ML023520504

From kanterella
Jump to navigation Jump to search
November 2002 Monthly Operating Report for R.E. Ginna
ML023520504
Person / Time
Site: Ginna 
Issue date: 12/09/2002
From: Widay J
Rochester Gas & Electric Corp
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML023520504 (3)


Text

Rff An Energy East Company ROCHESTER GAS AND ELECTRIC CORPORATION

  • 89 EASTAVENUE, ROCHESTER, N Y 14649-0001
  • 585 546-2700 www rge corn December 9, 2002 US Nuclear Regulatory Commission Document Control Desk Attn:

Robert Clark Project Directorate I-1 Washington, DC 20555

Subject:

Monthly Report for November, 2002 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Clark:

Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of November, 2002.

Very truly yours, 0

t h A. Widay) ant Manager xc:

U.S. Nuclear Regulatory Commission Mr. Robert Clark (Mail Stop O-8E9)

Project Directorate I-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments

OPERATING DATA REPORT C

ERATING STATUS Unit Name:

R.E. GINNA NUCLEAR POWER PLANT Reporting Period:

November, 2002 Design Electric Rating (Net MWe):

470 Maximum Dependable Capacity (Net MWe):

480 50-244 December 9, 2002 OMPLETED BY: I John V. Walden TELEPHONE (585) 771-3588 Notes:

Number of hours Reactor Was Critical Hours Generator On-line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)

This Month 720.0 720.0 0.0 357224.0 Yr.-to-Date 7250.7 7209.0 0.0 3474037.2 Cumulative**

238272.9 235115.1 8.5 106959598.0

  • CUMULATIVE TOTAL COMMENCING NOVEMBER 8, 1969 OP
1.
2.
3.

4.

5.
6.
7.

8.

DOCKET NO: 50-244 UNIT NAME: R.E. GINNA NUCLEAR POWER PLANT DATE: December 9. 2002 COMPLETED BY: John V. Walden TELEPHONE: (585) 771-3588 UNIT SHUTDOWN REPORTING PERIOD:

November, 2002 (Month/Year)

SUMMARY

The unit operated at full power for the entire month of November. Average power for the month of November was 99.7%.

(1) Reason A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/LUcense Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

(2) Method 1 - Manual 2 -Manual Trip/Scram 3 -Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)

NO.

DATE TYPE DURATION REASON(1)

METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS)

SHUTTING

&: SCHEDULED DOWN(2)

COMMENTS

  • 1 17