ML20198B256

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Nov 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With
ML20198B256
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 11/30/1998
From: Curlington A, Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9812180123
Download: ML20198B256 (5)


Text

-_. . . - _ . . - . . _

' ~ "

Dave Morey ~- ' Southern Nucl:ar Vice President Operating Company Farley Project R0. Box 1295 '

, Birmingham. Alabama 35201 I

Tel 205 992.5131 l .

SOUTHERN h j rw 10,1998 MMME Energy to Serve nurWorld'"

Docket Nos. 50-348 50-364 ,

U. S. Nuclear Regulatory Commission A'ITN: Document Control Desk

- Washington, D C 20555 Joseph M. Farley Nuclear Plant Monthly Operating Report Ladies and Gentlemen:

Enclosed are the November 1998 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2,'as required by Section 6.9.1.10 of the Technical Speedications.

If you have any questions, please' advise.

Respectfully submitted, a

f ]lk(M Dave Morey RWC:(mor)

Enclosures E1 - November Monthly Operating Report for Plant Farley Unit 1 E2 ;- November Monthly Operating Report for Plant Farley Unit 2 cc: ' Mr. L. A. Reyes, Region II Administrator Mr. J.1. Zimmerman, NRR Project Manager

{)

Mr.T. P.' Johnson, FNP Sr. Resident Inspector t

(

4{,-

9812180123 981130 I" f'DR ADOCK 05000348 R pop 9 L

~~

.. OPERATING DATA REPORT DOCKET NO.: 50-348 I UNIT NAME: J. M. Farley_- Unit 1 DATE: December 4,1998 COMPLETED BY: A.11. Curling <on TELEPilONE: (334) 794-6431 ext. 3399 i

l OPERATINGETATUS l

1. Reporting Period: NOVEMBER 1998
2. Design Electrical Rating (Net MWe): 829
3. Maximum Dependable Capacity (Net MWe): 822 l

1 l

ThiaMonth Year _tuDate Cumulative  !

4. Number Of Hours Reactor Was Critical: ' O.0 6,507.3 148,788.9 i
5. Hours Generator On-line: ~

0.0 6,470.2 146,689.6 l

6. Unit Reserve Shutdown Hours: 0.0 0.0 0.0 i

' 7. Net Electrical Energy Generated (MWH): 0.0 5,224,403.0 115,524,731F i

CHALLENGES TO PRESSURIZER PORY OR PRESSURIZER SAFETY VALVES Date i lag No. I hvent Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.

El-1 l

i

i

. UNIT SHUTDOWNS i

DOCKET NO.: 50-348 UNIT NAME: J. M. Farley - Unit I  ;

, DATE: December 4,1998 ,

COMPLETED BY: A. H. Curlington REPORTING PERIOD: NOYEMBElt1998 TELEPIIONE: (334) 794-6431 ext. 3399 Type Method of I '

F: Forced Duration Reason Shutting Down Cause/ Corrective Actions ,

No. Date S: Scheduled (Hours) (1) (2) Comments 3- 981017 S 720 C 1 The fifteenth refueling outage  ;

continued from 981017.

l

.r L

(1) KLASUN (2) ML i t TVD.

A Equipment failure (Explain) 1 - Manual i3 Maintenance or Test 2 ManualTrip/ Scram C Rcfueling 3 - Automatic Trip / Scram

' D Regulatory Restriction 4 Continuation E - operator Training / License Examination 5 other(Explain)

F Administrative o operationalError(Explain) 11 other(Explain)

CAUSE/ CORRECTIVE ACTION / COMMENTS NARRATIVE REPORT The following refueling outage activities are in progress or complete:

1) Steam Genemtor eddy current testing and sleeving complete
2) Baffle former bolt inspection and replacement in progress
3) Power uprate design change in progress Normal refueling outage activities continting.

El-2

e .: -

OPERATING DATA REPORT DOCKET NO.: 50-364 UNIT NAME: _J. M. Farley - Unit 2

. DATE: December 4,1998 COMPLETED BY: A. H. Curlington

'I ELEPilONE: _{334) 794-6431 ext. 3399 OPERATING. STATUS

1. . Reporting Period: NOVEMBER 1998
2. Design Electrical Rating (Net MWe): 829

- 3. Maximum Dependable Capacity (Net MWe): , 852 ThisMonth Yeatfo.Date Cumulative

4. Number Of Hours Reactor Was Critical: 720.0 _ 6,807.4 131,724.4 5 ~ Hours Generator On-line: _

720.0 6,770.5 129,901.4

6. Unit Reserve Shutdown Hours: 0.0 0.0 0.0
7. Net Electrical Energy Generated (MWH): __ 606,474.0 5,626,952.0 103,458,316.0 CIIALLENGES TO PRESSURIZER PORV OR PRESSURIZER SAFETY VALVES Date i l'ag No. I Event Desenpuon There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.

1 l

t E2-1

, i

- *6 ' " UNIT SHUTDOWNS DOCKET NO.: 50 364 UNIT NAME: J. M. Farley - (Jnit 2

. DATE: December 4,1998 COMPLETED BY: A. H. Curlington REPORTING PERIOD: NOVEMBERJ998 TELEPHONE: (334) 794-6431 ext. 3399 Type Method of

. ' F: Forced Duration Reason Shutting Down Cause/ Corrective Actions No. Date - s: scheduled (Ilours) (1) (2) Comments

~ There were no unit shutdowns during the month.

s d

0) KLAduN. u) MLiliva

' A Equipment Failure (Explain) 1 - Manual D MaintenanceorTest 2. Manual Trip / Scram C. Refueling 3. Automatic Trip / Scram D. Regulatory Restriction 4. Continuation E . operator Training / License Examination 5.other (Explain)

[ F. Administrative 8'

O. Operational Error (Explain)

I1.Other(Explain)

, CAUSE/ CORRECTIVE ACTION / COMMENTS

' NARRATIVE REPORT At 0002 on 931115, with the unit operating at 100% reactor power, the unit was ramped to 15% reactor power to investigate a low level alarm on 2A RCP upper oil reservoir. Oil was added to the upper reservior, the alarm was cleared, and the unit was returned to 100% power at 0509 on 981116.

E2-2