Monthly Operating Repts for Nov 1996 for Jm Farley Nuclear Plant Units 1 & 2
ML20132C063
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 11/30/1996
From: Mcanulty M, Dennis Morey
SOUTHERN COMPANY SERVICES, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9612180097
Download: ML20132C063 (9)


Text

. .. t Dave Morzy S uther2Nucl:ar i

Vice President Operating Company Farley Project P.O. Box 1295 Birmingham. Alabama 35201 Tel 205.992.5131 I

l December 10, 1996 SOUTHERN COMPANY i Energy to Serve YourWorld' l

Docket Nos. 50-348 50-364 U. S. Nuclect Regulatory Commission ATTN: Document Control Desk Washington, D C 20555 Joseph M. Farley Nuclear Plant Monthly Operating Report i

Ladies and Gentlemen: 'l l

Attached are the November 1996 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2, as required by Section 6.9.1.10 of the Technical Specifications.

If you have any questions, please advise.

Respectfully submitted, h W'W Dave Morey RWC:(mor)

Attachments cc: Mr. S. D. Ebneter, Region II Administrator Mr. J. I. Zimmerman, NRR Project Manager Mr. T. M. Ross, FNP Sr. Resident inspector l

l Ie W 9612180097 961130 PDR ADOCK 05000348 R PDR 170025

i, L

1 d

k Joseph M. Farley Nuclear Plant

Unit 1 j Narrative Summary of Operations i November 1996 i

4 4

There were no unit shutdowns or major power reductions during the month.

There was no major safety related maintenance perfonned during the month.

i f

5 4

3 4

i 4

E 4

s

'l J

4 4

l i.

I i

4

OPERATING DATA REPORT DOCKET NO. 50-348 DATE December 9,1996 COMPLETED BY M. W. McAnuity TELEPilONE (334) 899-5156, ext.3640 OPERATINGETATUS

1. Unit Name: Joseph M. Farley - Unit 1 Notes
2. Reporting Period: November 1996 1) Cumulative data since 12-01-77,
3. Licensed Thermal Power (MWt): 2,652 date of commercial operation.
4. Nameplate Rating (Gross MWe): 860
5. Design Electrical Rating (Net MWe): 829
6. Maximum Dependable Capacity (Gross MWe): 855.7
7. Maximum Dependable Capacity (Net MWe): 812 .

l

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) 8mee Last Report, Give Reasons: N/A J
9. Power Level To Which Restricted, If Any (Net MWe): N/A )
10. Reasons For Restrictions,If Any: N/A l 1

l This Month Yr. to Date Cumulative

11. Hours in Reporting Period 720.0 8,040.0 166,560.0
12. Number Of Hours . Reactor Was Critical 720.0 8,011.3 134,700.7
13. Reactor Reserve Shutdown Hours 0.0 0.0 3,650.0
14. Hours Generator On-line 720.0 7,996.0 132,671.7
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1,908,591.4 20,991,545.5 341,745,918.4 l
17. Gross Electrical Energy Generated (MWH) 627,580.0 6,870,335.0 110,362,489.0
18. Net Electrical Energy Generated (MWH) 596,556.0 6,525,209.0 104,264,861.0
19. Unit Service Factor 100.0 99.5 79.7
20. Unit Availability Factor 100.0 99.5 79.7
21. Unit Capacity Factor (Using MDC Net) 102.0 99.9 77.1
22. Unit Capacity Factor (Using DER Net) 99.9 97.9 75.5
23. Unit Forced Outage Rate 0.0 0.0 5.6
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueling Outage scheduled for March 15,1997 with a duration of 49 days.

25. If Shut Down at End Of Report Period, Estimated Date of Startup: N/A
26. Units In Test Status (Prior To Commercial 7peration)- Forecast Achieved Initial Criticality 08/06/77 08/09/77 Initial Electricity 08/20/77 08/l8/77 Commercial Operation 12/01/77 12/01/77

, DOCKET NO. 50-348 UNIT 1 i DATE December 9,1996 4

COMPLETED BY M. W. McAnulty TELEPHONE (334) 899-5156 ext 3640 4

MONTH November l

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) i j 1 824 17 828 2 826 18 827 3 824 19 825 4 830 20 827 5 825 21 821 6 822 22 832 7 818 23 832 8 827 24 830 9 833 25 827 10 832 26 832 11 834 27 833 12 833 28 833 13 833 29 831 14 831 30 826 15 831 31 _

NA 16 831 INSTRUCTIONS l

On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.

- ~ . - - - = . . . - - - - - . - - - - - - - -. - - ----

. . . - . . .-. . ~ . - - - . . = . . - -

l *

  • l l

UNIT SHUTDOWNS AND POWER REDUCTIONS '

i .

l DOCKET NO. 50-348 UNIT NAME J. M. Farley - Unit 1 l

i DATE December 9,1996 COMPLETED BY M. W. McAnulty l REPORT MONTH November TELEPHONE (334)899-5156, ext.3640 l

R M E E S T A T Y l Y S 11 SC l P O O TO CAUSE AND CORRECTIVE E DURATION N D ED COMPONENT ACIlON TO I NO. DATE (1) (IlOURS) (2) (3) LER # ME CODE (5) PREVENT RECURRENCE i

j There were nO Shutdowns Or power reductions during the month.

I l

l 1

I I 4

l l

l l

i l

l' L_._

1: 2: 3: EVENTS REPORTED F; Forced Reason Method (NVOLVE A S: Scheduled A - Equipment Failure (Explain) 1 Manual GREATER TilAN 20%

B Maintenance or Test 2 - Manual Scram REDUCilON IN

C Refueling - 3 AutomaticScram AVERAGE DAILY l D Regulatory Restriction 4 Other(Explain) POWER LEVEL FOR l E Operator Training & License Examination Tile PRECEDING 24
i. F- Administrative llOURS.
G -Operational Error (Explain) l' II-Other (Explain) l r
Joseph M. Farley Nuclear Plant
Unit 2 Narrative Summary of Operations November 1996 i

i 4

The eleventh refueling outage continued through the month of November.

The following major safety related maintenance was performed during the month:

i l 8

1. The 2A charging pump was disassembled due to an overheated outboard seal. j j- The repairs included replacement of the pump rotating assembly. '

). The following maintenance was associated with outage activities:

I

1. The reactor was refueled.
2. The 10 year inspection of the 2C reactor coolant pump motor was completed.
3. Steam Generator test and inspection activities continued.

I a

E

, OPERATING DATA REPORT DOCKET NO. 50-364 DATE December 9,1996 COMPLETED BY M. W. McAnulty TELEPHONE (334) 899-5156, ext.3640 OPERATING _ STATUS

1. Unit Name: Joseph M. Farley - Unit 2 Notes
2. Reporting Period: November 1996 1) Cumulative data since 07-30-81,
3. Licensed Thermal Power (MWt): 2,652 date of commercial operation.
4. Nameplate Rating (Gross MWe): 860
5. Design Electrical Rating (Net MWe): 829  ;
6. Maximum Dependable Capacity (Gross MWe): 863.6
7. Maximum Dependable Capacity (Net MWe): 822 ( )
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Smce Last Report, Give Reasons: N/A i
9. Power Level To Which Restricted, If Any (Net MWe): N/A
10. Reasons For Restrictions,If Any: N/A This Month Yr. to Date Cumulative
11. Hours in Reporting Period 720.0 8,040.0 134,473.0 l
12. Number Of Hours Reactor Was Critical 0.0 6,840.9 115,744.3 l
13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0 l
14. Hours Generator On-line 0.0 6,839.0 114,049.2 l
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 l
16. Gross Thermal Energy Generated (MWH) 0.0 17,725,193.8 290,698,984.2
17. Gross Electrical Energy Generated (MWH) 0.0 5,806,131.0 95,268,610.0
18. Net Electrical Energy Generated (MWH) (4,474.0) _ 5,516,143.0 90,329,794.0 l
19. Unit Service Factor 0.0 85.1 84.8
20. Unit Availability Factor 0.0 85.1 84.8
21. Unit Capacity Factor (Using MDC Net) _

N/A 83.5 81.9

22. Unit Capacity Factor (Using DER Net) N/A 82.8 81.0
23. Unit Forced Outage Rate 0.0 0.0 3.8
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
25. If Shut Down at End Of Report Period, Estimated Date of Startup: 12/12/96
26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved Initial Criticality 05/06/81 05/08/81 Initial Electricity 05/24/81 05/25/81 Commercial Operation 08/01/81 07/30/81

+ .u..w .. . - . . - -m - cr_- -ur .-- - a , -,e a a-,. n a- _u.--...a- u-..~..=.n~ -

, ,. - ..- , _ aa.

DOCKET NO. 50-364 I -

UNIT 2

.1 DATE December 9,1996 COMPLETED BY M. W. McAnulty TELEPHONE (334) 899-5156 ext 3640 MONTH November  !

l DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL l (MWe-Net) (MWe-Net) I 1 0 17 0 2 0 18 0 3 0 19 0 4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 0 l 8 0 24 0 9 0 25 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0 15 0 31 NA 16 0 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.

.i

_. .-. . . _ . . _ . .- .. _ - . . ~ . - -. . . ~ . . . - _ - - -

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-364 UNIT NAME J. M. Farley - Unit 2 i

DATE December 9,1996 COMPLETED BY M. W. McAnulty REPORTMONTH November TELEP110NE (334) 899-5156, ext.3640

! R M j E E S T A T Y j Y S 11 SC ,

i P O O TO CAUSE AND CORRECTIVE I E DURATION N D ED COMPONENT ACrlON TO s

NO. DATE (1) (llOURS) (2) (3) LER # ME CODE (5) PREVENT RECURRENCE

! 011 96iblY S 720~~ C 1 N/A N/A N/A The eleventh ref'ueling Outage continued i from 961012.

d k

i j l

A s

i l

4 1: 2: 3: EVENTS REPORTED F: Forced Reason Method INVOLVE A S: Scheduled A - Equipment Failure (Explain) 1 - Manual GREATER TIIAN 20*'.  !

D Maintenance or Test 2 - Manual Scram REDUCTION IN C Refueling 3 Automatic Scram AVERAGE DAILY D Regulatory Restriction 4 - Other (Explain) POWER LEVEL FOR E - Operator Training & License Examination TIIE PRECEDING 24 F Adtninistrative IIOURS.

O - Operational Error (Explain) 11 Other(Explain)