Monthly Operating Repts for Oct 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With
ML20195C968
Person / Time
Site: Farley  
Issue date: 10/31/1998
From: Curlington A, Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9811170259
Download: ML20195C968 (5)


Text

_.

Dave Morey S:uthern Nuclear Vice President Op; rating C;mpany l Fadey Project P.O. Box 1295 Birmingham, Alabama 35201 Tel 205.992.5131 k

SOUTHERN h COMPANY November 10, 1998 Energy ro Serve YourWorld' Docket Nos.

50-348 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D C. 20555 Joseph M. Farley Nuclear Plant Monthly Operating Report Ladies and Gentlemen:

Enclosed are the October 1998 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2, as required by Section 6.9.1,10 of the Technical Specifications.

If you have any questions, please advise.

Respectfully submitted,

(/ 'l

]}lClu Dave Morey RWC:(mor)

Enclosures El - October Monthly Operating Report for Plant Farley Unit 1 E2 - October Monthly Operating Report for Plant Farley Unit 2 cc: Mr. L A. Reyes, Region II Administrator Mr. J. I. Zimmerman, NRR Project Manager Mr. T. P. Johnson, FNP Sr. Resident Inspector

.. < (j

,. b I

I 1

/

9811170259 981031 "

DR ADOCK 050003 l

OPERATING DATA REPORT o

DOCKET NO.:

50-348 UNIT NAME:

.I. M. Farley - Unit 1 DATE:

November 4,1998 COMPLETED BY:

A. H. Curlington TELEPHONE:

(334) 794-6431 ext. 3399 OPERATING _ STATUS 1.

Reporting Period:

OCTOBER 1998 2.

Design Electrical Rating (Net MWe):

829 3.

Maximum Dependable Capacity (Net MWe):

822 ThisMonth Yeatto Date Cumulative 4.

Number Of Hours Reactor Was Critical:

385.4 6,507.3 148,788.9 5.

Hours Generator On-line:

384.8 6,470.2 146,689.6 6.

Unit Reserve Shutdown Hours:

0.0 0.0 0.0 7.

Net Electrical Energy Generated (MWH):

308,855.0 5,228,359.0 115,528,687.0 CHALLENGES TO PRESSURIZER PORY OR PRESSURIZER SAFETY VALVES Date i lag No.

t Event Desenption There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.

El-1

~

UNIT SHUTDOWNS l

t l

DOCKET NO.:

50-348 UNIT NAME:

J. M. Farley - Unit i DATE:

November 4,1998 COMPLETED BY:

A. H. Curlington REPORTING PERIOD: OCTOBER 3998 TELEPHONE:

(334) 794-6431 ext. 3399 Type Method of F: Forced Duration Reason Shutting Down Cause/ Corrective Actions No.

. Date S: Scheduled (Hours)

(1)

(2)

Comments l

3

'981017 S

360.2 C

1 lAt 0048, on 981017, the unit was L

taken offline for the fifteenth i

refueling outage.

l I

(1) KLA50N.

W MLHlUU.

A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 ManualTrip/ Scram C Refueling 3 AutomaticTrip/ scram D Regulatory Restriction 4 - Continuation j

l E OperatorTraining/ License Examination 5 Other(Explain)

F-Administrative j

G -Operational Error (Explain) l 11 Other(Explain)

CAUSE/ CORRECTIVE ACTION / COMMENTS NARRATIVE REPORT At 1700 on 981016 the unit was ramped down and taken offline at 0048 on 981017 for the fifteenth refueling outage. On 981018 the unit entered mode 5 and on 981026 the core unload was complete.

Baffle Former Bolt replacement in progress along with other normal outage activities.

i n

El-2 i

i

l OPERATING DATA REPORT l

DOCKET NO.:

50-364 l

UNIT NAME:

J. M. Farley - Unit 2 DATE:

November 4,1998 COMPLETED BY:

A.11. Curlington l

TELEPilONE:

(334) 794-6431 ext. 3399 i

OPERATING STATUS 1.

Reporting Period:

OCTOBER 1998 2.

Design Electrical Rating (Net MWe):

829

3.. Maximum Dependable Capacity (Net MWe):

852 ThisAlonth Year _to Date Cumulative 4.

Number Of Hours Reactor Was Critical:

745.0 6,087.4 131,004.4 i

5.

Hours Generator On-line:

745.0 6,050.5 129,181.4 6.

Unit Reserve Shutdov.n Hours:

0.0 0.0 0.0 l

'7.

Net Electrical Energy Generated (MWH):

636,592.0 5,020,478.0 102,851,842.0 l

CHALLENGES TO PRESSURIZER PORY OR PRESSURIZER SAFETY VALVES l

Date i I ag No.

I Event Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.

1 1

i l

l l

E2-1

UNIT SHUTDOWNS DOCKET NO.:

50-364 UNIT NAME:

J. M. Farley - Unit 2 DATE:

November 4,1998 COMPLETED BY:

A.11. Curlington REPORTING PERIOD: OCTOBER.1998 TELEPilONE:

(334) 794-6431 ext. 3399 Type Method of F: Forced Duration Reason Shutting Down Cause/ Corrective Actions No.

Date S: Scheduled (llours)

(1)

(2)

Comments There were no unit shutdowns during the month.

i (l) KLASUN (2) MLiiIUU.

A Equipment Failure (Explain) 1 - Manual D MilntenanceorTest 2 - Manual Trip / scram C Refucting 3 - Automatic Trip / scram D Regulatory Restriction 4 Continuation E Operator Training / License Examination 5 - other (Explain)

F Administrative G Operational Error (Explain) 11 other(Explain) l CAUSE/ CORRECTIVE ACTION / COMMENTS l

NARRATIV E REPORT No significant power reductions occured this period.

{

f l

s E2-2 l

,