._m=_. _ _ . _. .. . . _ _ __ . . . . .

l Southtrn Nucitar Optrating Company  ;

4.

  • Post Offica Box 1295 -

Birmingham. Alabama 35201 f Tslephone (205) 868-5131 o.ve uo,ey Vice President Southern Nudear Operating Company Farley Project the southern electnc system i

October 11, 1996 Docket Nos. 50-348 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk l Washington, D C 20555 Joseph M. Farley Nuclear Plant Monthly Operating Report l l

Ladies and Gentlemen:

Attached are the September 1996 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2, as required by Section 6.9.1.10 of the Technical Specifications.

If you have any questions, please advise.

Respectfully submitted,

]

lAl kW l Dave Morey 1 RWC:(mor)

Attachments cc: Mr. S. D. Ebneter, Region 11 Administrator Mr. J.1. Zimmerman, NRR Project Manager Mr. T. M. Ross, FNP Sr. Resident inspector i

i 9610180228 960930 PDR ADOCK 05000348 R PDR 180028

Joseph M. Farley Nuclear Plant Unit 1 Narrative Summary of Operations September 1996 _

4 There were no unit shutdowns or major power reductions during the month.

There was no major safety related maintenance performed during the month.

1 j

l l

1

OPERATING DATA REPORT DOCKET NO. 50-348 DATE October 3,1996 COMPLETED BY M. W. McAnulty_

TELEPHONE (334) 899-5156, ext.3640 OPERATING STATUS

1. Unit Name: Joseph M. Farley - Unit 1 Notes
2. Reporting Period: September 1996 1) Cumulative data since 12-01-77,
3. Licensed Thermal Power (MWt)- 9,652 date of commercial operation.
4. Nameplate Rating (Gross MWe): 860
5. Design Elec* ical Rating (Net MWe): 829
6. Maximum Dependable Capacity (Gross MWe): 855.7
7. Maximum Dependable Capacity (Net MWe): 812 ,
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Smce Last Report, Give Reasons: N/A _
9. Power Level To Which Restricted, If Any (Net MWe): N/A
10. Reasons For Restrictions, If Any: _

N/A This Month Yr. to Date Cumulative

11. Hours in Reporting Period 720.0 _

6,575.0_ 165,095.0

12. Number Of Hours Reactor Was Critied 720.0 6,546.3_ 133,235.7
13. Reactor Reserve Shutdown Hours 0A 0.0 3,650.0
14. Hours Generator On-line 720.0 6,531.0 131,206.7
15. Unit Reserve Shutdown Hours 0.0 0.0 _

0.0

16. Gross Thermal Energy Generated (MWH) 1,909,440.0 17,107,214.1 337,861,587.0
17. Gross Electrical Energy Generated (MWH) _

620,951.0 5,595,495.0 _

109,087,649.0

18. Net Electrical Energy Generated (MWH) _.

589,865.0 5,313,467.0 103.053,119.0

19. Unit Service Factor 100.0 99.3 79.5
20. Unit Availability Factor _ 100.0 99.3 79.5
21. Unit Capacity Factor (Using MDC Net) 100.9 99.5 76.9
22. Unit Capacity Factor (Using DER Net) 98.8 97.5 75.3
23. Unit Forced Outage Rate 0.0 0.0 5.6
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueling Outage scheduled for March 15,1997 with a duration of 49 days.

25. If Shut Down at End Of Report Period, Estimated Date of Startup: N/A _
26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved Initial Criticality 08/06/77 _ _

08/09/77 _

Initial Electricity __

08/20/77 08/18/77 Commercial Operation _ _ _

12/01/77 _ 12/01/77

DOCKET No. 50-348

. UNIT 1

, , DATE October 3,1996 COMPLETED BY M. W. McAnuity_ i TELEPHONE (334) 899-5156 ext 3640 l MONTH September DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 817 17 __

811 2 817 18 823 ,

3 817 19 826 4 818 20 824 5 816 21 _

820 6 817 22 823 7 815 23 823 i 8 815 24 823 9 818 25 821 10 818 26 819 11 818 27 816 12 818 28 818 _

13 820 29 827 14 826 30 820 15 821 31 N/A _

16 816 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.

UNIT SHUTDOWNS AND POWER REDUCTIONS

. DOCKET NO. 50-348 UNIT NAME J. M. Farley - Unit i DATE October 3,1996 COMPLETED BY M. W. McAnulty REPORTMONTII September TELEPHONE (334) 899-5156, ext.3640 R M l E E S T A T Y Y S 11 SC P O. O TO CAUSE AND CORRECTIVE E DURATION N D ED COMPONENT ACTION TO NO. DATE (1) (IlOURS) (2) (3) LER # ME CODE (5) PREVENT RECURRENCE There were no Sh~u~tdOwnS Or power reductions during the month.

I L

1: 2: 3: EVENTS REPORTED

' F: Forced Reason Method INVOLVE A S: Scheduled A Equipment Failure (Explain) 1 - Manual GREATER TilAN 20%

D - Maintenance or Test 2. Manual Scram REDUCrlON IN C Refueling 3 - Automatic Scram AVERAGE DAILY D - Regulatory Restriction 4 Other(Explain) POWER LEVEL FCR E - Operator Training & License Examination Tile PRECEDING 24 F - Administrative llOURS.

G - Operational Error (Explain) li- Other (Explain)

, Joseph M. Farley Nuclear Plant

, , Unit 2 Narrative Summary of Operations September 1996 2

At 0234 on September 8,1996, with the unit operating in mode 1 at 100% reactor power, the unit was ramped down to 70% reactor power to perform condenser

tube inspections due to elevated sodium levels on the secondary side.

The tube inspections were completed with no tube leaks indicated and sodium 1.

levels had returned to within acceptable limits. The unit was retumed -

to 100% reactor power at 0514 on September 9,1996.

There was no major safety related maintenance performed during the month.

R 1

4 j

f 4

i 5

5 a

i a

4 i

4 4

OPERATING DATA REPORT DOCKET NO. 50-364 _

DATE October 3,1996 COMPLETED BY M. W. McAnuity_

TELEPilONE (334) 899-5156, ext.3640 OPERATING STATUS

1. Unit Name: Joseph M. Farley - Unit 2 Notes
2. Reporting Period: September 1996 1) Cumulative data since 07-30-81,
3. Licensed Thermal Power (MWt): 2,652 date of commercial operation.
4. Nameplate Rating (Gross MWe): 860
5. Design Electrical Rating (Net MWe)
829_
6. Maximum Dependable Capacity (Gross MWe): 863.6
7. Maximum Dependable Capacity (Net MWe): 822
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Smce Last Report, Give Reasons: N/A

~

9. Vower Level To Which Restricted, If Any (Net MWe): N/A
10. Reasons For Restrictions,If Any: N/A This Month Yr. to Date Cumulative i
11. Hours in Reporting Period _

720.0 6,575.0 133,008.0

12. Number OfIlours Reactor Was Critical 720.0 _

6,575.0 115,478.4

13. Reactor Reserve Shutdown flours _

0.0 0.0 138.0

14. Hours Generator On-line 720.0 6,575.0 113,785.2
15. Unit Reserve Shutdown Hours 0.0 0.0 _

0.0

16. Gross Thermal Energy Generated (MWil) 1,891,141.2 17,028,699.0 290,002,489.4_

r 17. Gross Electrical Energy Generated (MWH) 615,001.0 5,579,378.0 95,04i,857.0

18. Net Electrical Energy Generated (MWH) 585,455.0 5,309,326.0 90,122,977.0
19. Unit Service Factor 100.0 100.0 85.5_
20. Unit Availability Factor 100.0 100.0 85.5 4
21. Unit Capacity Factor (Using MDC Net) __

98.9 98.2 82.6

22. Unit Capacity Factor (Using DER Net) 98.1 97.4 81.7
23. Unit Forced Outage Rate ___ 0.0_ _ _ 0_.0_ _ __ 3.8_
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueling Outage scheduled for October 12,1996 with a duration of 48 days _

~

25. U Shut Down at EWOflieport Perio[ Estimated Date of Startup: N/A
26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved Initial Criticality 05/06/81 05/08/81 Initial Electricity 05/24/81 05/25/81 Commercial Operation 08/01/81 07/30/81

DOCKET NO. 50-364

, UNIT 2 DATE October 3,1996 COMPLETED BY M. W. McAnulty_

TELEPliONE (334) 899-5156 ext 3640 MONTII September DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 822 _

17 813 2 820 18 826 3 822 19 829 4 823 20 826 5 822 21 821 6 821 22 826 7 815 23 819 8 579 24 826 9 800 25 822 10 823 26 816 11 824 27 813 12 824 28 817 13 827 29 828 14 832 30 819 15 _

824 31 N/A 16 817

INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.

- - ~ . ~ _ . ._ . .- _ - .- .. -

[; UNIT SIIUTDOWNS AND POWER REDUCTIONS

, DOCKET NO. 50-364 UNIT NAME J. M. Farley - Unit 2 j DATE October 3,1996 COMPLETED BY M. W. McAnuity_

REPORT MONTH September TELEPIIONE (334) 899-5156, ext.3640 j R M l

' E E s T A T Y Y S 11 sC 1 P O O TO CAUSE AND CORRECTIVE E DURATION N D ED COMPONENT ACTION TO NO. DATE (1) (llOURS) (2) (3) LER # ME CODE (5) PREVENT RECURRENCE i

~

l 'I)T6~960908 ~S 0~ B 4 ~-N/A ~SG-~CiOND At 0214 on 960968, with the unit operating in mode 1 at 100% reactor power, the unit was ramped down to 70% reactor power to perform condenser tube inspections l i due to elevated sodium levels on the I secondary side.

{

4 The tube inspections were completed with i no tube leaks indicated and sodium levels j j had returned to within acceptable limits. l The unit was returned to 100% reactor power l at 0514 on 960909.

I l

L_ 2_ . l '

_.___...___.__..____J.-_.-.-. - - - _ _ - _ - ,._ = _ = ..; = = = = m 1: 2: 3. EVENTS REPORTED F: Forced Reason Method INVOLVE A S: scheduled A - Equipment Failure (Explain) 1 Manual GREATER TilAN 20%

B Maintenance or Test 2 - Manual scram REDUCTION IN C - Refuchng 3 - Automatic Scram AVERAGE DAILY D - Regulatory Restriction 4 - Other (Explain) POWER LEVEL FOR E - Operator Training & License Examination Tile PRECEDING 24 F - Administrative llOURs.

G - Operational Error (Explain) 11 - Other (Explain)