Dave Morey SIuthern Nuclear Vu President Operatirg Company farley Project R0. Box 1295 Birmingham, Alabama 35201 Tel 205.992.5131 March 11, 1999 SOUTHERN h COMPANY Docket Nos.:
.50-348
- " N "#" " I" #" #
50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant Monthly Operating Report j
Ladies and Gentlemen:
l Enclosed are the February 1999 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2, as required by Section 6.9.1.10 of the Technical Specifications.
If you have any questions, please advise.
Respectfully submitted, i
fl N/W/
Dave Morey RWC:mor
Enclosures:
l
- 1. February Monthly Operating Report for Plant Farley Unit 1
- 2. February Monthly Operating Report for Plant Farley Unit 2
/
i 100015
~
9903190139 990228 PDR ADOCK 05000348-R PDR__
[7 Page 2 '
U. S. Nuclear Regulatory Commission cc:
Southern Nuclear Operating Company Mr. L. M. Stinson, General Manager U. S. Nuclear Regulatory Commission, Washington, D. C.
Mr. J.1. Zimmerman, Licensing Project Manager - Farley U. S. Nuclear Regulatory Commission, Region 11 Mr. L. A. Reyes, Regional Administrator Mr. T. P. Johnson, Senior Resident Inspector - Farley 1
l l
l j
i
!,~
r
r-n OPERATING DATA REPORT
}
DOCKET NO.:
50-348 l
UNIT NAME:
J. M. Farley - Unit 1 DATE:
March 4,1999 COMPLETED BY:
W. L. Marlar TELEPIIONE:
(334) 814-4554 _ _
i OPERATING STATUS 1.
Reporting Period:
FEBRU'ARY 1999 l
2.
Design Electrical Rating (Net MWe):
854 I
3.
Maximum Dependable Capacity (Net MWe):
847 This31onth Yeatto Date Cumulative 4.
Number Of Hours Reactor Was Critical:
672.0 1,416.0 150,319.2_
5.
Hours Generator On-line:
672.0 1,416.0 148,175.7 l
l 6.
Unit Reserve Shutdown Hours:
0.0 0.0 0.0 7.
Net Electrical Energy Geaerated (MWH):
572,003.0 1,187,162.0 116,721,479.0 i
CHALLENGES TO PRESSURIZER PORY OR PRESSURIZER SAFETY VALVES Date i 1ag No.
I byent Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.
El-1
UNIT SHUTDOWNS DOCKET NO.:
50-348 UNIT NAME:
J. M. Farley - Unit 1 DATE:
COMPLETED BY:_
March 4,1999 W. L. Marlar h2 PORTING PERIOD: FEBRUARY _1999 TELEPIIONE:
___ 334_) 814-4_5,5_4_
(
Type Method of F: Forced Duration ! Reason Shutting Down Cause/ Corrective Actions No.
- Date s
- scheduled, (Hours)
(1)
(2)
Comments I
1 i
' There were no unit shutdowns during the month.
1 l
1 I
I' l
t I
i l
I l
l I
,I i
(1) KIA5UN.
(2) MLlllVD.
A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip / Scram C - Refueling 3 - Automatic Trip / Scram D-Regulatory Restriction 4 - Continuation E - operator Training / License Examination 5 - other (Explain)
F - AdminUtrative G - operational Error (Explain)
II-other(Explain)
CAUSE/ CORRECTIVE ACTION / COMMENTS NARRATIVE REPORT There were no significant power reductions this period.
El-2 1
1
OPERATING DATA REPORT DOCKET NO.:
50-364 UNIT NAME:
J. M. Farley - Unit 2 DATE:
March 4,1999 COMPLETED BY:
W. L. Marlar TELEPHONE:
(334) 814-4554 OPERATING STATUS 1.
Reporting Period:
FEBRUARY 1999 2.
Design Electrical Rating (Net MWe):
855 3.
Maximum Dependable Capacity (Net MWe):
852 This31onth Year.to Date Cumulative 4.
Number Of Hours Reactor Was Critical:
672.0 1,416.0 133,884.4 5.
Ilours Generator On-line:
672.0 1,416.0 132,061.4 6.
Unit Reserve Shutdown Hours:
0.0 0.0 0.0 7.
Net Electrical Energy Generated (MWH):
579,130.0 1,210,431.0
_ 105,309,717.0 CilALLENGES TO PRESSURIZER PORY OR PRESSURIZER SAFETY VALVES l
Date i Iag No.
i Event Description There were no challenges to Pressurizer PORV or i
Pressurizer Safety Valves.
l t
l f
i E2-1
)
.d UNIT SHUTDOWNS DOCKET NO.:
50-364 UNIT NAME:
J. M. Farley - Unit 2 DATE:
March 4,1999 COMPLETED BY:
W. L. Marlar REPOlcTING PERIOD: FEBRUARY _1999 TELEPilONE:
(334) 814-4554 l
l Type Method of F: Forced Duration Reason l Shutting Down Cause/ Corrective Actions No.
Date S: Scheduled (Ilours)
(1) l (2) l Comments l
There were no unit shutdowns l
during the month.
I I
l (1) Kt25uN, (2) Mt.a uvo.
A - Equipment failure,(Explain) 1 Manual 11 Maintenance or Test 2 - Manual Trip / scram C - Refueling 3 - Automatic Tri,n/ Scram D Regulatory Restriction 4 - Continuation E - Operator Training / License Examination 5 - Other (Explain)
F-Administrative 0 Operational Error (Explain) 11 Other(Explain)
CAUSE/ CORRECTIVE ACTION / COMMENTS NARRATIVE REPORT There were no significant power reductions this period.
E 1-2