 1975

< ~>O'RR

~ga&

rP Director, Office of Inspection and Enforcement Pyp, U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Cg~

wPi+ '4 II

Subject:

Monthly Report for November 1975 Operating, Status Information o R. E. Ginna Nuclear Power. Plant Unit No. 1 Docket No. 50-244 Gentlemen:

Pursuant to Technical Specification 6.9.1c attached herewith is the monthly operating status report for Ginna St'ation for the month of November, 1975. Also, ten additional copies of the attachment are enclosed.

C Charles E. Platt P~

Superintendent CEP:fah Attachments cc: Mr. James P. O'Reilly, NRC (1)

Mr. William G. McDonald, NRC (2)

I'

'f

Ss~s OPERATING DATA REPORT 9

DOCKET NO UNIT ¹1 Ginna Station DATE December 4 1975 COMPLETED BY Andrew E. c amara, pera 3.ons Aide

~ TELEPHONE Ext: 291-214 at Ginna 0 P E RA TIN G ST ATU 5

1. REPORTIHG PERIOD: November ~ 1975 GROSS HOURS IN REPORTIHG PERIOD: 720
2. CURRENTLY AUTHORIZED POWER LEVEL(MWI)1 MAX. DEPEND. CAPACITY (MW .H I): 470 DESIGN ELECTRICAL RATING (MW .H I):
3. POWER LEVEL TO WHICH RESTRICTEP (IF AHY) (MWa4(et))

~

4. REASONS FOR RESTRICTIOH (IF ANY):

THIS MONTH YR To DATE CUMULATIVE B NUMBER OF HOURS REACTOR WAS CRITICAL ......... ~ ~ ~ ~ ~

720 ~6149 40 468.42

6. REACTOR RESERVE SHUTDOWN HOURS. 292. 13 292G13~
7. HOURS GENERATOR ON LINE ~

6 010.25 39 212.38

8. UNIT RESERVE SHUTDOWN HOURS 0 8.5 8,5%
9. GROSS THERMAL ENERGY GENERATED(MWH)....,,...,.... 1 085 784 8 670 259 49 334 578
16. GROSS ELECTRICAL ENERGY GENERATED (MWH) ....... 362, 133 2,853,867 16,460, 685
11. NET ELECTRICAL ENERGY GENERATED (MWH)...,....,.... 344 991 2 712 655 15 563 817
12. REACTOR SERVICE FACTOR ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ . ~ ~, 100% 76.72% 2%
13. REACTOR AVAILABILITYFACTOR 100% 80.37% 76.75%
14. UNIT SERVICE FACTOR
15. UNIT AVAILABILITYFACTOR 100%

100%

72'6.

74.98%

75/

74.4%

74.4%

16. UNIT cAPAcITY FAcToR (U ~ I 6 MDO) ................. 101. 9'/ 66.9%

19, UNIT CAPACITY FACTOR (U ~ I 6 D Is MW )......,........ 101 0

9D1 ~2 66. 9/

18. UNIT FORCED OUTAGE RATE ~ ~ ~ ~ ~
19. SHUTDOWNS SCHEDULED OYER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH)1
20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP(
21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION

~ Cumulative Data commencing January 1, 1975, 49 88 REV 10/75

AVERAGE DAILYUNIT POWER LEVEL DOCKET NQ.. 50 244 UNIT III Ginna Station December 4 1975 COMPLETED BY Andrew E. McNamara, Operations Aide TELEPHONE 1-716-546-2700 Ext. 291-214 at Ginna MON TH November 1 DAY AVERAGE DAILYPOWER LEVEL DAY. AVERAGE DAILY POWER LEVEL (M We-Net) (MWe-Net) 481 17 482 483 18 482 482 481 20 481 482 21 481 22 7 481 23 20 25 10 26 27 12 28 481 13 482 29 480 14 481 30 480 31 16 INSTRUCTIONS On this form, list the average daily unit power level in MWe&et for each.day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that when maximum depend-able capacity.'is used for the net electrical rating of the unit, there may'.be occasions when the daily average power level exceeds the 100% line (or the restricted power level line).'In such cases, the average dail'y unit power output sheet should be footnoted to explain the apparent anomaly.-

II P

DOCKET NO. 50-244

SUMMARY

- Reactor Power Levels were maintained G I NNA STAT I ON ~ UN I T O'I at approximately 99.5% during the reporting period. The exceptions were the power reduc- DATE December 4 1975 tions detailed below.

TELEPHONE 1-716-546-2700 Ext. 291-214 at Ginna REP0RT MQNTH November 1975 UNIT SHUTDOWN AND POWER REDUCTIONS.

METHOD OF TYPE SHUTTING DOWN F-FORCED DURATION CORRECTIVE ACTIONS/COMMENTS THE REACTOR OR NO ~ DATE S-SCHEDULED (HOURS) REASON (I) REDUCING POWER (2)

NA 751108 Reactor Power level reduction to perform T-18B, Turbine main steam stop valves test.

NA 751123 0" Reactor power level reduction to

~

92% to perform T-18A, Intercept and reheat stop valves test.

(I) REASON: (2) METHOD:

A - EQUIPMENT FAILURE (EXPLAIN) I - MANUAL 6 - MAINT. OR TEST 2 - MANUAL SCRAM C - REFUELING 3 - AUTOMATIC SCRAM D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)

E " OPERATOR TRAINING AND LICENSE EXAMINATION F - ADMINISTRATIVE G - OPERATIONAL ERROR (EXPLAIN)

H - OTHER (EXPLAIN)

+ Power reductions were not previously reported. Data not available.

Commencing January 1, 1976"-'his data will be Rill'able.