South:rn Nucbtr Op; rating Company Post Offica Box 1295 Birminghtm. /,labima 35201 T:liphone (205) 868 5131 Southern Nudear Operating Company o m uor.y Vice Presider't Farley Project the Southert) electnC System Novernber 12, 1996 S
Docket Nos.
50-348 50-364 l
U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D C 20555 Joseph M. Farley Nuclear Plant Monthly Operating Report Ladies and Gentlemen:
Attached are the October 1996 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2, as required by Section 6.9.1.10 of the Technical Specifications.
If you have any questions, please advise, t
Respectfully submitted,
$f k3r*f Dave Morey RWC:(mor)
Attachments cc:
Mr. S. D. Ebneter, Region II Administrator Mr. J. I. Zimmerman, NRR Project Manager Mr. T. M. Ross, FNP Sr. Resident Inspector
/f I
.)
l 9611190299 961031 i
PDR ADOCK 05000348 i
R PDR l
190110
~
1 Joseph M. Farley Nuclear Plant Unit 1 Narrative Summary of Operations October 1996 There were no unit shutdowns or major power reductions during the month.
There was no major safety related maintenance performed during the month.
4 J
d l
l T
2 i
~
OPERATING DATA REPORT DOCKET NO.
50-348 DATE November 6,1996 COMPLETED BY M. W. McAnuity TELEPilONE (334) 899-5156, ext.3640 OPERATING STATUS 1.
Unit Name:
Joseph M. Farley - Unit 1 Notes 2.
Reporting Period:
October 1996
- 1) Cumulative data since 12-01-77, 3.
Licensed Thermal Power (MWt):
2,652 date of commercial operation.
4.
' Nameplate Rating (Gross MWe):
860 5.
Design Electrical Rating (Net MWe):
829 6.
Maximum Dependable Capacity (Gross MWe):
855.7 7.
Maximum Dependable Capacity (Net MWe):
812 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Smce Last Report, Give Reasons:
N/A 9.
Power Level To Which Restricted,If Any (Net MWe):
N/A
- 10. Reasons For Restrictions,If Any:
N/A This Month Yr. to Date Cumulative
- 11. Hours in Reporting Period 745.0 7,320.0 165,840.0
- 12. Number Of Hours Reactor Was Critical 745.0 7,291.3 133,980.7
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 3,650.0
- 14. Hours Generator On-line 745.0 7,276.0 131,951.7
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1,975,740.0 19,082,954.1 339,837,327.0
- 17. Gross Electrical Energy Generated (MWH) 647,260.0 6,242,755.0 109,734,909.0
- 18. Net Electrical Energy Generated (MWH) 615,186.0 5,928,653.0 103,668,305.0
- 19. Unit Service Factor 100.0 99.4 79.6
- 20. Unit Availability Factor 100.0 99.4 79.6
- 21. Unit Capacity Factor (Using MDC Net) 101.7 99.7 77.0
- 22. Unit Capacity Factor (Using DER Net) 99.6 97.7 75.4
- 23. Unit Forced Outage Rate 0.0 0.0 5.6
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refueling Outage scheduled for March 15,1997 with a duration of 49 days.
- 25. If Shut Down at End Of Report Period, Estimated Date of Startup:
N/A
- 26. Units In Test Status (Prior To Commercial Operation):
Forecast Achieved Initial Criticality 08/06/77 08/09/77 Initial Electricity 08/20/77 08/l8/77 Commercial Operation 12/01/77 12/01/77
=
DOCKET NO.
50-348 i
~
UNIT 1
j DATE November 6,1996
~
COMPLETED BY M. W. McAnulty TELEPHONE (334) 899-5156 ext 3640 i
MONTH October DAY - AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) e l
821 17 823 l
2 818 18 826 3
820 19 833 4
821 20 833 1
5 829 21 831
)
6 828 22 827 i
7 828 23 829 J
8 824 24 832 9
826 25 827 10 828 26 818 11 831 27 819 12 829 28 822 l3 829 29 821 14 828 30 819 15 827 31 827 i
16 826 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.
UNIT SHUTDOWNS AND POWER REDUCTIONS 1
I DOCKET NO.
50-348 UNITNAME J. M. Farley - Unit 1 DATE November 6,1996 -
COMPLETED BY M. W. McAnulty REPORT MONT11 October.
. TELEPHONE (334) 899-5156, ext.3640 R
M E
E S
T.
A T
Y Y
S 11 SC P
O O
TO CAUSE AND CORRECT 1VE E
DURATION N
D ED COMPONENT ACTION TO
]
NO. '
DATE (1)
(IlOURS)
(2)
(3)
LER #. ME CODE (5)
PREVENT RECURRENCE j
There were nO Shutdowns Or power reductions during the month, i
l l
l l
l f'
1:
2:
3:
EVENTS REPORTED F: Forced Reason Method INVOLVE A S: Scheduled A Equipment Failure (Explain) 1 Manual GREATER TIIAN 20%
B. Maintenance or Test 2 ManualScram REDUCTION IN C Refueling 3 - Automatic Scram AVERAGE DAILY
{
D - Regulatory Restriction 4.Other (Explain)
POWER LEVEL FOR E - Operator Training & License Examination TIIE PRECEDINO 24 F. Administrative IIOURS.
0 OperationalError(Explain) 11.Other(Explain)
,~
1 1.
l Joseph M. Farley Nuclear Plant l
Unit 2
. Narrative Summary of Operations L
October 1996 i
l The unit was taken offline at 0001 on October 12,1996, for the elevrath refueling outage. In response to NRC Bulletin 96-01 " Control Rod Insertior Problems",
the unit was manually tripped from 2% reactor power and all roh inserted.
1 The following major safety related maintenance was perfonv.ed during the month:
- 1. Eighteen month PM's were performed on the 2B diesel generator. This included i
replacing the tube bundles for the intercooler, jacket water and lube oil heat exchangers.
{
i
- 2. The 2A RHR loop suction relief valve was rebuilt after failing to completely rescat during a pressure transient that occurred after shutdown.
L The following maintenance was associated with outage activities:
l
- 1. The reactor was defueled. Visual inspection of the fuel was performed during l
the offload. Fuel oxide thickness measurements were performed as was control rod drag testing.
i
- 2. The 10 year inspection of the 2C reactor coolant pump was commenced which i
included a stator replacement.
l
- 3. Performed pressure pulse and sludge lance of secondary of steam generators and i
l began 100% eddy current testing of steam generator tubes.
l
- 4. Modification to autosequence the 2D service air compressor onto the A train diesel generator during LOSP, LOSP/SI and Station Blackout events, j
- 5. Replaced the 2A and 23 RHR pump impellers to increase the pump performance margin at the runout end.
l~
j 1
i i
i
i OPERATING DATA REPORT DOCKET NO.
50-364 DATE November 6,1996 COMPLETED BY M. W. McAnulty TELEPIIONE (334) 899-5156, ext.3640
{
OPERATING 3TATUS 1.
Unit Name:
Joseph M. Farley - Unit 2 Notes 2.
Reporting Period:
October 1996
- 1) Cumulative data since 07-30-81, 3.
Licensed Thermal Power (MWt):
2,652 date of commercial operation.
4.
Nameplate Rating (Gross MWe):
860 5.
Design Electrical Rating (Net MWe):
829 6.
Maximum Dependable Capacity (Gross MWe):
863.6 7.
Maximum Dependable Capacity (Net MWe):
822 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Smce Last Report, Give Reasons:
N/A 9.
Power Level To Which Restricted, If Any (Net MWe):
N/A
- 10. Reasons For Restrictions,if Any:
N/A This Month Yr. to Date Cumulative
- 11. Hours in Reporting Period 745.0 7,320.0 133,753.0
- 12. Number Of Hours Reactor Was Critical 265.9 6,840.9 115,744.3
- 13. Reactor Reserve Shutdown Hours 0.0 6,839.0 114,049.2 0.0 138.0
- 14. Hours Generator vn-line 264.0
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 696,494.8 17,725,193.8 290,698,984.2
- 17. Gross Electrical Ener " Generated (MWH) 226,753.0 5,806,131.0 95,268,610.0
- 18. Net Electrical Energy oenerated (MWH) 211,291.0 5,520,617.0 90,334,268.0
- 19. Unit Service Factor 35.4 93.4 85.3
- 20. Unit Availability Factor 35.4 93.4 85.3
- 21. Unit Capacity Factor (Using MDC Net) 34.5 91.7 82.4
- 22. Unit Capacity Factor (Using DER Net) 34.2 91.0 81.5
- 23. Unit Forced Outage Rate 0.0 0.0 3.8
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
)
l
- 25. If Shut Down at End Of Report Period, Estimated Date of Startup:
11/29/96
- 26. Units In Test Status (Prior To Commercial Operation):
Forecast Achieved Initial Criticality 05/06/81 05/08/81 Initial Electricity 05/24/81 05/25/81 Commercial Operation 08/01/81 07/30/81 l
l
DOCKET NO.
50-364 i
UNIT 2
i DATE November 6,1996 COMPLETED BY M. W. McAnuity TELEPHONE (334) 899-5156 ext 3640 MONTH October DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 821 17 0
2.
819 18 0
3 821 19 0
4 822 20 0
5 832-21 0
6 830 22 0
7 832 23 0
8 828 24 0
9 829 25 0
10 832 26 0
i 11 733 27 0
12 0
28 0
13 0
29 0
i 14 0
30 0
15 0
31 0
16 0
INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-364 UNIT NAME J. M. Farley - Unit 2 DATE November 6,1996 COMPLETED BY M. W. McAnulty REPORT MONTH October TELEPHONE (334) 899-5156, ext.3640 R-M E
E s
T A
T Y
Y s
11 SC P
O O
TO CAUsE AND CORRECTIVE E
DURATION N
D ED COMPONENT ACrlON TO NO.
DATE (1)
(llOURs)
(2)
(3)
LER#
ME CODE (5)
PREVENT RECURRENCE 011 961012 S
481 C
1 N/A N/A N/A At 0001, on 961012, the Unit was taken offline for the eleventh refueling outage.
In response to NRC Bulletin 96-01 " Control Rod Insertion Problems", the unit was manually tripped from 2% reactor power.
All rods fully inserted satisfactorily and rod drop time testing was performed satisfactorily after shutdown.
I j
1:
2:
3:
EVENTS REPORTED F: Forced Reason Method INVOLVE A s: scheduled A Equipment Failure (Explain) 1 - Manual GREATER TilAN 20%
B Maintenance or Test 2 - Manual scram REDUCTION IN C - Refueling 3 Automatic scram AVERAGE DAILY D Regulatory Restriction 4 -Other (Explain)
POWER LEVEL FOR E Operator Training & License Examination Tile PRECEDING 24
~ F-Administrative llOURs.
G OperationalEnor(Explain)
II Other(Explain)