-_.
' ~
Dave Morey ~-
' Southern Nucl:ar Vice President Operating Company Farley Project R0. Box 1295 '
Birmingham. Alabama 35201 I
Tel 205 992.5131 l
SOUTHERN h j
rw 10,1998 MMME Energy to Serve nurWorld'"
Docket Nos.
50-348 50-364 U. S. Nuclear Regulatory Commission A'ITN: Document Control Desk
- Washington, D C 20555 Joseph M. Farley Nuclear Plant Monthly Operating Report Ladies and Gentlemen:
Enclosed are the November 1998 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2,'as required by Section 6.9.1.10 of the Technical Speedications.
If you have any questions, please' advise.
Respectfully submitted, a
f ]lk(M Dave Morey RWC:(mor)
Enclosures E1 - November Monthly Operating Report for Plant Farley Unit 1 E2 ;- November Monthly Operating Report for Plant Farley Unit 2 cc: ' Mr. L. A. Reyes, Region II Administrator
{
Mr. J.1. Zimmerman, NRR Project Manager
)
t Mr.T. P.' Johnson, FNP Sr. Resident Inspector
(
4{,-
9812180123 981130 I"
f'DR ADOCK 05000348 R
pop 9 L
~~
OPERATING DATA REPORT DOCKET NO.:
50-348 UNIT NAME:
J. M. Farley_- Unit 1 DATE:
December 4,1998 COMPLETED BY:
A.11. Curling <on TELEPilONE:
(334) 794-6431 ext. 3399 i
OPERATINGETATUS 1.
Reporting Period:
NOVEMBER 1998 2.
Design Electrical Rating (Net MWe):
829 3.
Maximum Dependable Capacity (Net MWe):
822 1
ThiaMonth Year _tuDate Cumulative 4.
Number Of Hours Reactor Was Critical:
' O.0 6,507.3 148,788.9 i
5.
Hours Generator On-line:
0.0 6,470.2 146,689.6 6.
Unit Reserve Shutdown Hours:
~
0.0 0.0 0.0
' 7.
Net Electrical Energy Generated (MWH):
0.0 5,224,403.0 115,524,731F i
CHALLENGES TO PRESSURIZER PORY OR PRESSURIZER SAFETY VALVES Date i lag No.
I hvent Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.
El-1 i
i UNIT SHUTDOWNS i
DOCKET NO.:
50-348 UNIT NAME:
J. M. Farley - Unit I DATE:
December 4,1998 COMPLETED BY:
A. H. Curlington REPORTING PERIOD: NOYEMBElt1998 TELEPIIONE:
(334) 794-6431 ext. 3399 Type Method of I F: Forced Duration Reason Shutting Down Cause/ Corrective Actions No.
Date S: Scheduled (Hours)
(1)
(2)
Comments 3-981017 S
720 C
1 The fifteenth refueling outage continued from 981017.
l
.r L
(1) KLASUN (2) ML i t TVD.
A Equipment failure (Explain) 1 - Manual i3 Maintenance or Test 2 ManualTrip/ Scram C Rcfueling 3 - Automatic Trip / Scram
' D Regulatory Restriction 4 Continuation E - operator Training / License Examination 5 other(Explain)
F Administrative o operationalError(Explain) 11 other(Explain)
CAUSE/ CORRECTIVE ACTION / COMMENTS NARRATIVE REPORT The following refueling outage activities are in progress or complete:
- 1) Steam Genemtor eddy current testing and sleeving complete
- 2) Baffle former bolt inspection and replacement in progress
- 3) Power uprate design change in progress Normal refueling outage activities continting.
El-2
e.: -
OPERATING DATA REPORT DOCKET NO.:
50-364 UNIT NAME:
_J. M. Farley - Unit 2 DATE:
December 4,1998 COMPLETED BY:
A. H. Curlington
'I ELEPilONE:
_{334) 794-6431 ext. 3399 OPERATING. STATUS
- 1.. Reporting Period:
NOVEMBER 1998 2.
Design Electrical Rating (Net MWe):
829
- 3.
Maximum Dependable Capacity (Net MWe):,
852 ThisMonth Yeatfo.Date Cumulative 4.
Number Of Hours Reactor Was Critical:
720.0
_ 6,807.4 131,724.4 5 ~ Hours Generator On-line:
720.0 6,770.5 129,901.4 6.
Unit Reserve Shutdown Hours:
__ 606,474.0 5,626,952.0 103,458,316.0 0.0 0.0 0.0 7.
Net Electrical Energy Generated (MWH):
CIIALLENGES TO PRESSURIZER PORV OR PRESSURIZER SAFETY VALVES Date i l'ag No.
I Event Desenpuon There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.
1 l
t E2-1 i
- *6 ' "
UNIT SHUTDOWNS DOCKET NO.:
50 364 UNIT NAME:
J. M. Farley - (Jnit 2 DATE:
December 4,1998 COMPLETED BY:
A. H. Curlington REPORTING PERIOD: NOVEMBERJ998 TELEPHONE:
(334) 794-6431 ext. 3399 Type Method of
' F: Forced Duration Reason Shutting Down Cause/ Corrective Actions No.
Date
- s: scheduled (Ilours)
(1)
(2)
Comments
~ There were no unit shutdowns during the month.
s d
- 0) KLAduN.
u) MLiliva
' A Equipment Failure (Explain) 1 - Manual D MaintenanceorTest
- 2. Manual Trip / Scram C. Refueling
- 3. Automatic Trip / Scram D. Regulatory Restriction
- 4. Continuation E. operator Training / License Examination 5.other (Explain)
[
F. Administrative 8'
O. Operational Error (Explain)
I1.Other(Explain)
CAUSE/ CORRECTIVE ACTION / COMMENTS
' NARRATIVE REPORT At 0002 on 931115, with the unit operating at 100% reactor power, the unit was ramped to 15% reactor power to investigate a low level alarm on 2A RCP upper oil reservoir. Oil was added to the upper reservior, the alarm was cleared, and the unit was returned to 100% power at 0509 on 981116.
E2-2