Monthly Operating Repts for Oct 1996 for Jm Farley Nuclear Plant Units 1 & 2
ML20134K714
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 10/31/1996
From: Mcanulty M, Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9611190299
Download: ML20134K714 (9)


Text

. - -, -. . . - - .. -. - - - - - - -

    • . South:rn Nucbtr Op; rating Company

, , Post Offica Box 1295 Birminghtm. /,labima 35201 T:liphone (205) 868 5131 o m uor.y Southern Nudear Operating Company Vice Presider't Farley Project the Southert) electnC System Novernber 12, 1996 S

Docket Nos. 50-348 50-364 l U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D C 20555 -

Joseph M. Farley Nuclear Plant Monthly Operating Report Ladies and Gentlemen:

Attached are the October 1996 Monthly Operating Reports for Joseph M. Farley Nuclear Plant -

Units 1 and 2, as required by Section 6.9.1.10 of the Technical Specifications. ,

If you have any questions, please advise, t Respectfully submitted,

$f k3r*f Dave Morey RWC:(mor)

Attachments cc: Mr. S. D. Ebneter, Region II Administrator Mr. J. I. Zimmerman, NRR Project Manager Mr. T. M. Ross, FNP Sr. Resident Inspector

/f

.)

I l

9611190299 961031 i PDR ADOCK 05000348 i R PDR l l

190110 .

l

. _ . . ~ _ . _ _ . - . . . _ . _ . - - . -- ..

1 .

Joseph M. Farley Nuclear Plant Unit 1 Narrative Summary of Operations October 1996 There were no unit shutdowns or major power reductions during the month.

There was no major safety related maintenance performed during the month.

4 J

d l

l T

2 I

i l

~

, OPERATING DATA REPORT DOCKET NO. 50-348 DATE November 6,1996 COMPLETED BY M. W. McAnuity TELEPilONE (334) 899-5156, ext.3640  ;

OPERATING STATUS

1. Unit Name: Joseph M. Farley - Unit 1 Notes
2. Reporting Period: October 1996 1) Cumulative data since 12-01-77,
3. Licensed Thermal Power (MWt): 2,652 date of commercial operation.
4. ' Nameplate Rating (Gross MWe): 860 ,
5. Design Electrical Rating (Net MWe): 829
6. Maximum Dependable Capacity (Gross MWe): 855.7
7. Maximum Dependable Capacity (Net MWe): 812
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Smce Last Report, Give Reasons: N/A
9. Power Level To Which Restricted,If Any (Net MWe): N/A
10. Reasons For Restrictions,If Any: N/A This Month Yr. to Date Cumulative
11. Hours in Reporting Period 745.0 7,320.0 165,840.0
12. Number Of Hours Reactor Was Critical 745.0 7,291.3 133,980.7
13. Reactor Reserve Shutdown Hours 0.0 0.0 3,650.0
14. Hours Generator On-line 745.0 7,276.0 131,951.7
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1,975,740.0 19,082,954.1 339,837,327.0
17. Gross Electrical Energy Generated (MWH) 647,260.0 6,242,755.0 109,734,909.0
18. Net Electrical Energy Generated (MWH) 615,186.0 5,928,653.0 103,668,305.0
19. Unit Service Factor 100.0 99.4 79.6
20. Unit Availability Factor 100.0 99.4 79.6
21. Unit Capacity Factor (Using MDC Net) 101.7 99.7 77.0
22. Unit Capacity Factor (Using DER Net) 99.6 97.7 75.4
23. Unit Forced Outage Rate 0.0 0.0 5.6
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueling Outage scheduled for March 15,1997 with a duration of 49 days.

25. If Shut Down at End Of Report Period, Estimated Date of Startup: N/A
26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved Initial Criticality 08/06/77 08/09/77 Initial Electricity 08/20/77 08/l8/77 Commercial Operation 12/01/77 12/01/77

. . - - - . , . . .- . . . =

~ " DOCKET NO. 50-348 i UNIT 1 j

~

, DATE November 6,1996 COMPLETED BY M. W. McAnulty i

TELEPHONE (334) 899-5156 ext 3640 MONTH October DAY - AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) e l 821 17 823 l 2 818 18 826 3 820 19 833 4 821 20 833 1

5 829 21 831 )

6 828 22 827 i 7 828 23 829 8 824 24 832 J 9 826 25 827 l 10 828 26 818 I

11 831 27 819 12 829 28 822 l3 829 29 821 ._

14 828 30 819 15 827 31 827 i 16 826 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.

UNIT SHUTDOWNS AND POWER REDUCTIONS .

1 I

. DOCKET NO. 50-348 l UNITNAME J. M. Farley - Unit 1 DATE November 6,1996 -

COMPLETED BY M. W. McAnulty REPORT MONT11 October . . TELEPHONE (334) 899-5156, ext.3640 R M E E S T. A T Y Y S 11 SC P O O TO CAUSE AND CORRECT 1VE E DURATION N D ED COMPONENT ACTION TO

]

NO. ' DATE (1) (IlOURS) (2) (3) LER # . ME CODE (5) PREVENT RECURRENCE j There were nO Shutdowns Or power reductions during the month, i l

l l

l l

f' 1: 2: 3: EVENTS REPORTED F: Forced Reason Method INVOLVE A S: Scheduled A Equipment Failure (Explain) 1 Manual GREATER TIIAN 20%

B . Maintenance or Test 2 ManualScram REDUCTION IN C Refueling 3 - Automatic Scram AVERAGE DAILY

{ D - Regulatory Restriction 4.Other (Explain) POWER LEVEL FOR E - Operator Training & License Examination TIIE PRECEDINO 24 F. Administrative IIOURS.

0 OperationalError(Explain) 11.Other(Explain)

,~ 1

1. .

l Joseph M. Farley Nuclear Plant l Unit 2

! . Narrative Summary of Operations L October 1996 i ,

l The unit was taken offline at 0001 on October 12,1996, for the elevrath refueling outage. In response to NRC Bulletin 96-01 " Control Rod Insertior Problems",

the unit was manually tripped from 2% reactor power and all roh inserted. 1 The following major safety related maintenance was perfonv.ed during the month:

1. Eighteen month PM's were performed on the 2B diesel generator. This included i replacing the tube bundles for the intercooler, jacket water and lube oil heat exchangers.

{

i

- 2. The 2A RHR loop suction relief valve was rebuilt after failing to completely rescat l during a pressure transient that occurred after shutdown. )

L The following maintenance was associated with outage activities:

l 1. The reactor was defueled. Visual inspection of the fuel was performed during l

the offload. Fuel oxide thickness measurements were performed as was control rod drag testing.

i

2. The 10 year inspection of the 2C reactor coolant pump was commenced which i included a stator replacement. l
3. Performed pressure pulse and sludge lance of secondary of steam generators and i l began 100% eddy current testing of steam generator tubes. l l
4. Modification to autosequence the 2D service air compressor onto the A train diesel generator during LOSP, LOSP/SI and Station Blackout events, j
5. Replaced the 2A and 23 RHR pump impellers to increase the pump performance margin at the runout end.

l~

j 1

i i

i

i

, OPERATING DATA REPORT DOCKET NO. 50-364 DATE November 6,1996 COMPLETED BY M. W. McAnulty TELEPIIONE (334) 899-5156, ext.3640

{

OPERATING 3TATUS

1. Unit Name: Joseph M. Farley - Unit 2 Notes
2. Reporting Period: October 1996 1) Cumulative data since 07-30-81,
3. Licensed Thermal Power (MWt): 2,652 date of commercial operation.
4. Nameplate Rating (Gross MWe): 860  !
5. Design Electrical Rating (Net MWe): 829
6. Maximum Dependable Capacity (Gross MWe): 863.6
7. Maximum Dependable Capacity (Net MWe): 822
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Smce Last Report, Give Reasons: N/A
9. Power Level To Which Restricted, If Any (Net MWe): N/A
10. Reasons For Restrictions,if Any: N/A This Month Yr. to Date Cumulative
11. Hours in Reporting Period 745.0 7,320.0 133,753.0
12. Number Of Hours Reactor Was Critical 265.9 6,840.9 115,744.3
13. Reactor Reserve Shutdown Hours 0.0 _

0.0 138.0

14. Hours Generator vn-line 264.0 6,839.0 114,049.2
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 696,494.8 17,725,193.8 290,698,984.2
17. Gross Electrical Ener " Generated (MWH) 226,753.0 5,806,131.0 95,268,610.0
18. Net Electrical Energy oenerated (MWH) 211,291.0 5,520,617.0 90,334,268.0
19. Unit Service Factor 35.4 93.4 85.3
20. Unit Availability Factor 35.4 93.4 85.3
21. Unit Capacity Factor (Using MDC Net) 34.5 91.7 82.4
22. Unit Capacity Factor (Using DER Net) 34.2 91.0 81.5
23. Unit Forced Outage Rate 0.0 0.0 3.8
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): )

l 25. If Shut Down at End Of Report Period, Estimated Date of Startup: 11/29/96

26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved Initial Criticality 05/06/81 05/08/81 Initial Electricity 05/24/81 05/25/81 Commercial Operation 08/01/81 07/30/81 l l l

l

. .' DOCKET NO. 50-364 i UNIT i 2

. DATE November 6,1996 COMPLETED BY M. W. McAnuity TELEPHONE (334) 899-5156 ext 3640 MONTH October DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 821 17 0

2. 819 18 0 3 821 19 0 4 822 20 0 l 5 832- 21 0 6 830 22 0 I

7 832 23 0 8 828 24 0 9 829 25 0 10 832 26 0 i

11 733 27 0 ,

12 0 28 0 13 0 29 0 i 14 0 30 0 15 0 31 0 16 0 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.

UNIT SHUTDOWNS AND POWER REDUCTIONS

,, ,. DOCKET NO. 50-364 UNIT NAME J. M. Farley - Unit 2 DATE November 6,1996 COMPLETED BY M. W. McAnulty REPORT MONTH October TELEPHONE (334) 899-5156, ext.3640 R- M E E s T A T Y Y s 11 SC P O O TO CAUsE AND CORRECTIVE E DURATION N D ED COMPONENT ACrlON TO NO. DATE (1) (llOURs) (2) (3) LER# ME CODE (5) PREVENT RECURRENCE 011 961012 S 481 C 1 N/A N/A N/A At 0001, on 961012, the Unit was taken offline for the eleventh refueling outage.

In response to NRC Bulletin 96-01 " Control Rod Insertion Problems", the unit was manually tripped from 2% reactor power.

All rods fully inserted satisfactorily and rod drop time testing was performed satisfactorily after shutdown.

I j 1: 2: 3: EVENTS REPORTED F: Forced Reason Method INVOLVE A s: scheduled A Equipment Failure (Explain) 1 - Manual GREATER TilAN 20%

B Maintenance or Test 2 - Manual scram REDUCTION IN C - Refueling 3 Automatic scram AVERAGE DAILY D Regulatory Restriction 4 -Other (Explain) POWER LEVEL FOR E Operator Training & License Examination Tile PRECEDING 24

~ F- Administrative llOURs.

G OperationalEnor(Explain)

II Other(Explain)