ML050530223

From kanterella
Jump to navigation Jump to search
January 2005 Monthly Report for R.E. Ginna Nuclear Power Plant
ML050530223
Person / Time
Site: Ginna Constellation icon.png
Issue date: 02/09/2005
From: Marlow T
Constellation Energy Group
To: Skay D
Document Control Desk, NRC/NRR/DLPM/LPD1
References
Download: ML050530223 (2)


Text

Thomas A. Marlow R.E. Ginna Nuclear Power Plant, LLC Plant General Manager 1503 Lake Road Ontario, NewYork 14519-9364 585.771.3000 Constellation Energy Generation Group February 9, 2005 US Nuclear Regulatory Commission Document Control Desk Attn: Donna Skay Project Directorate 1-1 Washington, DC 20555

Subject:

Monthly Report for January 2005 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Clark:

Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of January 2005.

Very truly yours, Thomas A. Marlow Plant Manager xc: U.S. Nuclear Regulatory Commission Ms. Donna Skay (Mail Stop 0-8-C2)

Project Directorate l-1 One White Flint North 11555 Rockville Pike Rockville, MD 20852 Regional Administrator U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments

OPERATING DATA REPORT DOCKET NO. 50-244 UNIT NAME Ginna 1 DATE February 04. 2005 COMPLETED BY John V. Walden .

TELEPHONE 585-771-3588 .

REPORTING PERIOD: January 2005

1. Design Electrical Rating 470.00
2. Maximum Dependable Capacity (MWe-Net) 480.00 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 744.00 256,480.80
4. Number of Hours Generator On-line 744.00 744.00 253,263.23
5. Reserve Shutdown Hours 0.00 0.00 8.50
6. Net Electrical Energy Generated (MWHrs) 370,270.00 370,270.00 115,876,259.8 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason I Down 2 Comments

SUMMARY

The unit operated at full power for the entire month of January. Average power for the moth was 99.8%.

1 2 Reason: Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

Page 1 of I