Southsrn Nucliar Op: fating Company

Post Offics Box 1295

Dirmingham. Alabama 35201 4 Telephons (205) 868-5131 o.ve morey Southern Nudear Operating Company Vice President Farley Project the Southem electnc System January 11, 1996 i

I l

Docket Nos. 50-348 50-364  ;

U. S. Nuclear Regulatory Commission l ATrN: Document Control Desk Washington, D.C. 20555 Joseph M. Farley Nuclear Plant Monthlv Ooerating Report Gentlemen:

Attached are the December 1995 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2, as required by Section 6.9.1.10 of the Technical Specifications.

If you have any questions, please advise.

Respectfully submitted,

[/ Nh Dave Morey RWC:(mor)

Attachments cc: Mr. S. D. Ebneter Mr. B. L. Siegel Mr. T. M. Ross j l

i l

17003~2 9601170115 951231 1 PDR ADOCK 05000348 R PDR [gg i

]

Il t

_. ..~ _ . _ . . .. . . . . . _ _ . . . . . . . . . . . _ . . . _ _ . . _ . . _ _ . . _ _ . . . _ _ _ . _ _ _ _ . _ . _ . _ _ . . _ . _ . _ _ .

Joseph M. Farley Nuclear Plant Unit 1 Narrative Summary of Operations

December 1995 There were no unit shutdowns or major power reductions during the month.

There was no major safety related maintenance performed during the month.

I i

., - - , + . -- ,4 , -- -,

..,, , -- -~,

. OPERATING DATA REPORT DOCKET NO. 50-348

, . DATE Janumy 8,1996 COMPLETED BY S. M. Allison TELEPHONE (334) 899-5156 ext. 3442 DPIRATlMGETATIIS

1. Unit Name: Joseph M. Farley - Unit 1 Notes
2. Reporting Period: December 1995 1) Cumulative data since 12-01-77,
3. Licensed Thermal Power (MWt)- '652

, date of commercial operation.

4. Nameplate Rating (Gross MWe): 860
5. Design Electrical Rating (Net MWe): 829
6. Maximum Dependable Capacity (Gross MWe): 855.7
7. Maximum Dependable Capacity (Net MWe): 812
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A
9. Power Level To Which Restricted, If Any (Net MWe): N/A
10. Reasons For Restrictions, If Any: N/A This Month Yr. to Date Cumulative
11. Hours in Reporting Period 744.0 8,760.0 158,520.0
12. Number Of Hours Reactor Was Critical 744.0 7,432.6 126,689.4
13. Reactor Reserve Shutdown Hours 0.0 0.0 3,650.0
14. Hours Generator On-line 744.0 7,221.8 124,675.7
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 l
16. Gross Thermal Energy Generated (MWH) 1,971,467.6 18,618,655.9 320,754,372.9 l
17. Gross Electrical Energy Generated (MWH) 653,175.0 6,078,449.0 103,492,154.0 l
18. Net Electrical Energy Generated (MWH) 621,409.0 5,739,663.0 97,739,652.0

{

19. Unit Service Factor 100.0 82.4 78.6 1
20. Unit Availability Factor 100.0 82.4 78.6 l
21. Unit Capacity Factor (Using MDC Net) 102.9 80.7 75.6 1
22. Unit Capacity Factor (Using DER Net) 100.8 79.0 74.4 {
23. Unit Forced Outage Rate 0.0 4.7 5.9 l
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): j N/A l
25. If Shut Down at End Of Report Period, Estimated Date of Startup: N/A
26. Units in Test Status (Prior To Commercial Operation): Forecast Achieved 3 Initial Criticality 08/06/77 08/09/77 Initial Electricity 08/20/77 08/l8/77 Commercial Operation 12/01/77 12/01/77 i i

, DOCKET NO. 50-348 UNIT 1 DATE January 8,1996 COMPLETED BY S.M. Allison TELEPHONE (334) 899-5156 ext. 3442 MONTH December DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 833 17 833 2 835 18 828 3 835 19 831 4- 831 20 838 5 829 21 _

841 6 829 22 841 7 833 23 840 8 837 24 840 9 838 _

25 840 10 841 26 840 11 840 27 839 12 838 28 836 13 837 29 822 14 834 30 836 15 833 31 833 16 832 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.

UNIT SHUTDOWNS AND POWER REDUCTIONS l

"

  • l DOCKET NO. 50-348 l UNIT NAME J. M. Farley - Unit 1 )

DATE January 8,1996 COMPLETED BY S. M. Allison REPORT MONTH December TELEPliONE (334) 899-5156, ext. 3442 I

=  !

R M E E S l T A T Y Y S H SC

]

P O O TO CAUSE AND CORRECTIVE E DURATION N D ED COMPONENT ACTION TO I NO. DATE (1) (llOURS) (2) (3) LER # ME CODE (,5) PREVENT RECURRENCE

]

i There were no shutdowns or power reductions during the month.

1 1: 2: 3: EVENTS REPORTED F: Forced Reason Method INVOLVE A S: Scheduled A - Equipment Failure (Explain) 1 Manual GREATER TilAN 20%

D - Maintenance or Test 2 - Manual Scram REDUCTION IN C . Refueling 3 - Automatic Scram AVERAGE DAILY D - Regulatory Restriction 4 - Other (Explain) POWER LEVEL. FOR E - Operator Training & License Examination Tile PRECEDING 24 F- Administrative llOURS.

O OperationalError(Explain) 11 Other(Explain)

_ _ . . - - . .~. . __ _ . . _ _ . . _ _ _ _ . _ _ _ _ . _ . _ . _ . . . _ _ ._ _.

4 Joseph M. Farley Nuclear Plant

, Unit 2  ;

Narrative Summary of Operations '

December 1995 t

E There were no unit shutdowns or major power reductions during the month.

i There was no major safety related maintenance performed during the month, l

l if i

l

. OPERATING DATA REPORT DOCKET NO. 50-364 DATE January 8,1996 COMPLETED BY S. M. Allison TELEPHONE (334) 899-5156 ext. 3442 DEERKfjNG STATUS

1. Unit Name: Joseph M. Farley - Unit 2 Notes
2. Reporting Period: December 1995_ 1) Cumulative data since 07-30-81,
3. Licensed Thermal Power (MWt): 2,652 date of commercial operation.
4. Nameplate Rating (Gross MWe): 860
5. Design Electrical Rating (Net MWe): 829
6. Maximum Dependable Capacity (Gross MWe): 863.6
7. Maximum Dependable Capacity (Net MWe): 822
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A
9. Power Level To Which Restricted, If Any (Net MWe): N/A
10. Reasons For Restrictions,If Any: N/A This Month Yr. to Date Cumulative
11. Hours in Reporting Period 744.0 8,760.0 126,433.0
12. Number Of Hours Reactor Was Critical 744.0 7,245.7 108,903.4
13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0 l
14. Hours Generator On-line 744.0 6,987.6 107,210.2
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1,939,487.2 16,634,084.7 272,973,790.4 ,
17. Gross Electrical Energy Generated (MWH) 643,805.0 5,407,937.0 89,462,479.0 l
18. Net Electrical Energy Generated (MWH) 613,417.0 5,091,353.0 84,813,651.0
19. Unit Service Factor 100.0 79.8 84.8
20. Unit Availability Factor 100.0 79.8 84.8
21. Unit Capacity Factor (Using MDC Net) 100.3 70.7 81.8
22. Unit Capacity Factor (Using DER Net) 99.5 70.1 80.9
23. Unit Forced Outage Rate 0.0 4.2 4.0
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A

25. If Shut Down at End Of Report Period, Estimated Date of Startup: N/A
26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved Initial Criticality 05/06/81 05/08/81 Initial Electricity 05/24/81 05/25/81 Commercial Operation 08/01/81 07/30/81

-- -- .~ . . . . - - _ . _ - - _ _ - - . . . . ,. .. .. _ . . ._

1

~' '

DOCKET NO. 50-364 1 UNIT 2 I

, DATE- January 8,1996  !

COMPLETED BY S. M. Allison TELEPHONE (334) 899-5156 ext. 3442 4

' MONTH December j DAY- AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 I

e 1 446 17 837 .

I
2 840 18 831 )

. 3 840 19 836 4 835 20 844

5. 832 21 845 6 831 22 836 7 836 23 844 8 841 24 846 l 9 842 25 845 l

1

~

10 844 26 845 I l

2 11 845 27 844  ;

l 12 843 28 845 l 1

13 841 29 811 14 838 30 843 15 758 31 838 l 16 826 INSTRUCTIONS

On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.

1

_ . . m. _._ _ . . . - _ - _ . . _ _ . . . __ . . _ . _ - . . . _ _ . . . . _ _

[ . UNIT SHUTDOWNS AND POWER REDUCTIONS

~

  • DOCKET NO. 50-364 UNIT NAME J. M. Farley - Unit 2 DATE January 8,1996 COMPLETED BY S. M. Allison REPORT MONTH December TELEPIIONE (334) 899-5156, ext. 3442

)

R M E E S T A T Y Y S H SC P O O TO CAUSE AND CORRECTIVE E DURATION N D ED COMPONENT ACTION TO NO. DATE (1) (llOURS) (2) (3) LER # ME CODE (5) PREVENT RECURRENCE There were no shutdowns or power reductions during the month.

1 d

j d

1: 2: 3: EVENTS REPORTED F: Forced Reason Method INVOLVE A

! S: Scheduled A - Equipment Failure (Explain) 1 Manual GREATER TilAN 20%

D Maintenance or Test 2 - Manual Scrarn REDUCTION IN C - Refueling 3 Automatic Scram AVERAGE DAILY D - Regulatory Restri 4 - Other (Explain) POWER LEVEL FOR E - Operator Training a License Examination Tile PRECEDING 24 F- Administrative llOURS.

G Operational Error (Explain)

!I Other(Explain)