ML20055F755

From kanterella
Revision as of 17:23, 13 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Corrected Monthly Operating Rept for Jan 1990 for Jm Farley Nuclear Plant Unit 2
ML20055F755
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 01/31/1990
From: Dennis Morey
ALABAMA POWER CO.
To:
Shared Package
ML20055F742 List:
References
NUDOCS 9007190156
Download: ML20055F755 (1)


Text

. _ - . . _

l

' OPERATING DATA REPORT DOCKET NO. 50-364 DATE 2/2/90 COMPLETED BY D. N. Morey _

TELEPHONE (205)B99-5156 OPERATING STATUS Notes

1. Unit Name: Joseph M. Farley - Unit 2 1) Cumulative data since
2. Reporting Period: January 1990 7-30-81, date of
3. Licensed Thermal Power (MVt): 2,652 commercial operation.
4. Nameplate Rating (Gross MVe): 860 *
5. Design Electrical Ratn.g (Net MWe): 829 6.-Maximum Dependable Capacity (Gross MVe): 868.6
7. Maximum Dependable Capacity (Net MVe): 828.2 .
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since LCEReport, Give Reasons: N/A
9. Power-Level To Which Restricted, If Any (Net MVe): N/A
10. Reasons For Restrictions, If Any: N/A '

This Month Yr-to-Date cumulative

11. Hours In Reporting Period 744 744 74,593 12.-Number of Hours Reactor Was Critical 744.0 744.0 64,627.1 l

'13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0

l. 14.-Hours Generator On-Line 744.0 744,0 63,816.0 1

15.-Unit Reserve Shutdown Hours 0.0 0.0 0.0 i 16. Gross Thermal Energy Generated (MVH) 1,970,306 1,970,306 162 225,573 l 17. Gross Electrical Energy Generated (MWH) 654,930 654,930 , 1,472

18. Net Electrical Energy Generated (MWH) 624,764 624,764 50,568,154
19. Unit Service Factor 100.0 100.0 85.6
20. Unit Availability Factor .

100.0 100.0 85.6

21. Unit Capacity Factor-(Using MDC Net) 101.4 101.4 82.9
22. Unit-Capacity Factor (Using DER Net) 101.3 101.3 81.8
23. Unit Forced Outage Rate 0.0 0.0 4.5 l 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

[ N/A

1 I" 25. If-Shut Down At End Of Report Period, Estimated Date of Startup: N/A
26. Units In Test Status (Prior to Commercial Operation):

. Forecast Achieved l

INITIAL CRITICALITY 05/06/81 05/08/81' INITIAL ELECTRICITY 05/24/81 05/25/81 l

COMMERCIAL OPERATION 08/01/81 07/30/81 l

+

Form 2/30 9007190156 900711 PDR ADOCK 05000364 R PDC