Rff An Energy East Company ROCHESTER GAS AND ELECTRIC CORPORATION
- 89 EASTAVENUE, ROCHESTER, N Y 14649-0001
- 585 546-2700 www rge corn December 9, 2002 US Nuclear Regulatory Commission Document Control Desk Attn:
Robert Clark Project Directorate I-1 Washington, DC 20555
Subject:
Monthly Report for November, 2002 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Mr. Clark:
Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of November, 2002.
Very truly yours, 0
t h A. Widay) ant Manager xc:
U.S. Nuclear Regulatory Commission Mr. Robert Clark (Mail Stop O-8E9)
Project Directorate I-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments
OPERATING DATA REPORT C
ERATING STATUS Unit Name:
R.E. GINNA NUCLEAR POWER PLANT Reporting Period:
November, 2002 Design Electric Rating (Net MWe):
470 Maximum Dependable Capacity (Net MWe):
480 50-244 December 9, 2002 OMPLETED BY: I John V. Walden TELEPHONE (585) 771-3588 Notes:
Number of hours Reactor Was Critical Hours Generator On-line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)
This Month 720.0 720.0 0.0 357224.0 Yr.-to-Date 7250.7 7209.0 0.0 3474037.2 Cumulative**
238272.9 235115.1 8.5 106959598.0
- CUMULATIVE TOTAL COMMENCING NOVEMBER 8, 1969 OP
- 1.
- 2.
- 3.
4.
- 5.
- 6.
- 7.
8.
DOCKET NO: 50-244 UNIT NAME: R.E. GINNA NUCLEAR POWER PLANT DATE: December 9. 2002 COMPLETED BY: John V. Walden TELEPHONE: (585) 771-3588 UNIT SHUTDOWN REPORTING PERIOD:
November, 2002 (Month/Year)
SUMMARY
The unit operated at full power for the entire month of November. Average power for the month of November was 99.7%.
(1) Reason A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/LUcense Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)
(2) Method 1 - Manual 2 -Manual Trip/Scram 3 -Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)
NO.
DATE TYPE DURATION REASON(1)
METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS)
SHUTTING
&: SCHEDULED DOWN(2)
COMMENTS
- 1 17