Monthly Operating Repts for Mar 1997 for Jm Farley Nuclear Plant Units 1 & 2
ML20137T184
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 03/31/1997
From: Mcanulty M, Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9704160016
Download: ML20137T184 (8)


Text

_

~

. Dave M: rey SIuthern Nucl:ar Vice President Op: rating Company

, , Farley Project P0. Box 1295 Ermingham. Alabama 35201 Tel 205.992.5131 SOUTHERNkh COMPANY Ayrt1 9, 1997 Energy to Serve hur%rld" Docket Nos. 50-348 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D C 20555 Joseph M. Farley Nuclear Plant Monthly Or, crating Report Ladies and Gentlemen:

Attached are the March 199_7 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2, as required by Section 6.9.1.10 of the Technical Specifications.

If you have any questions, please advise.

Respectfully submitted, h ho w i Dave Morey RWC:(mor)

Attachments h

cc: Mr. L. A. Reyes, Region II Administrator Mr. J. I. Zimmerman, NRR Project Manager Mr. T. .M. Ross, FNP Sr. Resident inspector 150154 9704160016 970331 PDR ADOCK 05000348 R PDR ,

Ih.@!N N4

. N,

4 Joseph M. Farley Nuclear Plant  ;

Unit 1  !

Narrative Summary of Operations March 1997 ,

The unit was taken offline at 0030 on March 15,1997, for the fourteenth refueling outage.

The following maintenance was associated with outage activities:

1. The reactor was defueled. Visual inspection of the fuel was performed during the offload. Fuel oxide thickness measurements were taken  ;

and Rod Control Cluster Assembly (RCCA) eddy current testing was 1 performed for wear measurements.

P

OPERATING DATA REPORT DOCKET NO. 50-348 DATE April 4,1997 COMPLETED BY M. W. McAnulty TELEPilONE (334) 899-5156, ext.3640 F

OPERATINGJSTATUS

1. Unit Name: Joseph M. Farley - Unit 1 Notes
2. Reporting Period: March 1997 1) Cumulative data since 12-01-77,
3. Licensed Thermal Power (MWt): 2,652 date of commercial operation.
4. Nameplate Rating (Gross MWe): 860
5. Design Electrical Rating (Net MWe): 829
6. Maximum Dependable Capacity (Gross MWe): 866
7. Maximum Dependable Capacity (Net MWe): 822
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Smce Last Report, Give Reasons: N/A
9. Power Level To Which Restricted, If Any (Net MWe): N/A
10. Reasons For Restrictions,If Any: N/A This Month Yr. to Date Cumulative
11. Hours in Reporting Period 744.0 2,160.0 169,464.0
12. Number Of Hours Reactor Was Critical 336.6 1,752.6 137,197.3
13. Reactor Reserve Shutdown Hours _.

0.0 0.0 3_,650.0

14. Hours Generator On-line 336.5 1,752.5_ 135,168.2
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 887,754.4 4,511,632.6 348,230,639.0
17. Gross Electrical Energy Generated (MWH) 288,602.0 1,474,852.0 112,486,430.0
18. Net Electrical Energy Generated (MWH) 269,756.0 1,395,092.0 106,277,048.0
19. Unit Service Factor 45.2 81.1 79.8
20. Unit Availability Factor 45.2 81.1 79.8_
21. Unit Capacity Factor (Using MDC Net) 44.1 78.6 77.0
22. Unit Capacity Factor (Using DER Net) 43.7 77.9 75.6
23. Unit Forced Outage Rate 0.0 0.0 5.5
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): I l

l

25. If Shut Down at End Of Report Period, Estimated Date of Startup: 05/09/97 l
26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved Initial Criticality 08/06/77 08/09/77 Initial Electricity 08/20/77 08/18/77 Commercial Operation 12/01/77 12/01/7',  !

. l DOCKET NO. 50-348 UNIT _ 1 DATE April 4,1997 COMPLETED BY M. W. McAnulty TELEPHONE (334) 899-5156 ext 3640 t

MONT11 March DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL j (MWe-Net) (MWe-Net) l l

1 818 17 0 2 l 818 18 0 3 818 19 0 4 822 20 0 5 817 21 0 6 826 22 0 7 829 23 0 8 824 24 0 l

9 822 25 0 10 819 26 0 11 815 27 0 12 822 28 0 13 820 29 0 14 753 30 0 15 0 31 0 16 0 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.

I

UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-348 UNIT NAME J. M. Farley - Unit 1 DATE April 4,1997 COMPLETED BY M. W. McAnulty REPORT MONT11 March TELEPflONE (334) 899-5156, ext.3640 r=- _

R M E E S T A T Y Y S II SC P O O TO CAUSE AND CORRECTIVE E DURATION N D FD COMPONENT ACTION TO NO. DATE (1) (IIOURS) (2) (3) LER # ME CODE (5) PREVENT RECURRENCE

~

~

l002 970315 S 407.5 C 1 N/A N/A N/A l At 0030, On 970315, the unit waS taken OfflInd for the fourteenth refueling Outage.

1 I

I

_ _J l: 2: 3: EVENTS REPORTED F: Forced Reason Method INVOLVE A S: Scheduled A . Equipment Failure (Explain) 1 - Manual GREATER TilAN 20%

B - Maintenance or Test 2 ManualScram REDUCTION IN C - Refueling 3 Automatic Scram AVERAGE DAILY D - Regulatory Restriction 4 - Other (Explain) POWER LEVEL FOR E . Operator Training & License Examination Tile PRECEDING 24 F Administrative llOURS.

G - Operational Error (Explain) 11 - Other (Explain)

. _ - . ._.m . ._ -. . . . _ _ _ . _ _ . _ . _ . . . _ . _ _ . _ . . . . _ . _ . _ . _ _ . . . . . _ . . . . . . _ _ . . _ _ . _ .

t 4 . ,

Joseph M. Farley Nuclear Plant Unit 2 i

Narrative Summary of Operations i'

. March 1997 i

There were no unit shutdowns or power reductions during the month.

There was no major safety related maintenance performed during the month.

l

),

4 OPERATING DATA REPORT DOCKET NO. 50-364 DATE April 4,1997 COMPLETED BY M. W. McAnuity _

TELEPHONE (334) 899-5156, ext.3640 OPERATING. STATUS I Unit Name:

1. Joseph M. Farley - Unit 2 Notes
2. Reporting Period: March 1997 1) Cumulative data since 07-30-81,
3. Licensed Thermal Power (MWt): 2,652 date ofcommercial operation.

, 4. Nameplate Rating (Gross MWe): 860 l

5. Design Electrical Rating (Net MWe): 829
6. Maximum Dependable Capacity (Gross MWe): 863.6
7. Maximum Dependable Capacity (Net MWe): 822
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Smce Last Report, Give Reasons: N/A
9. Power Level To Which Restricted, If Any (Net MWe): N/A  !
10. Reasons For Restrictions,If Any: N/A

?

, l This Month Yr. to Date Cumulative  !

11. Hours in Reporting Period 744.0 2,160.0 137,377.0  ;
12. Number Of Hours Reactor Was Critical 744.0 2,160.0 118,277.0 )
13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0 4
14. Hours Generator On-line 744.0 2,160.0 116,530.9
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1,973,088.0 5,634,518.8 297,082,613.0 j 4
17. Gross Electr cal Energy Generated (MWH) 653,582.0 1,872,212.0 97,386,510.0 '
18. Net Electrical Energy Generated (MWH) 623,300.0 1,784,354.0_ 92,334,810.0
19. Unit Service Factor 100.0 100.0 84.8
20. Unit Availability Factor 100.0 100.0 84.8
21. Unit Capacity Factor (Using MDC Net) 101.9 100.5 81.9
22. Unit Capacity Factor (Using DER Net) 101.1 99.6 81.1
23. Unit Forced Outage Rate 0.0_ 0.0 3.7 j
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

i

' 25. If Shut Down at End Of Report Period, Estimated Date of Startup: N/A

26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved Initial Criticality 05/06/81 05/08/81 Initial Electricity 05/24/81 05/25/81 Commercial Operation 08/01/81 07/30/81

DOCKET NO. 50-364

, , UNIT 2 DATE April 4,1997 COMPLETED BY M. W. McAnulty TELEPHONE (334) 899-5156 ext 3640 MONTH March DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net)

I 1 831 17 843 2 833 18 838 ,

l 3 833 19 837 4 838 20 836 5 834 21 837 I 6 844 22 837 ,

j 7 846 23 843 8 843 24 840 i

9 840 25 834  :

10 837 26 834 11 835 27 839 12 840 28 834 13 _

833 29 831 14 834 30 833 15 844 31 845 16 846 INSTRUCTIONS j On this format, list the average daily unit power level in MWe-Net for each day in the l reporting period. Compute to the nearest whole megawatt.

4 UNIT SHUTDOWNS AND POWER REDUCTIONS i d DOCKET NO. 50-364

UNIT NAME J. M. Farley - Unit 2 DATE April 4,1997 i
COMPLETED BY M. W. McAnuity

. REPORT MONTH March TELEPHONE (334)899-5156, ext.3640

}

R M E E S

, :T A T Y '

) Y S 11 SC y

P O O TO CAUSE AND CORRECTIVE  ;

E DURATION N D ED COMPONENT ACTION TO NO. DATE (1) (llOURS) (2) (3) LER # ME CODE (5) FREVENT RECURRENCE

'There were nO shutdowns Or power reductions during the month.

t

)

l 1: 2: 3: EVENTS REPORTED F; Forced Reason Method INVOLVE A S: Scheduled A Equipment Failure (Explain) 1 Manual GREATER TilAN 20%

B Maintenance or Test ' 2 Manual Scram REDUCTION !N C Refueling 3 Automatic Scram AVERAGE DAILY D Regulatory Restriction 4 Other(Explain) POWER LEVEL FOR E Operator Training & License Examination Tile PRECEDING 24 F- Administrative llOURS.

O - Operational Error (Explain)

II .Other (Explain) r _. - __ _

,y ,-,w