Monthly Operating Repts for Aug 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With
ML20197C899
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 08/31/1998
From: Curlington A, Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9809140283
Download: ML20197C899 (5)


Text

.

.- Das Morey S:uthern Nucl:ar

,. Vice President Op: rating Company

, Farley Project P.O. Box 1295 Birmingham, Alabama 35201 Tel 205.992.5131 September 11, 1998 SOUTHERN h*

COMPANY Energy ro Serve Your World*

Docket Nos. 50-348 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D C 20555 Joseph M. Farley Naclear Plant Monthly Operating Report Ladies and Gentlemen:

Enclosed are the August 1998 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2, as required by Section 6.9.1.10 of the Technical Specifications.

If you have any questions, please advise.

Respectfully submitted, Dave Morey RWC:(mor)

Enclosures E! - August Monthly Operat ng i Report for Plant Farley Unit 1 E2 - August Monthly Operating Report for Plant Farley Unit 2 cc: Mr. L. A. Reyes, Region II Administrator i Mr. J.1. Zimmerman, NRR Project Manager Mr. T. P. Johnson, FNP Sr. Resident inspector g 'g ,

i g

1

.o 1

' ~

9809140283 980831 PDR "[' l ADOCK 05000348  !

R pyg ,_n,

  • l OPERATING DATA REPORT DOCKET NO.: 50-348 ,_

UNIT NAME: _ J. M. Farley - Unit 1 DATE: September 3,1998 COMPLETED BY: A. II. Curlington TELEPilONE: (

. _334) 794-6431 ext. 3399 OPERATING STATUS

1. Reporting Period: August 1998
2. Design Electrical Rating (Net MWe): 829
3. Maximum Dependable Capacity (Net MWe): 822 l

I l

ThisNonth Year _to Date Cumulative

4. Number Oflit>urs Reactor Was Critical: 386.1 5,473.1 147,754.7 l
5. Hot:rs Generator On-line: 386.0 5,473.0 145,692.4 l
6. - Unit Reserve Shutdown Hours: 0.0
7. Net Electrical Energy Generated (MWH):

0.0 01 305,504.0 4,471,997.0 114,772,325.0_

l l

CliALLENGES TO PRESSURIZER PORV L ?. PRESSURIZER SAFETY VALVES Date  ! lag No. I Event Description i

There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.

El-1

. l t

UNIT SHUTDOWNS  !

DOCKET NO.: 50-348 )

UNIT NAME: J. M. Farley - Unit i DATE: September 3,1998

COMPLETED BY
A.5 Curlington REPORTING PERIOD: AUGUST _199.8 TELEPilONE: (334) 794-6431 ext. 3399 l l

1 3: Type Method of F: Forced Duration Reason Shutting Down Cause/ Corrective Actions No. Date S: Scheduled (Hours) (1) (2) Comments j 1 980817 F 358.0 A 1 At 0206, on 980817, the unit was shut down due to 1B steam  :

generator tube leakage.

Reference Voluntary LER 98-002-00  ;

(Unit 1) dated 980903.

u) RLa w N. u) MLuluu.

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 - Manual Trip / Scram C Refueling 3 - Automatic Trip / Scram D - Regulatory Restriction 4 - Continuat an E OperatorTraining/ License Examination 5 -other (Explain)

F - Administrative G - operational Error (Explain) 11 other(Explain)

CAUSE/ CORRECTIVE ACTION / COMMENTS

)

NARRATIVE REPORT On 980816, at 1900, a unit shut down was commenced due to IB steam gene'rEr tube leakage.

The unit was shut down on 980817, at 0206. Due to inspection and tube plugging in 1B steam generator, the unit remained shut down for the remainder of the month.

El-7

OPERATING DATA REPORT DOCKET NO.: __

50-364 UNIT NAME: J. M. Farley - Unit 2 DATE: Septernber 3,1998 _

COMPLETED BY: A.11. Curlington TELEPilONE: (334) 794-6431 ext. 3399 OPERATING STATUS

1. Reporting Period: August 1998
2. Design Electrical Rating (Net MWe):

829_

3. Maximum Dependable Capacity (Net MWe): 852 This Month Year.to Date Cumulative r
4. Number Of Hours Reactor Was Critical: 744.0 4,622.4 129,539.4
5. Hours Generator On-line: 744.0 4,585.5 127,716.4
6. Unit Reserve Shutdown Hours: 0.0 0.0 0.0
7. Net Electrical Energy Generated (MWH): 628,461.0 3,808,167.0 101,639,531.0 CHALLENGES TO PRESSURIZER PORY OR PRESSURIZER SAFETY VALVES Date i 1 ag No. I Event Desenption There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.

E2-1 l

l

UNIT SHUTDOWN.S

)

DOCKET NO.: 50-364 UNIT NAME: J. M. Farley - Unit 2 _

, , DATE: September 3,1998 l

} COMPLETED BY: A.11. Curlington i REPORTING PERIOD: AUGUST _1998 rELEPIIONE: (334) 794 6431 ext. 3399  :

1 Type Method of F: Forced Duration Reason Shutting Down Cause/ Corrective Actions '

. No Date s: scheduled (Hours) (1) (2) Comments There were no unit shutdowns

, during the month.

i N

} l (1) KLASUN. (4) MLallUll

)

,, A Equipment Failure (Explain) I - Manual j D - Maintenance or Test 2 - Manual Trip / scram l C - Refueling 3 - Automatic Trip / Scram 4 D Regulatory Restriction 4 - Continuation 1

) E Operator Training / License Examination 5 other(Explain)

F- Administrative G -Operational Error (Explain)

} 11-Other(Explain) '

i

! CAUSE/ CORRECTIVE ACTION / COMMENTS J

Is - NARRATIVE REPORT No significant power reductions occurred this period.

E2-2 4