MONTHYEARML20217G0361999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20212E7451999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Hcgs,Unit 1.With Summary of Changes,Tests & Experiments Implemented During Aug 1999.With ML20216E4941999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Jmfnp.With ML20210R6031999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With L-99-267, Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20209G0661999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With L-99-023, Monthly Operating Repts for May 1999 for Jfnp Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Jfnp Units 1 & 2. with L-99-020, Monthly Operating Repts for Apr 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With L-99-161, Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20205N0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20207M6421999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20203A2651999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20199E6591998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20198B2561998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20195C9681998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20154H6001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20197C8991998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20237B1891998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20236M5981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20248M3121998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20247F3631998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20216D5941998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Joseph M Farley Nuclear Plant,Units 1 & 2 ML20216D9811998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20202G4211998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20198L6191997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Jm Farley Nuclear Plant,Units 1 & 2 ML20203F6391997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Jm Farley Nuclear Plant,Units 1 & 2 ML20198T4151997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Jm Farley Nuclear Plant ML20211N7221997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Jm Farley Nuclear Plant Units 1 & 2 ML20216J3151997-08-31031 August 1997 Monthly Operating Repts for August 1997 for Jfnp ML20210K5981997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Jm Farley Nuclear Plant,Units 1 & 2 ML20141H3191997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Joseph M Farley Nuclear Plant Units 1 & 2 ML20148K6081997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Joseph M Farley Nuclear Plant ML20141E3121997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Jm Farley Nuclear Plant Units 1 & 2 ML20137T1841997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Jm Farley Nuclear Plant Units 1 & 2 ML20136G4731997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Jm Farley Plant Units 1 & 2 ML20138K5881997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Jm Farley Nuclear Plant Units 1 & 2 ML20133F4791996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20132C0631996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20134K7141996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20128Q1161996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Jm Farley Nuclear Plant,Units 1 & 2 ML20117M1291996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20116J6421996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20115D6821996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20117M2721996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20111D1401996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Jm Farley Plant Units 1 & 2 ML20101R6271996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Jm Farley Nuclear Plant ML20106H0791996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Jm Farley Nuclear Plant ML20097D5651996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Jm Farley Nuclear Plant ML20096C0921995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Jm Farley Nuclear Plant Units 1 & 2 ML20095E9451995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Joseph M Farley Nuclear Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217P0761999-10-0606 October 1999 Non-proprietary, Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs ML20217G0361999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20212E7451999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Hcgs,Unit 1.With Summary of Changes,Tests & Experiments Implemented During Aug 1999.With ML20216E4941999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Jmfnp.With ML20210T2161999-08-0606 August 1999 Draft SE Supporting Proposed Conversion of Current TS to ITS for Plant ML20211B2011999-08-0404 August 1999 Informs Commission About Results of NRC Staff Review of Kaowool Fire Barriers at Farley Nuclear Plant,Units 1 & 2 & Staff Plans to Address Technical Issues with Kaowool & FP-60 Barriers ML20210R6031999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20196J3791999-06-30030 June 1999 Safety Evaluation of TR WCAP-14750, RCS Flow Verification Using Elbow Taps at Westinghouse 3-Loop Pwrs. Rept Acceptable ML20209G0661999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With L-99-267, Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With L-99-023, Monthly Operating Repts for May 1999 for Jfnp Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Jfnp Units 1 & 2. with ML20206G7471999-05-0404 May 1999 Safety Evaluation Accepting Corrective Actions Taken by SNC to Ensure That Valves Perform Intended Safety Functions & Concluding That SNC Adequately Addressed Requested Actions in GL 95-07 L-99-020, Monthly Operating Repts for Apr 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20206C9461999-04-30030 April 1999 1:Final Cycle 16 Freespan ODSCC Operational Assessment L-99-161, Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20205N0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20204D7271999-03-15015 March 1999 ISI Refueling 15,Interval 2,Period 3,Outage 3 for Jm Farley Nuclear Generating Plant,Unit 1 ML20207M6421999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20203A2651999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20199D8611999-01-12012 January 1999 SER Accepting Relief Request for Inservice Insp Program for Plant,Units 1 & 2 ML20199E6591998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20206C8081998-12-31031 December 1998 Alabama Power 1998 Annual Rept ML20198K4091998-12-18018 December 1998 COLR for Jm Farley,Unit 1 Cycle 16 ML20198B2561998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20195E2281998-11-16016 November 1998 Safety Evaluation Authorizing Relief Request for Second 10-year ISI Program Relief Request 56 for Plant,Unit 1 ML20195C9681998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20155E0271998-10-29029 October 1998 SER Approving & Denying in Part Inservice Testing Program Relief Requests for Plant.Relief Requests Q1P16-RR-V-3 & Q2P16-RR-V Denied Since Requests Do Not Meet Size Requirement of GL 89-04 ML20154B6121998-10-0101 October 1998 Safety Evaluation Granting Second 10-year ISI Requests for Relief RR-13 & RR-49 Through RR-55 for Jm Farley NPP Unit 1 ML20151V8341998-09-30030 September 1998 Non-proprietary Rev 2 to NSA-SSO-96-525, Jm Farley Nuclear Plant Safety Analysis IR Neutron Flux Reactor Trip Setpoint Change ML20154H6001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20154H0121998-09-30030 September 1998 Submittal-Only Screening Review of Farley Nuclear Plant IPEEE (Seismic Portion) ML20197C8991998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20237C5471998-08-20020 August 1998 Suppl to SE Re Amends 137 & 129 to Licenses NPF-2 & NPF-8, Respectively.Se Being Supplemented to Incorporate Clarifications/Changes & Revise Commitment for Insp of SG U-bends in Rows 1 & 2 for Unit 2 Only ML20236Y1121998-07-31031 July 1998 Voltage-Based Repair Criteria 90-Day Rept ML20237B1891998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20237A2181998-07-24024 July 1998 Jm Farley Unit 2 ISI Rept Interval 2,Period 3 Outage 1, Refueling Outage 12 ML20236U6141998-07-23023 July 1998 Safety Evaluation Authorizing Use of Alternative Alloy 690 Welds (Inco 52 & 152) as Substitute for Other Weld Metal ML20236R8671998-07-0909 July 1998 Safety Evaluation Concluding That Southern Nuclear Operating Co USI A-46 Implementation Program Has Met Purpose & Intent of Criteria in GIP-2 & Staff SSER-2 on GIP-2 for Resolution of USI A-46 ML20236M5981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20154H0461998-06-30030 June 1998 Technical Evaluation Rept on Review of Farley Nuclear Plant IPEEE Submittal on High Winds,Flood & Other External Events (Hfo) ML20248M3121998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20247F3631998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20217D2591998-04-21021 April 1998 Safety Evaluation Accepting Licensee Proposed Alternative Re Augmented Exam of Reactor Vessel Shell Welds for Plant ML20247E8851998-03-31031 March 1998 FNP Unit 2 Cycle 13 Colr ML20217H3191998-03-31031 March 1998 Safety Evaluation Accepting Proposed Changes to Plant Matl Surveillance Programs ML20216D5941998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Joseph M Farley Nuclear Plant,Units 1 & 2 ML20217D4081998-03-24024 March 1998 Safety Evaluation Accepting Proposed Changes to Maintain Calibration Info Required by ANSI N45.2.4-1972 ML20216H6731998-03-17017 March 1998 SER Accepting Quality Assurance Program Description Change for Joseph M Farley Nuclear Plant,Units 1 & 2 ML20216J6851998-03-16016 March 1998 Revised Pages 58 & 59 to Fnp,Units 1 & 2,Power Uprate Project BOP Licensing Rept ML20216D9811998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Jm Farley Nuclear Plant,Units 1 & 2 1999-09-30
[Table view] |
Text
. - -, -. . . - - .. -. - - - - - - -
- . South:rn Nucbtr Op; rating Company
, , Post Offica Box 1295 Birminghtm. /,labima 35201 T:liphone (205) 868 5131 o m uor.y Southern Nudear Operating Company Vice Presider't Farley Project the Southert) electnC System Novernber 12, 1996 S
Docket Nos. 50-348 50-364 l U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D C 20555 -
Joseph M. Farley Nuclear Plant Monthly Operating Report Ladies and Gentlemen:
Attached are the October 1996 Monthly Operating Reports for Joseph M. Farley Nuclear Plant -
Units 1 and 2, as required by Section 6.9.1.10 of the Technical Specifications. ,
If you have any questions, please advise, t Respectfully submitted,
$f k3r*f Dave Morey RWC:(mor)
Attachments cc: Mr. S. D. Ebneter, Region II Administrator Mr. J. I. Zimmerman, NRR Project Manager Mr. T. M. Ross, FNP Sr. Resident Inspector
/f
.)
I l
9611190299 961031 i PDR ADOCK 05000348 i R PDR l l
190110 .
l
. _ . . ~ _ . _ _ . - . . . _ . _ . - - . -- ..
1 .
Joseph M. Farley Nuclear Plant Unit 1 Narrative Summary of Operations October 1996 There were no unit shutdowns or major power reductions during the month.
There was no major safety related maintenance performed during the month.
4 J
d l
l T
2 I
i l
~
, OPERATING DATA REPORT DOCKET NO. 50-348 DATE November 6,1996 COMPLETED BY M. W. McAnuity TELEPilONE (334) 899-5156, ext.3640 ;
OPERATING STATUS
- 1. Unit Name: Joseph M. Farley - Unit 1 Notes
- 2. Reporting Period: October 1996 1) Cumulative data since 12-01-77,
- 3. Licensed Thermal Power (MWt): 2,652 date of commercial operation.
- 4. ' Nameplate Rating (Gross MWe): 860 ,
- 5. Design Electrical Rating (Net MWe): 829
- 6. Maximum Dependable Capacity (Gross MWe): 855.7
- 7. Maximum Dependable Capacity (Net MWe): 812
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Smce Last Report, Give Reasons: N/A
- 9. Power Level To Which Restricted,If Any (Net MWe): N/A
- 10. Reasons For Restrictions,If Any: N/A This Month Yr. to Date Cumulative
- 11. Hours in Reporting Period 745.0 7,320.0 165,840.0
- 12. Number Of Hours Reactor Was Critical 745.0 7,291.3 133,980.7
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 3,650.0
- 14. Hours Generator On-line 745.0 7,276.0 131,951.7
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1,975,740.0 19,082,954.1 339,837,327.0
- 17. Gross Electrical Energy Generated (MWH) 647,260.0 6,242,755.0 109,734,909.0
- 18. Net Electrical Energy Generated (MWH) 615,186.0 5,928,653.0 103,668,305.0
- 19. Unit Service Factor 100.0 99.4 79.6
- 20. Unit Availability Factor 100.0 99.4 79.6
- 21. Unit Capacity Factor (Using MDC Net) 101.7 99.7 77.0
- 22. Unit Capacity Factor (Using DER Net) 99.6 97.7 75.4
- 23. Unit Forced Outage Rate 0.0 0.0 5.6
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refueling Outage scheduled for March 15,1997 with a duration of 49 days.
- 25. If Shut Down at End Of Report Period, Estimated Date of Startup: N/A
- 26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved Initial Criticality 08/06/77 08/09/77 Initial Electricity 08/20/77 08/l8/77 Commercial Operation 12/01/77 12/01/77
. . - - - . , . . .- . . . =
~ " DOCKET NO. 50-348 i UNIT 1 j
~
, DATE November 6,1996 COMPLETED BY M. W. McAnulty i
TELEPHONE (334) 899-5156 ext 3640 MONTH October DAY - AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) e l 821 17 823 l 2 818 18 826 3 820 19 833 4 821 20 833 1
5 829 21 831 )
6 828 22 827 i 7 828 23 829 8 824 24 832 J 9 826 25 827 l 10 828 26 818 I
11 831 27 819 12 829 28 822 l3 829 29 821 ._
14 828 30 819 15 827 31 827 i 16 826 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.
UNIT SHUTDOWNS AND POWER REDUCTIONS .
1 I
. DOCKET NO. 50-348 l UNITNAME J. M. Farley - Unit 1 DATE November 6,1996 -
COMPLETED BY M. W. McAnulty REPORT MONT11 October . . TELEPHONE (334) 899-5156, ext.3640 R M E E S T. A T Y Y S 11 SC P O O TO CAUSE AND CORRECT 1VE E DURATION N D ED COMPONENT ACTION TO
]
NO. ' DATE (1) (IlOURS) (2) (3) LER # . ME CODE (5) PREVENT RECURRENCE j There were nO Shutdowns Or power reductions during the month, i l
l l
l l
f' 1: 2: 3: EVENTS REPORTED F: Forced Reason Method INVOLVE A S: Scheduled A Equipment Failure (Explain) 1 Manual GREATER TIIAN 20%
B . Maintenance or Test 2 ManualScram REDUCTION IN C Refueling 3 - Automatic Scram AVERAGE DAILY
{ D - Regulatory Restriction 4.Other (Explain) POWER LEVEL FOR E - Operator Training & License Examination TIIE PRECEDINO 24 F. Administrative IIOURS.
0 OperationalError(Explain) 11.Other(Explain)
,~ 1
- 1. .
l Joseph M. Farley Nuclear Plant l Unit 2
! . Narrative Summary of Operations L October 1996 i ,
l The unit was taken offline at 0001 on October 12,1996, for the elevrath refueling outage. In response to NRC Bulletin 96-01 " Control Rod Insertior Problems",
the unit was manually tripped from 2% reactor power and all roh inserted. 1 The following major safety related maintenance was perfonv.ed during the month:
- 1. Eighteen month PM's were performed on the 2B diesel generator. This included i replacing the tube bundles for the intercooler, jacket water and lube oil heat exchangers.
{
i
- 2. The 2A RHR loop suction relief valve was rebuilt after failing to completely rescat l during a pressure transient that occurred after shutdown. )
L The following maintenance was associated with outage activities:
l 1. The reactor was defueled. Visual inspection of the fuel was performed during l
the offload. Fuel oxide thickness measurements were performed as was control rod drag testing.
i
- 2. The 10 year inspection of the 2C reactor coolant pump was commenced which i included a stator replacement. l
- 3. Performed pressure pulse and sludge lance of secondary of steam generators and i l began 100% eddy current testing of steam generator tubes. l l
- 4. Modification to autosequence the 2D service air compressor onto the A train diesel generator during LOSP, LOSP/SI and Station Blackout events, j
- 5. Replaced the 2A and 23 RHR pump impellers to increase the pump performance margin at the runout end.
l~
j 1
i i
i
i
, OPERATING DATA REPORT DOCKET NO. 50-364 DATE November 6,1996 COMPLETED BY M. W. McAnulty TELEPIIONE (334) 899-5156, ext.3640
{
OPERATING 3TATUS
- 1. Unit Name: Joseph M. Farley - Unit 2 Notes
- 2. Reporting Period: October 1996 1) Cumulative data since 07-30-81,
- 3. Licensed Thermal Power (MWt): 2,652 date of commercial operation.
- 4. Nameplate Rating (Gross MWe): 860 !
- 5. Design Electrical Rating (Net MWe): 829
- 6. Maximum Dependable Capacity (Gross MWe): 863.6
- 7. Maximum Dependable Capacity (Net MWe): 822
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Smce Last Report, Give Reasons: N/A
- 9. Power Level To Which Restricted, If Any (Net MWe): N/A
- 10. Reasons For Restrictions,if Any: N/A This Month Yr. to Date Cumulative
- 11. Hours in Reporting Period 745.0 7,320.0 133,753.0
- 12. Number Of Hours Reactor Was Critical 265.9 6,840.9 115,744.3
- 13. Reactor Reserve Shutdown Hours 0.0 _
0.0 138.0
- 14. Hours Generator vn-line 264.0 6,839.0 114,049.2
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 696,494.8 17,725,193.8 290,698,984.2
- 17. Gross Electrical Ener " Generated (MWH) 226,753.0 5,806,131.0 95,268,610.0
- 18. Net Electrical Energy oenerated (MWH) 211,291.0 5,520,617.0 90,334,268.0
- 19. Unit Service Factor 35.4 93.4 85.3
- 20. Unit Availability Factor 35.4 93.4 85.3
- 21. Unit Capacity Factor (Using MDC Net) 34.5 91.7 82.4
- 22. Unit Capacity Factor (Using DER Net) 34.2 91.0 81.5
- 23. Unit Forced Outage Rate 0.0 0.0 3.8
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): )
l 25. If Shut Down at End Of Report Period, Estimated Date of Startup: 11/29/96
- 26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved Initial Criticality 05/06/81 05/08/81 Initial Electricity 05/24/81 05/25/81 Commercial Operation 08/01/81 07/30/81 l l l
l
. .' DOCKET NO. 50-364 i UNIT i 2
. DATE November 6,1996 COMPLETED BY M. W. McAnuity TELEPHONE (334) 899-5156 ext 3640 MONTH October DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 821 17 0
- 2. 819 18 0 3 821 19 0 4 822 20 0 l 5 832- 21 0 6 830 22 0 I
7 832 23 0 8 828 24 0 9 829 25 0 10 832 26 0 i
11 733 27 0 ,
12 0 28 0 13 0 29 0 i 14 0 30 0 15 0 31 0 16 0 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.
UNIT SHUTDOWNS AND POWER REDUCTIONS
,, ,. DOCKET NO. 50-364 UNIT NAME J. M. Farley - Unit 2 DATE November 6,1996 COMPLETED BY M. W. McAnulty REPORT MONTH October TELEPHONE (334) 899-5156, ext.3640 R- M E E s T A T Y Y s 11 SC P O O TO CAUsE AND CORRECTIVE E DURATION N D ED COMPONENT ACrlON TO NO. DATE (1) (llOURs) (2) (3) LER# ME CODE (5) PREVENT RECURRENCE 011 961012 S 481 C 1 N/A N/A N/A At 0001, on 961012, the Unit was taken offline for the eleventh refueling outage.
In response to NRC Bulletin 96-01 " Control Rod Insertion Problems", the unit was manually tripped from 2% reactor power.
All rods fully inserted satisfactorily and rod drop time testing was performed satisfactorily after shutdown.
I j 1: 2: 3: EVENTS REPORTED F: Forced Reason Method INVOLVE A s: scheduled A Equipment Failure (Explain) 1 - Manual GREATER TilAN 20%
B Maintenance or Test 2 - Manual scram REDUCTION IN C - Refueling 3 Automatic scram AVERAGE DAILY D Regulatory Restriction 4 -Other (Explain) POWER LEVEL FOR E Operator Training & License Examination Tile PRECEDING 24
~ F- Administrative llOURs.
G OperationalEnor(Explain)
II Other(Explain)