Text

,

Dave Morey SIuthern Nuclear Vu President Operatirg Company farley Project R0. Box 1295 Birmingham, Alabama 35201 Tel 205.992.5131 March 11, 1999 SOUTHERN h COMPANY Docket Nos.:

.50-348

  1. " N "#" " I" #" #

50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant Monthly Operating Report j

Ladies and Gentlemen:

l Enclosed are the February 1999 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2, as required by Section 6.9.1.10 of the Technical Specifications.

If you have any questions, please advise.

Respectfully submitted, i

fl N/W/

Dave Morey RWC:mor

Enclosures:

l

1. February Monthly Operating Report for Plant Farley Unit 1
2. February Monthly Operating Report for Plant Farley Unit 2

/

i 100015

~

9903190139 990228 PDR ADOCK 05000348-R PDR__

[7 Page 2 '

U. S. Nuclear Regulatory Commission cc:

Southern Nuclear Operating Company Mr. L. M. Stinson, General Manager U. S. Nuclear Regulatory Commission, Washington, D. C.

Mr. J.1. Zimmerman, Licensing Project Manager - Farley U. S. Nuclear Regulatory Commission, Region 11 Mr. L. A. Reyes, Regional Administrator Mr. T. P. Johnson, Senior Resident Inspector - Farley 1

l l

l j

i

!,~

r

r-n OPERATING DATA REPORT

}

DOCKET NO.:

50-348 l

UNIT NAME:

J. M. Farley - Unit 1 DATE:

March 4,1999 COMPLETED BY:

W. L. Marlar TELEPIIONE:

(334) 814-4554 _ _

i OPERATING STATUS 1.

Reporting Period:

FEBRU'ARY 1999 l

2.

Design Electrical Rating (Net MWe):

854 I

3.

Maximum Dependable Capacity (Net MWe):

847 This31onth Yeatto Date Cumulative 4.

Number Of Hours Reactor Was Critical:

672.0 1,416.0 150,319.2_

5.

Hours Generator On-line:

672.0 1,416.0 148,175.7 l

l 6.

Unit Reserve Shutdown Hours:

0.0 0.0 0.0 7.

Net Electrical Energy Geaerated (MWH):

572,003.0 1,187,162.0 116,721,479.0 i

CHALLENGES TO PRESSURIZER PORY OR PRESSURIZER SAFETY VALVES Date i 1ag No.

I byent Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.

El-1

UNIT SHUTDOWNS DOCKET NO.:

50-348 UNIT NAME:

J. M. Farley - Unit 1 DATE:

COMPLETED BY:_

March 4,1999 W. L. Marlar h2 PORTING PERIOD: FEBRUARY _1999 TELEPIIONE:

___ 334_) 814-4_5,5_4_

(

Type Method of F: Forced Duration ! Reason Shutting Down Cause/ Corrective Actions No.

Date s
scheduled, (Hours)

(1)

(2)

Comments I

1 i

' There were no unit shutdowns during the month.

1 l

1 I

I' l

t I

i l

I l

l I

,I i

(1) KIA5UN.

(2) MLlllVD.

A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip / Scram C - Refueling 3 - Automatic Trip / Scram D-Regulatory Restriction 4 - Continuation E - operator Training / License Examination 5 - other (Explain)

F - AdminUtrative G - operational Error (Explain)

II-other(Explain)

CAUSE/ CORRECTIVE ACTION / COMMENTS NARRATIVE REPORT There were no significant power reductions this period.

El-2 1

1

OPERATING DATA REPORT DOCKET NO.:

50-364 UNIT NAME:

J. M. Farley - Unit 2 DATE:

March 4,1999 COMPLETED BY:

W. L. Marlar TELEPHONE:

(334) 814-4554 OPERATING STATUS 1.

Reporting Period:

FEBRUARY 1999 2.

Design Electrical Rating (Net MWe):

855 3.

Maximum Dependable Capacity (Net MWe):

852 This31onth Year.to Date Cumulative 4.

Number Of Hours Reactor Was Critical:

672.0 1,416.0 133,884.4 5.

Ilours Generator On-line:

672.0 1,416.0 132,061.4 6.

Unit Reserve Shutdown Hours:

0.0 0.0 0.0 7.

Net Electrical Energy Generated (MWH):

579,130.0 1,210,431.0

_ 105,309,717.0 CilALLENGES TO PRESSURIZER PORY OR PRESSURIZER SAFETY VALVES l

Date i Iag No.

i Event Description There were no challenges to Pressurizer PORV or i

Pressurizer Safety Valves.

l t

l f

i E2-1

)

.d UNIT SHUTDOWNS DOCKET NO.:

50-364 UNIT NAME:

J. M. Farley - Unit 2 DATE:

March 4,1999 COMPLETED BY:

W. L. Marlar REPOlcTING PERIOD: FEBRUARY _1999 TELEPilONE:

(334) 814-4554 l

l Type Method of F: Forced Duration Reason l Shutting Down Cause/ Corrective Actions No.

Date S: Scheduled (Ilours)

(1) l (2) l Comments l

There were no unit shutdowns l

during the month.

I I

l (1) Kt25uN, (2) Mt.a uvo.

A - Equipment failure,(Explain) 1 Manual 11 Maintenance or Test 2 - Manual Trip / scram C - Refueling 3 - Automatic Tri,n/ Scram D Regulatory Restriction 4 - Continuation E - Operator Training / License Examination 5 - Other (Explain)

F-Administrative 0 Operational Error (Explain) 11 Other(Explain)

CAUSE/ CORRECTIVE ACTION / COMMENTS NARRATIVE REPORT There were no significant power reductions this period.

E 1-2