Monthly Operating Repts for Nov 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With
ML20198B256
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 11/30/1998
From: Curlington A, Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9812180123
Download: ML20198B256 (5)


Text

-_.

' ~

Dave Morey ~-

' Southern Nucl:ar Vice President Operating Company Farley Project R0. Box 1295 '

Birmingham. Alabama 35201 I

Tel 205 992.5131 l

SOUTHERN h j

rw 10,1998 MMME Energy to Serve nurWorld'"

Docket Nos.

50-348 50-364 U. S. Nuclear Regulatory Commission A'ITN: Document Control Desk

- Washington, D C 20555 Joseph M. Farley Nuclear Plant Monthly Operating Report Ladies and Gentlemen:

Enclosed are the November 1998 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2,'as required by Section 6.9.1.10 of the Technical Speedications.

If you have any questions, please' advise.

Respectfully submitted, a

f ]lk(M Dave Morey RWC:(mor)

Enclosures E1 - November Monthly Operating Report for Plant Farley Unit 1 E2 ;- November Monthly Operating Report for Plant Farley Unit 2 cc: ' Mr. L. A. Reyes, Region II Administrator

{

Mr. J.1. Zimmerman, NRR Project Manager

)

t Mr.T. P.' Johnson, FNP Sr. Resident Inspector

(

4{,-

9812180123 981130 I"

f'DR ADOCK 05000348 R

pop 9 L

~~

OPERATING DATA REPORT DOCKET NO.:

50-348 UNIT NAME:

J. M. Farley_- Unit 1 DATE:

December 4,1998 COMPLETED BY:

A.11. Curling <on TELEPilONE:

(334) 794-6431 ext. 3399 i

OPERATINGETATUS 1.

Reporting Period:

NOVEMBER 1998 2.

Design Electrical Rating (Net MWe):

829 3.

Maximum Dependable Capacity (Net MWe):

822 1

ThiaMonth Year _tuDate Cumulative 4.

Number Of Hours Reactor Was Critical:

' O.0 6,507.3 148,788.9 i

5.

Hours Generator On-line:

0.0 6,470.2 146,689.6 6.

Unit Reserve Shutdown Hours:

~

0.0 0.0 0.0

' 7.

Net Electrical Energy Generated (MWH):

0.0 5,224,403.0 115,524,731F i

CHALLENGES TO PRESSURIZER PORY OR PRESSURIZER SAFETY VALVES Date i lag No.

I hvent Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.

El-1 i

i UNIT SHUTDOWNS i

DOCKET NO.:

50-348 UNIT NAME:

J. M. Farley - Unit I DATE:

December 4,1998 COMPLETED BY:

A. H. Curlington REPORTING PERIOD: NOYEMBElt1998 TELEPIIONE:

(334) 794-6431 ext. 3399 Type Method of I F: Forced Duration Reason Shutting Down Cause/ Corrective Actions No.

Date S: Scheduled (Hours)

(1)

(2)

Comments 3-981017 S

720 C

1 The fifteenth refueling outage continued from 981017.

l

.r L

(1) KLASUN (2) ML i t TVD.

A Equipment failure (Explain) 1 - Manual i3 Maintenance or Test 2 ManualTrip/ Scram C Rcfueling 3 - Automatic Trip / Scram

' D Regulatory Restriction 4 Continuation E - operator Training / License Examination 5 other(Explain)

F Administrative o operationalError(Explain) 11 other(Explain)

CAUSE/ CORRECTIVE ACTION / COMMENTS NARRATIVE REPORT The following refueling outage activities are in progress or complete:

1) Steam Genemtor eddy current testing and sleeving complete
2) Baffle former bolt inspection and replacement in progress
3) Power uprate design change in progress Normal refueling outage activities continting.

El-2

e.: -

OPERATING DATA REPORT DOCKET NO.:

50-364 UNIT NAME:

_J. M. Farley - Unit 2 DATE:

December 4,1998 COMPLETED BY:

A. H. Curlington

'I ELEPilONE:

_{334) 794-6431 ext. 3399 OPERATING. STATUS

1.. Reporting Period:

NOVEMBER 1998 2.

Design Electrical Rating (Net MWe):

829

- 3.

Maximum Dependable Capacity (Net MWe):,

852 ThisMonth Yeatfo.Date Cumulative 4.

Number Of Hours Reactor Was Critical:

720.0

_ 6,807.4 131,724.4 5 ~ Hours Generator On-line:

720.0 6,770.5 129,901.4 6.

Unit Reserve Shutdown Hours:

__ 606,474.0 5,626,952.0 103,458,316.0 0.0 0.0 0.0 7.

Net Electrical Energy Generated (MWH):

CIIALLENGES TO PRESSURIZER PORV OR PRESSURIZER SAFETY VALVES Date i l'ag No.

I Event Desenpuon There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.

1 l

t E2-1 i

- *6 ' "

UNIT SHUTDOWNS DOCKET NO.:

50 364 UNIT NAME:

J. M. Farley - (Jnit 2 DATE:

December 4,1998 COMPLETED BY:

A. H. Curlington REPORTING PERIOD: NOVEMBERJ998 TELEPHONE:

(334) 794-6431 ext. 3399 Type Method of

' F: Forced Duration Reason Shutting Down Cause/ Corrective Actions No.

Date

- s: scheduled (Ilours)

(1)

(2)

Comments

~ There were no unit shutdowns during the month.

s d

0) KLAduN.

u) MLiliva

' A Equipment Failure (Explain) 1 - Manual D MaintenanceorTest

2. Manual Trip / Scram C. Refueling
3. Automatic Trip / Scram D. Regulatory Restriction
4. Continuation E. operator Training / License Examination 5.other (Explain)

[

F. Administrative 8'

O. Operational Error (Explain)

I1.Other(Explain)

CAUSE/ CORRECTIVE ACTION / COMMENTS

' NARRATIVE REPORT At 0002 on 931115, with the unit operating at 100% reactor power, the unit was ramped to 15% reactor power to investigate a low level alarm on 2A RCP upper oil reservoir. Oil was added to the upper reservior, the alarm was cleared, and the unit was returned to 100% power at 0509 on 981116.

E2-2