Monthly Operating Repts for Jan 1996 for Jm Farley Nuclear Plant
ML20097D565
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 01/31/1996
From: Hill R, Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9602130080
Download: ML20097D565 (9)


Text

e Southern Nuctsar Opsrating Company

. . Post Office Box 1295 Birmingham. Alabama 35201 Tzizphona (205) 888 5131 om umey Southern Nudear Operating Company Vice President Farley Project the southem eleClHC System February 9, 1996 Docket Nos. 50-348 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Joseph M. Farley Nuclear Plant Monthlv Ooerating Reoort Gentlemen:

Attached are the January 1996 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2, as required by Section 6.9.1.10 of the Technical Specifications.

If you have any questions, please advise.

Respectfully submitted, dh Nr Dave Morey RWC:(mor)

Attachments cc: Mr. S. D. Ebneter Mr. B. L. Siegel Mr. T. M. Ross 130007 9602130080 960131 PDR R

ADOCK 05000348 PDR

/V//

t')f i I

l

. . - . ~ . .- --. -. - . - . . - . . . . - - - . - . . . . - . - - . - - . . - - - . . _ . - . . _.-.-

4 -

i Joseph M. Farley Nuclear Plant Unit 1 Narrative Summary of Operations January 1996 There were no unit shutdowns or major power reductions during the month.

There was no major safety related maintenance performed during the month.

l I

a l

1 1

OPERATING DATA REPORT DOCKET NO. 50-348 DATE February 7,1996 COMPLETED BY R. D.11i11 TELEPilONE (334) 899-5156 OI!ERAIJNGJiTARIS I

1. Unit Name: Joseph M. Farley - Unit 1 Notes l
2. Reporting Period: January 1996 1) Cumulative data sincel2-01-77,
3. Licensed Thermal Power (MWt)- 7,652 date of commercial operation. l
4. Nameplate Rating (Gross MWe): 860
5. Design Electrical Rating (Net MWe): 829
6. Maximum Dependable Capacity (Gross MWe): 855.7 )
7. Maximum Dependable Capacity (Net MWe): 812_ t
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A
9. Power Level To Which Restricted, If Any (Net MWe): N/A
10. Reasons For Restrictions,If Any: N/A 1

1 This Month Yr.to Date Cumulative  ;

1

11. Ilours in Reporting Period 744.0 744.0 159,264.0
12. Number OfIIours Reactor Was Critical 744.0 744.0 127,433.4 l
13. Reactor Reserve Shutdown Hours 0.0 0.0 3,650.0
14. IIours Generator On-line 744.0 744.0 125,419.7
15. Unit Reserve Shutdown liours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1,973,106.6 1,973,106.6 322,727,479.5
17. Gross Electrical Energy Generated (MWH) 654,313.0 654,313.0 104,146,467.0
18. Net Electrical Energy Generated (MW!i) 622.693.0 622,693.0 __ 98,362,345.0
19. Unit Service Factor 100.0 100.0 78.7
20. Unit Availabilty Factor 100.0 100.0 78.7
21. Unit Cm. city Factor (Using MDC Net) 103.1 103.1 76.1
22. Unit Capacity Factor (Using DER Net) 101.0 101.0 74.5
23. Unit Forced Outage Rate 0.0 0.0 5.9
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A

25. If Sht. 'own at End Of Report Period, Estimated Date of Startup: N/A
26. Units in Test Status (Prior To Commercial Operation): Forecast Achieved Initial Criticality 08/06/77 08/09/77 Initial Electricity 08/20/77 08/18/77 Commercial Operation 12/01/77 12/01/77

DOCKET NO. 50-348 UNIT 1 DATE February 7,1996 COMPLETED BY R. D. Hill TELEPHONE (334) 899-5156 ,

MONTH January

, DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) t

! l 831 17 834 2 830 18 831

3 837 19 840 4 840 20 840 5 839 21 840  ;

6 839 22 840 7 839 23 837  !

8 840 24 835 9 840 25 840 10 839 26 834 11 838 27 836 12 838 28 839 13 838 29 838 14 838 30 834 15 837 31 833 16 836 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.

UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-348 UNIT NAME J. M. Farley - Unit 1 DATE February 7,1996 COMPLETED BY S. M. Allison REPORT MONT Januag i TELEPilONE (334) 899-5156, ext. 3442

_-_.___.q R M I E E S T A T Y Y S 11 SC P O O TO CAUSE ANDCORRI:CTIVE E DURATION N D ED COMPONE:NT ACTION TO NO DATE (1) (llOURS) (2) (3) LER # ME CODE (5) PREVENT RECURRENCE There were no shutdowns or power rr;cticus during the month.

.a 1: 2: 3: I: VENTS RI.POR'IED l': Forced Reason as '

Method INVOLVE A l S: Scheduled A - Equipment Failure (! xplain) 1 Manual GREATI:R TilAN 20%

11 Maintenance or Test 2 - Manual Scram REDUCTION IN C - Refucting 3 - Yomatic Scram AVI: RAGE DAILY D - Regulatory Restriction 4 - Other (I:xplain) POWl:R LEVE L I OR E - Operator Training & License I.xaminatior. Tile PRECI DING 24 I - Administrative llOURS.

G - Operational Error (Explain)

II - Other (Explain)

~

Joseph M. Farley Nuclear Plant Unit 2 Narrative Summary of Operations January 1996 On January 22,1996, with the unit operating in mode 1 at 100 percent reactor power, the unit was ramped to 64 percent reactor power due to speed osci'lations on the 2B ,

SGFP.

The speed controller card was replaced and the unit was retumed to 100 percent reactor power at 1714 on January 23,1996.

On January 30,1996, with the unit operating in mode 1 at 100 percent reactor power, the unit was ramped down to 15 percent reactor power to perform chemistry flush of SGs.

There was na major safety related maintenance performed during the month.

, OPERATING DATA REPORT DOCKET NO. 50-364 DATE February 7,1996 COMPLETED BY R. D. Hill TELEPIIONE (334) 899-5156 i

OPERATING _STAIUE

1. Unit Name: Joseph M. Farley - Unit 2 Notes
2. Reporting Period: January 1996 1) Cumulative data since 07-30-81,
3. Licensed Thermal Power (MWt): 2,652 date of commercial operation.
4. Nameplate Rating (Gross MWe): 860
5. Design Electrical Rating (Net MWe): 829
6. Maximum Dependable Capacity (Gross MWe): 863.6
7. Maximum Dependable Capacity (Net MWe): 822
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A
9. Power Level To Which Restricted, If Any (Net MWe): N/A
10. Reasons For Restrictions,If Any: N/A This Month Yr.to Date Cumulative
11. Ilours in Reporting Period 744.0 744.0 127,177.0
12. Number Of Hours Reactor Was Critical 744.0 744.0 109,647.4
13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0
14. Hours Generator On-line 744.0 744.0 107,954.2
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1,867,750.6 1,867,750.6 274,841,541.0
17. Gross Electrical Energy Generated (MWH) 617,503.0 617,503.0 90,079,982.0
18. Net Electrical Energy Generated (MWH) 587,061.0 587,061.0 85,400,712.0
19. Unit Service Factor 100.0 _

100.0 84.9

20. Unit Availabilty Factor 100.0 100.0 84.9
21. Unit Capacity Factor (Using MDC Net) 96.6 96.0 82.0
22. Unit Capacity Factor (Using DER Net) 95.2 95.2 81.0
23. Unit Forced Outage Rate 0.0 0.0 4.0
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A

25. If Shut Down at End Of Report Period, Estimated Date of Startup: N/A
26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved Initial Criticality 05/06/81 05/08/81 Initial Electricity 05/24/81 05/25/81 Commercial Operation 08/01/81 07/30/81

. l DOCKET NO. 50-364 -

UNIT 2 DATE February 7,1996 COMPLETED BY R. D. Hill l TELEPHONE (334) 899-5156 l l

l MONTII January __ i l

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL l (MWe-Net) (MWe-Net) j l

1 835 17 834 l 2 833 18 831  ;

I 3 841 19 843  !

l 4' _

843 20 843 5 840 21 843 ,

6 841 22 803 7 842 23 753 8 844 24 838 9 842 25 844 l

10 842 26 836 11 842 27 840 12 843 28 844 13 843 29 842

14. 839 30 169 15 839 _

31 57 16 .

837 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-364 UNIT NAME J. M. Farley - Unit 2 DATE February 7,1996 COMPLETED BY S. M. Allison REPORT MONT January TELEPilONE (334) 899-5156, ext. 3442 R M E E S T A T Y Y S 11 SC P O O TO CAUSE AND CoRREC11VE E DURATION N D ED COMPONENT AC11oN TO NO DATE (1) OIOURS) (2) (3) LER # ME CODE (5) PREVENT RECURRENCE 001 6012f~F 0 A 4 N/A SJ- P On 960122, with the unit operating in mode 1 at 100 percent reactor power, the unit was ramped to 64 percent reactor power due to speed oscillations on the 2B SGFP.

The speed controller card was replaced and the unit was returned to 100 percent reactor power at 1714 on 960123.

.- n mm . m , - . ,3 - -,

. -. m ' y 7.vs. my , - , -

ym c.y, my 4 +:'CA. M "I d$ w:.J v .idAu a 2du'h % ~ ,m M,$A. dZchMao ., rAwi , ,La : .idE.hn 4.1.U4 002 960130 S 0 B 4 N/A AB SG On 960130, with the unit operating in mode 1 at 100 percent reactor power, the unit was ramped down to 15 percent reactor power to perform chemistry flush of SGs.

1: 2: 3: EVENTS REPORTED F: Forced Reason Method INVOLVE A S: Scheduled A - Equipment Failure (Explain) 1 - Manual GREATER TilAN 20%

B - Maintenance or Test 2 - Manual Scram REDUCTION IN C - Refueling 3 - Automatic Scram AVERAGE DAILY D - Regulatory Restriction 4 - Other (Explain) POWER LEVEL I OR

, E - Operator Training & License Examination TIIE PRECEDING 24 F - Administrative iIOURS.

G -Operational Error (Explain)

II - Other (tixplain)