Monthly Operating Repts for Dec 1997 for Jm Farley Nuclear Plant,Units 1 & 2
ML20198L619
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 12/31/1997
From: Mcanulty M, Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-97-02, GL-97-2, NUDOCS 9801160073
Download: ML20198L619 (5)


Text

-_ _

  • ~

Dave Morey Southern Nuclear

, ,, %ce President : Operating Company Iarley Preject P.O. Box 1295 Birmingt ant Alatama 35201 i

Tel 205 992.5131 January 12, 1998 E

co.M-Energy to Serve Your%rld" Docket Nos. 50-348 50-364 U. S. Nuclear Regulatory Commission A*ITN: Document Control Desk ,

Washington, D C 20555 Joseph M. Faricy Nu:Icar Plant Monthly Operatinn Report Ladies and Gentlemen:

Enclosed are the December 1997 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2, as required by Section 6.9.1.10 of the Technical Specifications. 'Dic content and format of this submittal has been revised n accordance with NRC Generic Letter 97-02, " Revised l Contents of the Monthly Operating Report", dated May 15,1997.

If you have any questions, please advise.

Respectfully submitted,

[Al lNs ss Dave Morey RWC:(mor)

Enclosures

.1. December Monthly Operating Report for Plant Farly Unit I f

2. December Monthly Operating Report for Plant Farley Unit 2 g} -Qt \I
  • cc: Mr. L. A. Reyes, Region 11 Administrator

- Mr. J. I. Zimmerman, NRR Project Manager ,

~ Mr. T.' M. Ross, FNP Sr. Resident Inspector 9901160073 971231 ~

PDR ADOCK 05000348- let semes's se its la is R _,PDR i 5 llHlll ll

, , , l,,

llll .1,l ll k

I l

OPERATING DATA REPORT DOCKET No.: 50-348 UNITNAME: J. M. Farley - Unit 1 DATE: January 5,1998 COMPLETED LY: M. W. McAnulty TELEPiloNE: J334)899 5156, ext.3640 OPERATlNG. STATUS

1. Reporting Period: December 1997
2. Design Electrical Rating (Net MWe): 829
3. Maximum Dependable Capacity (Net MWe): 822 This31onth YeatioEnte Cumulative 4, Number OfIlours Reacior Was Critical: 744.0 6,836.9 142,281.0
5. Ilours Gererator On line: 744.0 6,803.7 140,219.4
6. Unit Reservo Shutdown llours: 0.0 0.0 _

0.0

7. Net Electrical Energy Generated (MWil): 587,843.0 5,418,372.0 110,300,328.0 CilALLENGES TO PRESSURIZER PORY OR PRESSURIZER SAFETY VALVES Date i Tag No.  ! Event Description There were no challenges to Pressurir.er PORV or Pressurizer Safety Valves.

El-1

UNIT SIIUTDOWNS DOCKET NO.: 50 348 )

UNIT NAME: J. M. Farley - Unit i Ein: January 5,1998 COMPLETED BY: M. W. McAnulty REPORTING PERIODI December 1997 TELEPHONE: (334) 899 5156, ext.3640 Type Method of l F: Forced Duration Reason Shutting Down Cause/ Corrective Actions No. Date S: Scheduled (llours) (1) , (2) Comments There were no unit shutdowns during the month.

EkhA50N. (')

4 MbilluD.

A. Equipment Feilwe (Explain) I Manual II . Maintenance or Test 2 ManualTrip5 cram C . Refueling 3. Automatic Trip' Scram D . Regulatory Restriction 4. Cantinuation E . Operstw Training /Ucense Examination 5.Oder(Explain)

F. Administrative U. Operational Error (rsplain)

11. Other (F.xplain)

CAUSE/ CORRECTIVE ACTION / COMMENTS NARRATIVE REPORT At 1616 on 971212, with the unit operating at 100% reactor power, the unit was ramped to 15% reactor power to perform a chemistry flush of the steam generators. Flushing was completed and the unit was returned to 100% reactor power at 2355 on 971214.

l l

E10 o

l l-

l

+ ** OPERATING DAT A REPORT DOCKET NO.: 50-364 UNIT NAME: J. M. Farley - Unit 2 DATE: January 5,1998 COMPLETED BY: M. W. McAnulty TELEPHONE: (334) 899-5156, ext.3640

- OPERATINGENIUS

1. Reporting Period: December 1997
2. Design Electrical Rating (Net MWe): E29
3. Maximum Dependable Capacity (Net MWe): 822 This. Month Yeatto_Date Cumulative
4. Number OfIlours Reactor Was Critical: 7441 8,760.0 124,877.0
5. Ilours Generator On line: 744.0 8,760.0 123,130.9
6. Unit Reserve Shutdown Hours: 0.0 0.0 0.0
7. Net Electrical Energy Generated (MWII): 621,0i5.0 7,280,908.0 97,831,364.0 4

CIIALLENGES TO PRESSURIZER PORY OR PRESSURIZER SAFETY VALVES Date i Tag No. I Event Description _

l l

There were no challenrec to Pressurizer PORV or Pressurizer Safety Vah a E21

' ~

. - UNIT SHUTDOWNS DOCKET NO.: 50-364 UNIT NAME: J. M. Farley - Unit 2 DATE: hnuary 5,1998 COMPLETED BY: M. W. McAnulty REPORTING PERIOD: December 1997 TELEPIIONE: (334) 899-5156, ext.3640 Type Method of F Forced Duration Reason Shutting Dovm) Cause/ Corrective Actions No. (1) (2) Comments  ;

Date l s: schedu'.4 (Hours) ~

l There were no unit shutdowns during the month.

I

0) REASON. (2) METHOD.
4. Equipment Failure (Explain) 1 Manual D . Msintenance or Test 2. Manual Trip' Scram C Refuelmg 3 AutomaticTrip$ cram D Regulatory Restriction 4 Contmuation E . Operstor Traming' License Examination 5 Other(Explain)

F. A*nimstrative O .Operatwnal Error (Explain)

!! . Other (Explam)

CAUSE/ CORRECTIVE ACTION / COMMENTS NARRATIVE REPORT At 0100 on 971227, with the unit operating at 100% reactor power, the unit was ramped to 60% reactor power to repair a steam leak on the 2A steam generator feed pump. The steam leak was repaired and the unit was returned to 100% reactor power at 0200 on 971228.

E2 2 i

l l

-. - - . - . , , - - --