Monthly Operating Repts for Dec 1997 for Jm Farley Nuclear Plant,Units 1 & 2
ML20198L619
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 12/31/1997
From: Mcanulty M, Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-97-02, GL-97-2, NUDOCS 9801160073
Download: ML20198L619 (5)


Text

-_

  • ~

Dave Morey Southern Nuclear

%ce President :

Operating Company Iarley Preject P.O. Box 1295 Birmingt ant Alatama 35201 i

Tel 205 992.5131 January 12, 1998 co.M E -

Energy to Serve Your%rld" Docket Nos.

50-348 50-364 U. S. Nuclear Regulatory Commission A*ITN: Document Control Desk Washington, D C 20555 Joseph M. Faricy Nu:Icar Plant Monthly Operatinn Report Ladies and Gentlemen:

Enclosed are the December 1997 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2, as required by Section 6.9.1.10 of the Technical Specifications. 'Dic content and format of this submittal has been revised n accordance with NRC Generic Letter 97-02, " Revised l

Contents of the Monthly Operating Report", dated May 15,1997.

If you have any questions, please advise.

Respectfully submitted,

[Al lNs s s

Dave Morey RWC:(mor)

Enclosures

.1. December Monthly Operating Report for Plant Farly Unit I f

g}

-Qt

2. December Monthly Operating Report for Plant Farley Unit 2

\\I cc: Mr. L. A. Reyes, Region 11 Administrator

- Mr. J. I. Zimmerman, NRR Project Manager

~ Mr. T.' M. Ross, FNP Sr. Resident Inspector 9901160073 971231 ~

PDR ADOCK 05000348-let semes's se its la is R

_,PDR i 5 llHlll l ll llll.1,l ll k

I l

OPERATING DATA REPORT DOCKET No.:

50-348 UNITNAME:

J. M. Farley - Unit 1 DATE:

January 5,1998 COMPLETED LY:

M. W. McAnulty TELEPiloNE:

J334)899 5156, ext.3640 OPERATlNG. STATUS 1.

Reporting Period:

December 1997 2.

Design Electrical Rating (Net MWe):

829 3.

Maximum Dependable Capacity (Net MWe):

822 This31onth YeatioEnte Cumulative 4,

Number OfIlours Reacior Was Critical:

744.0 6,836.9 142,281.0 5.

Ilours Gererator On line:

744.0 6,803.7 140,219.4 6.

Unit Reservo Shutdown llours:

0.0 0.0 0.0 7.

Net Electrical Energy Generated (MWil):

587,843.0 5,418,372.0 110,300,328.0 CilALLENGES TO PRESSURIZER PORY OR PRESSURIZER SAFETY VALVES Date i Tag No.

! Event Description There were no challenges to Pressurir.er PORV or Pressurizer Safety Valves.

El-1

UNIT SIIUTDOWNS DOCKET NO.:

50 348

)

UNIT NAME:

J. M. Farley - Unit i Ein:

January 5,1998 COMPLETED BY:

M. W. McAnulty REPORTING PERIODI December 1997 TELEPHONE:

(334) 899 5156, ext.3640 Type Method of F: Forced Duration Reason Shutting Down Cause/ Corrective Actions No.

Date S: Scheduled (llours)

(1)

(2)

Comments There were no unit shutdowns during the month.

EkhA50N.

(') MbilluD.

4 A. Equipment Feilwe (Explain)

I Manual II. Maintenance or Test 2 ManualTrip5 cram C. Refueling

3. Automatic Trip' Scram D. Regulatory Restriction
4. Cantinuation E. Operstw Training /Ucense Examination 5.Oder(Explain)

F. Administrative U. Operational Error (rsplain)

11. Other (F.xplain)

CAUSE/ CORRECTIVE ACTION / COMMENTS NARRATIVE REPORT At 1616 on 971212, with the unit operating at 100% reactor power, the unit was ramped to 15% reactor power to perform a chemistry flush of the steam generators. Flushing was completed and the unit was returned to 100% reactor power at 2355 on 971214.

l l

E10 o

l l-

OPERATING DAT A REPORT

+ **

DOCKET NO.:

50-364 UNIT NAME:

J. M. Farley - Unit 2 DATE:

January 5,1998 COMPLETED BY:

M. W. McAnulty TELEPHONE:

(334) 899-5156, ext.3640

- OPERATINGENIUS 1.

Reporting Period:

December 1997 2.

Design Electrical Rating (Net MWe):

E29 3.

Maximum Dependable Capacity (Net MWe):

822 This. Month Yeatto_Date Cumulative 4.

Number OfIlours Reactor Was Critical:

7441 8,760.0 124,877.0 5.

Ilours Generator On line:

744.0 8,760.0 123,130.9 6.

Unit Reserve Shutdown Hours:

0.0 0.0 0.0 7.

Net Electrical Energy Generated (MWII):

621,0i5.0 7,280,908.0 97,831,364.0 4

CIIALLENGES TO PRESSURIZER PORY OR PRESSURIZER SAFETY VALVES l

Date i Tag No.

I Event Description l

There were no challenrec to Pressurizer PORV or Pressurizer Safety Vah a E21

~

UNIT SHUTDOWNS DOCKET NO.:

50-364 UNIT NAME:

J. M. Farley - Unit 2 DATE:

hnuary 5,1998 COMPLETED BY:

M. W. McAnulty REPORTING PERIOD: December 1997 TELEPIIONE:

(334) 899-5156, ext.3640 Type Method of F Forced Duration Reason Shutting Dovm)

Cause/ Corrective Actions No.

Date l s: schedu'.4 (Hours)

(1)

(2) l Comments

~

There were no unit shutdowns during the month.

I

0) REASON.

(2) METHOD.

4. Equipment Failure (Explain) 1 Manual D. Msintenance or Test
2. Manual Trip' Scram C Refuelmg 3 AutomaticTrip$ cram D Regulatory Restriction 4 Contmuation E. Operstor Traming' License Examination 5 Other(Explain)

F. A*nimstrative O.Operatwnal Error (Explain)

!!. Other (Explam)

CAUSE/ CORRECTIVE ACTION / COMMENTS NARRATIVE REPORT At 0100 on 971227, with the unit operating at 100% reactor power, the unit was ramped to 60% reactor power to repair a steam leak on the 2A steam generator feed pump. The steam leak was repaired and the unit was returned to 100% reactor power at 0200 on 971228.