Dave M: rey SIuthern Nucl:ar Vice President Op: rating Company Farley Project P0. Box 1295 Ermingham. Alabama 35201 Tel 205.992.5131 k
SOUTHERN h COMPANY Ayrt1 9, 1997 Energy to Serve hur%rld" Docket Nos.
50-348 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D C 20555 Joseph M. Farley Nuclear Plant Monthly Or, crating Report Ladies and Gentlemen:
Attached are the March 199_7 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2, as required by Section 6.9.1.10 of the Technical Specifications.
If you have any questions, please advise.
Respectfully submitted, h ho i
w Dave Morey RWC:(mor) h Attachments cc:
Mr. L. A. Reyes, Region II Administrator Mr. J. I. Zimmerman, NRR Project Manager Mr. T..M. Ross, FNP Sr. Resident inspector 150154 9704160016 970331 PDR ADOCK 05000348 R
PDR N4
. N, Ih.@!N
4 Joseph M. Farley Nuclear Plant Unit 1 Narrative Summary of Operations March 1997 The unit was taken offline at 0030 on March 15,1997, for the fourteenth refueling outage.
The following maintenance was associated with outage activities:
- 1. The reactor was defueled. Visual inspection of the fuel was performed during the offload. Fuel oxide thickness measurements were taken and Rod Control Cluster Assembly (RCCA) eddy current testing was 1
performed for wear measurements.
P
OPERATING DATA REPORT DOCKET NO.
50-348 DATE April 4,1997 COMPLETED BY M. W. McAnulty TELEPilONE (334) 899-5156, ext.3640 F
OPERATINGJSTATUS 1.
Unit Name:
Joseph M. Farley - Unit 1 Notes 2.
Reporting Period:
March 1997
- 1) Cumulative data since 12-01-77, 3.
Licensed Thermal Power (MWt):
2,652 date of commercial operation.
4.
Nameplate Rating (Gross MWe):
860 5.
Design Electrical Rating (Net MWe):
829 6.
Maximum Dependable Capacity (Gross MWe):
866 7.
Maximum Dependable Capacity (Net MWe):
822 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Smce Last Report, Give Reasons:
N/A 9.
Power Level To Which Restricted, If Any (Net MWe):
N/A
- 10. Reasons For Restrictions,If Any:
N/A This Month Yr. to Date Cumulative
- 11. Hours in Reporting Period 744.0 2,160.0 169,464.0
- 12. Number Of Hours Reactor Was Critical 336.6 1,752.6 137,197.3
- 13. Reactor Reserve Shutdown Hours 336.5 1,752.5_
135,168.2 0.0 0.0 3_,650.0
- 14. Hours Generator On-line
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 887,754.4 4,511,632.6 348,230,639.0
- 17. Gross Electrical Energy Generated (MWH) 288,602.0 1,474,852.0 112,486,430.0
- 18. Net Electrical Energy Generated (MWH) 269,756.0 1,395,092.0 106,277,048.0
- 19. Unit Service Factor 45.2 81.1 79.8
- 20. Unit Availability Factor 45.2 81.1 79.8_
- 21. Unit Capacity Factor (Using MDC Net) 44.1 78.6 77.0
- 22. Unit Capacity Factor (Using DER Net) 43.7 77.9 75.6
- 23. Unit Forced Outage Rate 0.0 0.0 5.5
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
l
- 25. If Shut Down at End Of Report Period, Estimated Date of Startup:
05/09/97
- 26. Units In Test Status (Prior To Commercial Operation):
Forecast Achieved Initial Criticality 08/06/77 08/09/77 Initial Electricity 08/20/77 08/18/77 Commercial Operation 12/01/77 12/01/7',
l DOCKET NO.
50-348 UNIT _
1 DATE April 4,1997 COMPLETED BY M. W. McAnulty TELEPHONE (334) 899-5156 ext 3640 t
MONT11 March DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL j
(MWe-Net)
(MWe-Net) 1 818 17 0
2 818 18 0
3 818 19 0
4 822 20 0
5 817 21 0
6 826 22 0
7 829 23 0
8 824 24 0
9 822 25 0
10 819 26 0
11 815 27 0
12 822 28 0
13 820 29 0
14 753 30 0
15 0
31 0
16 0
INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.
I
UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-348 UNIT NAME J. M. Farley - Unit 1 DATE April 4,1997 COMPLETED BY M. W. McAnulty REPORT MONT11 March TELEPflONE (334) 899-5156, ext.3640 r=-
R M
E E
S T
A T
Y Y
S II SC P
O O
TO CAUSE AND CORRECTIVE E
DURATION N
D FD COMPONENT ACTION TO NO.
DATE (1)
(IIOURS)
(2)
(3)
LER #
ME CODE (5)
PREVENT RECURRENCE
~
~
l002 970315 S
407.5 C
1 N/A N/A N/A l At 0030, On 970315, the unit waS taken OfflInd for the fourteenth refueling Outage.
1 I
_ _J l:
2:
3:
EVENTS REPORTED F: Forced Reason Method INVOLVE A S: Scheduled A. Equipment Failure (Explain) 1 - Manual GREATER TilAN 20%
B - Maintenance or Test 2 ManualScram REDUCTION IN C - Refueling 3 Automatic Scram AVERAGE DAILY D - Regulatory Restriction 4 - Other (Explain)
POWER LEVEL FOR E. Operator Training & License Examination Tile PRECEDING 24 F Administrative llOURS.
G - Operational Error (Explain) 11 - Other (Explain)
._.m t
4 Joseph M. Farley Nuclear Plant Unit 2 i
Narrative Summary of Operations i
March 1997 i
There were no unit shutdowns or power reductions during the month.
There was no major safety related maintenance performed during the month.
)
4 OPERATING DATA REPORT DOCKET NO.
50-364 DATE April 4,1997 COMPLETED BY M. W. McAnuity _
TELEPHONE (334) 899-5156, ext.3640 OPERATING. STATUS I
1.
Unit Name:
Joseph M. Farley - Unit 2 Notes 2.
Reporting Period:
March 1997
- 1) Cumulative data since 07-30-81, 3.
Licensed Thermal Power (MWt):
2,652 date ofcommercial operation.
4.
Nameplate Rating (Gross MWe):
860 5.
Design Electrical Rating (Net MWe):
829 6.
Maximum Dependable Capacity (Gross MWe):
863.6 7.
Maximum Dependable Capacity (Net MWe):
822 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Smce Last Report, Give Reasons:
N/A 9.
Power Level To Which Restricted, If Any (Net MWe):
N/A
- 10. Reasons For Restrictions,If Any:
N/A
?
This Month Yr. to Date Cumulative
- 11. Hours in Reporting Period 744.0 2,160.0 137,377.0
- 12. Number Of Hours Reactor Was Critical 744.0 2,160.0 118,277.0
)
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0
- 14. Hours Generator On-line 744.0 2,160.0 116,530.9 4
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1,973,088.0 5,634,518.8 297,082,613.0 j
- 17. Gross Electr cal Energy Generated (MWH) 653,582.0 1,872,212.0 97,386,510.0 4
- 18. Net Electrical Energy Generated (MWH) 623,300.0 1,784,354.0_
92,334,810.0
- 19. Unit Service Factor 100.0 100.0 84.8
- 20. Unit Availability Factor 100.0 100.0 84.8
- 21. Unit Capacity Factor (Using MDC Net) 101.9 100.5 81.9
- 22. Unit Capacity Factor (Using DER Net) 101.1 99.6 81.1
- 23. Unit Forced Outage Rate 0.0_
0.0 3.7 j
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
i
' 25. If Shut Down at End Of Report Period, Estimated Date of Startup:
N/A
- 26. Units In Test Status (Prior To Commercial Operation):
Forecast Achieved Initial Criticality 05/06/81 05/08/81 Initial Electricity 05/24/81 05/25/81 Commercial Operation 08/01/81 07/30/81
DOCKET NO.
50-364 UNIT 2
DATE April 4,1997 COMPLETED BY M. W. McAnulty TELEPHONE (334) 899-5156 ext 3640 MONTH March DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 831 17 843 2
833 18 838 3
833 19 837 4
838 20 836 5
834 21 837 I
6 844 22 837 j
7 846 23 843 8
843 24 840 9
840 25 834 10 837 26 834 11 835 27 839 12 840 28 834 13 833 29 831 14 834 30 833 15 844 31 845 16 846 INSTRUCTIONS j
On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.
4 UNIT SHUTDOWNS AND POWER REDUCTIONS i
d DOCKET NO.
50-364 UNIT NAME J. M. Farley - Unit 2 DATE April 4,1997 i
COMPLETED BY M. W. McAnuity
. REPORT MONTH March TELEPHONE (334)899-5156, ext.3640
}
R M
E E
S
- T A
T Y
)
Y S
11 SC y
P O
O TO CAUSE AND CORRECTIVE E
DURATION N
D ED COMPONENT ACTION TO NO.
DATE (1)
(llOURS)
(2)
(3)
LER #
ME CODE (5)
FREVENT RECURRENCE
'There were nO shutdowns Or power reductions during the month.
t
)
1:
2:
3:
EVENTS REPORTED F; Forced Reason Method INVOLVE A S: Scheduled A Equipment Failure (Explain) 1 Manual GREATER TilAN 20%
B Maintenance or Test
' 2 Manual Scram REDUCTION !N C Refueling 3 Automatic Scram AVERAGE DAILY D Regulatory Restriction 4 Other(Explain)
POWER LEVEL FOR E Operator Training & License Examination Tile PRECEDING 24 F-Administrative llOURS.
O - Operational Error (Explain)
II.Other (Explain) r
,y
,-,w