Dave Morey Southern Nuclear
%ce President :
Operating Company Iarley Preject P.O. Box 1295 Birmingt ant Alatama 35201 i
Tel 205 992.5131 January 12, 1998 co.M E -
Energy to Serve Your%rld" Docket Nos.
50-348 50-364 U. S. Nuclear Regulatory Commission A*ITN: Document Control Desk Washington, D C 20555 Joseph M. Faricy Nu:Icar Plant Monthly Operatinn Report Ladies and Gentlemen:
Enclosed are the December 1997 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2, as required by Section 6.9.1.10 of the Technical Specifications. 'Dic content and format of this submittal has been revised n accordance with NRC Generic Letter 97-02, " Revised l
Contents of the Monthly Operating Report", dated May 15,1997.
If you have any questions, please advise.
Respectfully submitted,
[Al lNs s s
Dave Morey RWC:(mor)
Enclosures
.1. December Monthly Operating Report for Plant Farly Unit I f
g}
-Qt
- 2. December Monthly Operating Report for Plant Farley Unit 2
\\I cc: Mr. L. A. Reyes, Region 11 Administrator
- Mr. J. I. Zimmerman, NRR Project Manager
~ Mr. T.' M. Ross, FNP Sr. Resident Inspector 9901160073 971231 ~
PDR ADOCK 05000348-let semes's se its la is R
_,PDR i 5 llHlll l ll llll.1,l ll k
I l
OPERATING DATA REPORT DOCKET No.:
50-348 UNITNAME:
J. M. Farley - Unit 1 DATE:
January 5,1998 COMPLETED LY:
M. W. McAnulty TELEPiloNE:
J334)899 5156, ext.3640 OPERATlNG. STATUS 1.
Reporting Period:
December 1997 2.
Design Electrical Rating (Net MWe):
829 3.
Maximum Dependable Capacity (Net MWe):
822 This31onth YeatioEnte Cumulative 4,
Number OfIlours Reacior Was Critical:
744.0 6,836.9 142,281.0 5.
Ilours Gererator On line:
744.0 6,803.7 140,219.4 6.
Unit Reservo Shutdown llours:
0.0 0.0 0.0 7.
Net Electrical Energy Generated (MWil):
587,843.0 5,418,372.0 110,300,328.0 CilALLENGES TO PRESSURIZER PORY OR PRESSURIZER SAFETY VALVES Date i Tag No.
! Event Description There were no challenges to Pressurir.er PORV or Pressurizer Safety Valves.
El-1
UNIT SIIUTDOWNS DOCKET NO.:
50 348
)
UNIT NAME:
J. M. Farley - Unit i Ein:
January 5,1998 COMPLETED BY:
M. W. McAnulty REPORTING PERIODI December 1997 TELEPHONE:
(334) 899 5156, ext.3640 Type Method of F: Forced Duration Reason Shutting Down Cause/ Corrective Actions No.
Date S: Scheduled (llours)
(1)
(2)
Comments There were no unit shutdowns during the month.
EkhA50N.
(') MbilluD.
4 A. Equipment Feilwe (Explain)
I Manual II. Maintenance or Test 2 ManualTrip5 cram C. Refueling
- 3. Automatic Trip' Scram D. Regulatory Restriction
- 4. Cantinuation E. Operstw Training /Ucense Examination 5.Oder(Explain)
F. Administrative U. Operational Error (rsplain)
- 11. Other (F.xplain)
CAUSE/ CORRECTIVE ACTION / COMMENTS NARRATIVE REPORT At 1616 on 971212, with the unit operating at 100% reactor power, the unit was ramped to 15% reactor power to perform a chemistry flush of the steam generators. Flushing was completed and the unit was returned to 100% reactor power at 2355 on 971214.
l l
E10 o
l l-
OPERATING DAT A REPORT
+ **
DOCKET NO.:
50-364 UNIT NAME:
J. M. Farley - Unit 2 DATE:
January 5,1998 COMPLETED BY:
M. W. McAnulty TELEPHONE:
(334) 899-5156, ext.3640
- OPERATINGENIUS 1.
Reporting Period:
December 1997 2.
Design Electrical Rating (Net MWe):
E29 3.
Maximum Dependable Capacity (Net MWe):
822 This. Month Yeatto_Date Cumulative 4.
Number OfIlours Reactor Was Critical:
7441 8,760.0 124,877.0 5.
Ilours Generator On line:
744.0 8,760.0 123,130.9 6.
Unit Reserve Shutdown Hours:
0.0 0.0 0.0 7.
Net Electrical Energy Generated (MWII):
621,0i5.0 7,280,908.0 97,831,364.0 4
CIIALLENGES TO PRESSURIZER PORY OR PRESSURIZER SAFETY VALVES l
Date i Tag No.
I Event Description l
There were no challenrec to Pressurizer PORV or Pressurizer Safety Vah a E21
~
UNIT SHUTDOWNS DOCKET NO.:
50-364 UNIT NAME:
J. M. Farley - Unit 2 DATE:
hnuary 5,1998 COMPLETED BY:
M. W. McAnulty REPORTING PERIOD: December 1997 TELEPIIONE:
(334) 899-5156, ext.3640 Type Method of F Forced Duration Reason Shutting Dovm)
Cause/ Corrective Actions No.
Date l s: schedu'.4 (Hours)
(1)
(2) l Comments
~
There were no unit shutdowns during the month.
I
- 0) REASON.
(2) METHOD.
- 4. Equipment Failure (Explain) 1 Manual D. Msintenance or Test
- 2. Manual Trip' Scram C Refuelmg 3 AutomaticTrip$ cram D Regulatory Restriction 4 Contmuation E. Operstor Traming' License Examination 5 Other(Explain)
F. A*nimstrative O.Operatwnal Error (Explain)
!!. Other (Explam)
CAUSE/ CORRECTIVE ACTION / COMMENTS NARRATIVE REPORT At 0100 on 971227, with the unit operating at 100% reactor power, the unit was ramped to 60% reactor power to repair a steam leak on the 2A steam generator feed pump. The steam leak was repaired and the unit was returned to 100% reactor power at 0200 on 971228.