November 2002 Monthly Operating Report for R.E. Ginna
ML023520504
Person / Time
Site: Ginna Constellation icon.png
Issue date: 12/09/2002
From: Widay J
Rochester Gas & Electric Corp
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML023520504 (3)


Text

Rff An Energy East Company ROCHESTER GAS AND ELECTRIC CORPORATION

  • 89 EASTAVENUE, ROCHESTER, N Y 14649-0001
  • 585 546-2700 www rge corn December 9, 2002 US Nuclear Regulatory Commission Document Control Desk Attn: Robert Clark Project Directorate I-1 Washington, DC 20555

Subject:

Monthly Report for November, 2002 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Clark:

Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of November, 2002.

Very truly yours, 0 t h A. Widay) ant Manager xc: U.S. Nuclear Regulatory Commission Mr. Robert Clark (Mail Stop O-8E9)

Project Directorate I-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments

OPERATING DATA REPORT 50-244 December 9, 2002 COMPLETED BY:

I John V. Walden TELEPHONE (585) 771-3588 OP ERATING STATUS

1. Unit Name: R.E. GINNA NUCLEAR POWER PLANT Notes:
2. Reporting Period: November, 2002
3. Design Electric Rating (Net MWe): 470
4. Maximum Dependable Capacity (Net MWe): 480 This Month Yr.-to-Date Cumulative**
5. Number of hours Reactor Was Critical 720.0 7250.7 238272.9
6. Hours Generator On-line 720.0 7209.0 235115.1
7. Unit Reserve Shutdown Hours 0.0 0.0 8.5
8. Net Electrical Energy Generated (MWH) 357224.0 3474037.2 106959598.0
  • CUMULATIVE TOTAL COMMENCING NOVEMBER 8, 1969

DOCKET NO: 50-244 UNIT NAME: R.E. GINNA NUCLEAR POWER PLANT DATE: December 9. 2002 COMPLETED BY: John V. Walden TELEPHONE: (585) 771-3588 UNIT SHUTDOWN REPORTING PERIOD: November, 2002 (Month/Year)

NO. DATE TYPE DURATION REASON(1 ) METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS) SHUTTING

&:SCHEDULED DOWN(2) COMMENTS

  • 1

SUMMARY

The unit operated at full power for the entire month of November. Average power for the month of November was 99.7%.

17 (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/LUcense Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)