ML20207M642

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Feb 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With
ML20207M642
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 02/28/1999
From: Marlar W, Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9903190139
Download: ML20207M642 (6)


Text

,

, Dave Morey SIuthern Nuclear Vu President Operatirg Company farley Project R0. Box 1295 Birmingham, Alabama 35201 Tel 205.992.5131 March 11, 1999 SOUTHERN h  !

Docket Nos.: .50-348 COMPANY 50-364 #" N "#" " I" #" #

U. S. Nuclear Regulatory Commission I ATTN: Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant i Monthly Operating Report j l

Ladies and Gentlemen:

l Enclosed are the February 1999 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2, as required by Section 6.9.1.10 of the Technical Specifications.

If you have any questions, please advise.

Respectfully submitted, i

fl N/W/ .

Dave Morey RWC:mor

Enclosures:

l 1. February Monthly Operating Report for Plant Farley Unit 1 ,

l

2. February Monthly Operating Report for Plant Farley Unit 2

/

i 100015

~

9903190139 990228 PDR ADOCK 05000348-R PDR__

[7 .

Page 2 '

U. S. Nuclear Regulatory Commission cc: Southern Nuclear Operating Company Mr. L. M. Stinson, General Manager U. S. Nuclear Regulatory Commission, Washington, D. C.

Mr. J.1. Zimmerman, Licensing Project Manager - Farley U. S. Nuclear Regulatory Commission, Region 11 Mr. L. A. Reyes, Regional Administrator Mr. T. P. Johnson, Senior Resident Inspector - Farley 1

l 1

I l

l 1

l l

j i

,~

r

r- . .

n 1

OPERATING DATA REPORT

} DOCKET NO.: 50-348 l UNIT NAME: J. M. Farley - Unit 1 DATE: March 4,1999 COMPLETED BY: W. L. Marlar TELEPIIONE: (334) 814-4554 _ _

i OPERATING STATUS

1. Reporting Period: FEBRU'ARY 1999 l 2. Design Electrical Rating (Net MWe): 854 I 3. Maximum Dependable Capacity (Net MWe): 847 1

This31onth Yeatto Date Cumulative

4. Number Of Hours Reactor Was Critical: 672.0 1,416.0 150,319.2_ ,

l

5. Hours Generator On-line: 672.0 1,416.0 148,175.7 l

l 6. Unit Reserve Shutdown Hours: 0.0 0.0 0.0 l

7. Net Electrical Energy Geaerated (MWH): 572,003.0 1,187,162.0 116,721,479.0 l i

CHALLENGES TO PRESSURIZER PORY OR PRESSURIZER SAFETY VALVES Date i 1ag No. I byent Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.

El-1

UNIT SHUTDOWNS DOCKET NO.: 50-348 UNIT NAME: J. M. Farley - Unit 1 DATE: March 4,1999 COMPLETED BY:_ W. L. Marlar h2 PORTING PERIOD: FEBRUARY _1999 TELEPIIONE: (

___ 334_) 814-4_5,5_4_

! Type  ! Method of F: Forced Duration ! Reason Shutting Down Cause/ Corrective Actions No.  ; Date s: scheduled , (Hours) (1) (2)

I 1

Comments i

' There were no unit shutdowns 1

, during the month.

l 1

! I l

t  !

I' I

i l

I l  !

l  !

I

,I i ,

(1) KIA5UN.

(2) MLlllVD.

A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip / Scram C - Refueling 3 - Automatic Trip / Scram D-Regulatory Restriction 4 - Continuation E - operator Training / License Examination 5 - other (Explain)

F - AdminUtrative G - operational Error (Explain)

II- other(Explain)

CAUSE/ CORRECTIVE ACTION / COMMENTS NARRATIVE REPORT There were no significant power reductions this period. ,

El-2 1

1

OPERATING DATA REPORT DOCKET NO.: 50-364 UNIT NAME: _

J. M. Farley - Unit 2 DATE: March 4,1999 COMPLETED BY: W. L. Marlar _

TELEPHONE: (334) 814-4554 OPERATING STATUS

1. Reporting Period: FEBRUARY 1999
2. Design Electrical Rating (Net MWe): 855
3. Maximum Dependable Capacity (Net MWe): 852 This31onth Year.to Date Cumulative
4. Number Of Hours Reactor Was Critical: 672.0 _

1,416.0 133,884.4

5. Ilours Generator On-line: 672.0 1,416.0 132,061.4
6. Unit Reserve Shutdown Hours: 0.0 0.0 0.0
7. Net Electrical Energy Generated (MWH): 579,130.0 1,210,431.0 _ 105,309,717.0 I

CilALLENGES TO PRESSURIZER PORY OR PRESSURIZER SAFETY VALVES l Date i Iag No. i Event Description l There were no challenges to Pressurizer PORV or i Pressurizer Safety Valves.

l t

l f i

E2-1 )

  • .d UNIT SHUTDOWNS ,

DOCKET NO.: 50-364 UNIT NAME: J. M. Farley - Unit 2 DATE: March 4,1999 COMPLETED BY: W. L. Marlar REPOlcTING PERIOD: FEBRUARY _1999 TELEPilONE: (334) 814-4554 l

l l Type Method of F: Forced Duration Reason l Shutting Down Cause/ Corrective Actions No. Date S: Scheduled (Ilours) (1) (2) Comments l l l There were no unit shutdowns ,

during the month. I

, l I

I l

(1) Kt25uN, (2) Mt.a uvo.

A - Equipment failure,(Explain) 1 Manual 11 Maintenance or Test 2 - Manual Trip / scram C - Refueling 3 - Automatic Tri,n/ Scram D Regulatory Restriction 4 - Continuation E - Operator Training / License Examination 5 - Other (Explain)

F- Administrative 0 Operational Error (Explain) 11 Other(Explain)

CAUSE/ CORRECTIVE ACTION / COMMENTS NARRATIVE REPORT There were no significant power reductions this period.

E 1-2