ML20216J315

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for August 1997 for Jfnp
ML20216J315
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 08/31/1997
From: Mcanulty M, Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9709170239
Download: ML20216J315 (9)


Text

,e p .

Dave Mrrey Southe.n Nuclear

. Vice President Operating Company larley Profect PO Box 1295 Birminghyn. %tama 35201 Tel 205 992.5131 SOUTHERN September 10, 1997 COMN Energy ro Scrn hur World" l

Docket Nos. 50 348 '

50 364 l

U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D C 20555 Joseph M. Faricy Nuclear Plant Monthly Operating Report Ladies and Centlemen:

Attached are the August 1997 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units i and 2, as required by Section 6s.l.10 of the Technical Speci0 cations.

If you have any questions, please advise.

Respectfully submitted, hl lll/1

Dave Morey RWC:(mor)

Attachments ec: Mr. L. A. Reyes, Region !! AdIninistrator f Mr. J. I. Zimmerman, NRR Project Manager Mr. T, M. Ross, FNP Sr. Resident inspector / g ),l  ;

9709170239 970831 PDR ADOCK 05000348.

R PDR

.I. 'kY b -

g jy 'j

NARRATIVE SUMMAltY OF OPEllATIONS DOCKET NO. Si: 348 UNIT NAME J. M. l'atley Unit I __

DATE September 4d997__

COMPLETED IW M. W. McAnulty__,_

REPORT MONTil August TELEPilONE _(334) 899 5156, ext.3640_

1here were no unit shutdowns or power reductions during the month.

There was no major safety related maintenance performed during the month.

1 l

l

, OPERATING DATA REPORT DOCKET NO. 50 348 DATE _ September 4,1997 COMPLETED IW M. W. McAnuity_

TELEI'llONE (33_4) 899 5156, ext.3640 OPERATING STNTUS

1. Unit Name: Joseph M. Farley Unit I _ ~ Notes
2. Reporting Period: August 1997_ 1) Cumulative data since 12-0177,
3. Licensed Thermal Power (MWt): 2,652_ date of commercial operation.
4. Nameplate Rating (Gross hiWe): 860
5. Design Electrical Rating (Net MWe): 829_
6. hiaximum Dependable Capacity (Gross MWe): 866
7. Maximum Dependable Capacity (Net MWe): 822
8. If Changes occur in Capacity Ratings (Items Number 3 Through 7) Smce Last Report, Give Reasons: N/A
9. Power Level To Which Restricted, if Any (Net MWe): N/A
10. Reasons For Restrictions,if Any: N/A This Month Yr. to Date Cumulative 11, llours in Reporting Period 744.0 5,831.0 173,135.0
12. Number Of11ours Reactor Was Critical 744.0 3,907.9 1391 352.6
13. Reactor Reserve Shutdown llours 0.0 0.0 31650.0 14.11ours Generator On line 744.0 3,874.7_ 137,290.4
15. Unit Reserve Shutdown llours 0.0 0.0 0.0 l 16. Gross Thermal Energy Generated (MWil) 1,973,088.0 9,889 1729.5 353,608,735.9
17. Gross Electrical Energy Generated (MWil) 639,534.0 3,2151174.0 114,226,752.0
18. Net Electrical Energy Generated (MWil) 607,262.0 3,025,444.0 __107,907,400.0
19. Unit Service Factor 100.0 _

66.5 _ 79.3

20. Unit Availability Factor 100.0_ 66.5 79.3
21. Unit Capacity Factor (Using MDC Net) 99.3 63,1 76.5
22. Unit Capacity Factor (Using DER Net) 98.5 62.6 75.2_
23. Unit Forced Outage Rate 0.0, 0.0 5.4
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
25. If Shut Down at End Of Report Period, Estimated Date of Startup: N/A _
26. Units in Test Status (Prior To Commercial Operation): Forecast Athieved Initial Criticality N/A N/A Initial Electricity N/A N/A Commercial Operation N/A _

N/A

, DOCKET NO. 50-348

'JNIT 1-DATE September 4,1997 COMPLETED BY M. W. McAnulty TELEPHONE ___(334) 899 5156 cxt 3640 MONTa August -  !

DAY' AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net)

I 823 17 813

-2 818 18 811 3 813 19 813

4. 815 20 813 5 814 21

_ 815 6 817 22 821 7 818 23 823 8 817 24

, 820 9 816 25 821 10 815 26 821 11 818 27 810 '

12 815- 28 814 l _

13 813 29 815,

14. 813 30 817 15 815 31 817 -

-16 ._ 812 INSTRUC'lLNS

' On this format, list the average daily unit power level in MWe-Net for each day in the reporting period.' Compute to the nearest whole megawatt.

  • UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 348 UNIT NAME J. M. Farley Unit 1 DATE _ _ September 4,1997 COMPLETED BY M. W. McAnulty REPORT MONTil August TELEPilONE _(334] 899-5156, ext.3640

- - = = - - - -

l T A E E T

S Y

l I

Y S 11 SC I P O O TO CAUSE AND CORRECTIVE E DURATION N D -ED COMPONENT AcI10N TO

{'); NO. DATE (1) (ilOURS) (2) LER# ME Q) CODE (3) PREVENT RECURRENCE 7.g [ __

J qThere were nO shutdowns or power reductions during the month.

]  !

O i

I I

i I

l  !

l

! l q

L u. L __.

d 1: 2:

__ ___ J) 3: EVENTS REPORTED F: Forced Reason Method INVOI.VE A S Scheduled A Equipment Failure (Explain) 1 Manual GREATFRlilAN 2ff4 D - Maintenance or Test 2 Ma.eual Scram REDUCrlON IN C - Refueling 3 Automatic Scram AVERAGE DAILY D Regulatory P striction 4 Other(Explain) POWER LEVEL FOR E - Operatar Training & License Examination Tile PRECEDING 24 F- Administrative llOURS.

G - Operational Error (Explain) 1I- Other (Explain)

NARRATIVE

SUMMARY

OF OPERATIONE

,_ DOCKET NO. 50-364 UNIT NAME J. M. Farley - Unit 2 DATE September 4,1997 COMPLETED BY M. W. McAnulty REPORT MONTil August TELEPilONE (334) C99 5156, ext.3640 '

There were no unit shutdowns or power reductions during the month.

There was no major safety related maintenance performed during the month.

l l'

l l-i l

.1 s

,, OPERATING DATA REPORT DOCKET NO. 50 364 DATE September 4,1997 COMPLETED BY M. W. McAnulty TELEPilONE (334) 899 5156, ext.3640 OPFRATING. STATUS

1. Unit Name: Joseph M. Farley - Unit 2 Notes <
2. Reporting Period: August 1997 1) Cumulative data since 07-30-81,
3. 1.icensed Thermal Power (MWt): 2,652 date of commercial operation.
4. Nameplate Rating (Gross MWe): 860 i

S. Design Electrical Rating (Net MWe): 829 j

6. Maximum Dependable Capacity (Gross MWe): 863.6
7. Maximum Dependab!c Capacity (Net MWe): 822 8.

l If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Smce

Last Report, Give Reasons
N/A l 9. Power Level To Which Restricted, if Any (Net MWe): N/A l 10. Reasons For Restrictwns,If Any: _N/A

! This Month Yr. to Date Cumulative

11. Hours in Reporting Period 744.0 5,831._0_ 141,048.0
12. Number Of Hours Reactor Was Critical 744.0_ 5,831.0 121,948.0
13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0
14. Hours Generator On-line 744.0 5,831.0 120,201.9
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) _

1,97',815.0 15,366,907.9 306,815,002.1

17. Gross Electrical Energy Generated (MWH) 646,023.0 5,071,362.0 100,585,660.0
18. Net Electrical Energy Generated (MWH) 615,117.0 4,832,570.0 95,383,026.0_
19. Unit Service Factor 100.0 100.0 85.2
20. Unit Availability Factor 100.0 100.0 85.2
21. Unit Capacity Factor (Using MDC Net) 100.6 100.8 82.4
22. Unit Capacity Factor (Using DER Net) 99.7 81.6
23. Unit Forced Outage Rate 1001 0.0 0.0 3.6
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
25. If Shut Down at End Of Report Period 75stimateu Date of Startup: N/A
26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved Initial Criticality N/A N/A Initial Electricity N/A N/A Commercial Operation N/A N/A

\\ .

    • DOCKET NO. 50-364 UNIT 2 DATE September 4,1997

, COMPLETED BY M. W. McAnulty TELEPHONE (334) 819-5156 ext 3640 MONTH August DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWi!R LEVEL (MWe-Net) (MWe-Not) j q

l 819 17 821 2- 827 18 823 3 823 19 825 __

4 826 20 826 l 5 826 21 828 1

6 830 22 836 l 7 830 23 835 8 828 24 830 9 826 25 832 10 825 26 834 11- 828 27 830

.12 825 28 825 13 823 29 826 14 824' 30 827 15 825 31 825-16 821-INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole mepawatt.

t

,a . . *.

' UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-364 UNIT NAME J. M. Farley . Unit 2 DATE September 4,1997 COMPLETED BY M. W. McAnuity

. REPORT MONTil August TELEPilONE (334) 899 5156, ext.3640

m. -,

I.-- R M E E S T A T Y pY S 11 SC P- 0 0 TO CAUSE AND CORRECTIVE l E DURATION N- D ED COMPONENT ACTION TO I NO. DATE.- (1) (llOURS) (2) (3) LER # ME CODE (5) PREVINT RECURRENCE There were no ShiitdOwns Or pOweFreductions during the month.

i l

I ..

3 99 1: 2; 3: EVbhTS REPORTED F: Forced Reason Method INVOLVE A S: Scheduled . A. Equipment Failure (Explain) I . Manual GREATER TilAN 20%

B MaintenanceorTest 2 ManualScram REDUCTION IN i  : - C-Refucting 3 Automatic Scram AVERAGE DAILY D. Regulatory Restriction 4 Other(Explain) POWER LEVEL FOR E. Operator Training & License Examination Tile PRECEDINO 24 F. Administrative iIOURS.

O -Operational Error (Explain)

II.Other (Explain)