Thomas A. Marlow R.E. Ginna Nuclear Power Plant, LLC Plant General Manager 1503 Lake Road Ontario, NewYork 14519-9364 585.771.3000 Constellation Energy Generation Group February 9, 2005 US Nuclear Regulatory Commission Document Control Desk Attn:
Donna Skay Project Directorate 1-1 Washington, DC 20555
Subject:
Monthly Report for January 2005 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Mr. Clark:
Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of January 2005.
Very truly yours, Thomas A. Marlow Plant Manager xc:
U.S. Nuclear Regulatory Commission Ms. Donna Skay (Mail Stop 0-8-C2)
Project Directorate l-1 One White Flint North 11555 Rockville Pike Rockville, MD 20852 Regional Administrator U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments
OPERATING DATA REPORT DOCKET NO.
50-244 UNIT NAME Ginna 1 DATE February 04. 2005 COMPLETED BY John V. Walden.
TELEPHONE 585-771-3588 REPORTING PERIOD:
January 2005 1.
2.
Design Electrical Rating Maximum Dependable Capacity (MWe-Net) 470.00 480.00 3.
4.
5.
6.
Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)
This Month 744.00 744.00 0.00 370,270.00 Yr-to-Date 744.00 744.00 0.00 370,270.00 Cumulative 256,480.80 253,263.23 8.50 115,876,259.8 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.
Date S: Scheduled (Hours)
Reason I Down 2 Comments
SUMMARY
- The unit operated at full power for the entire month of January. Average power for the moth was 99.8%.
1 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
1 Manual 2
Manual Trip/Scram 3
Automatic Trip/Scram 4
Continuation 5
Other (Explain)
Page 1 of I