Monthly Operating Repts for Oct 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With
ML20195C968
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 10/31/1998
From: Curlington A, Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9811170259
Download: ML20195C968 (5)


Text

_. __ _ __

Dave Morey S:uthern Nuclear

.,, Vice President Op; rating C;mpany l Fadey Project P.O. Box 1295 Birmingham, Alabama 35201 Tel 205.992.5131 SOUTHERNkh COMPANY November 10, 1998 Energy ro Serve YourWorld' Docket Nos. 50-348 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D C. 20555 Joseph M. Farley Nuclear Plant Monthly Operating Report Ladies and Gentlemen:

Enclosed are the October 1998 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2, as required by Section 6.9.1,10 of the Technical Specifications.

If you have any questions, please advise.

Respectfully submitted,

(/ 'l ]}lClu Dave Morey RWC:(mor)

Enclosures El - October Monthly Operating Report for Plant Farley Unit 1 E2 - October Monthly Operating Report for Plant Farley Unit 2 cc: Mr. L A. Reyes, Region II Administrator Mr. J. I. Zimmerman, NRR Project Manager  ;

Mr. T. P. Johnson, FNP Sr. Resident Inspector .. < (j

,. b I I 1 /

9811170259 981031 "

DR ADOCK 050003 l

OPERATING DATA REPORT o

DOCKET NO.: 50-348 UNIT NAME: .I. M. Farley - Unit 1 DATE: November 4,1998 COMPLETED BY: A. H. Curlington TELEPHONE: (334) 794-6431 ext. 3399 OPERATING _ STATUS

1. Reporting Period: OCTOBER 1998
2. Design Electrical Rating (Net MWe): 829
3. Maximum Dependable Capacity (Net MWe): 822 ThisMonth Yeatto Date Cumulative
4. Number Of Hours Reactor Was Critical: 385.4 6,507.3 148,788.9
5. Hours Generator On-line: 384.8 6,470.2 146,689.6
6. Unit Reserve Shutdown Hours: 0.0 0.0 0.0
7. Net Electrical Energy Generated (MWH): 308,855.0 5,228,359.0 115,528,687.0 CHALLENGES TO PRESSURIZER PORY OR PRESSURIZER SAFETY VALVES Date i lag No. t Event Desenption There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.

El-1

~

. . UNIT SHUTDOWNS l

t l DOCKET NO.: 50-348 UNIT NAME: J. M. Farley - Unit i DATE: November 4,1998 COMPLETED BY: A. H. Curlington REPORTING PERIOD: OCTOBER 3998 TELEPHONE: (334) 794-6431 ext. 3399 Type Method of F: Forced Duration Reason Shutting Down Cause/ Corrective Actions No. . Date S: Scheduled (Hours) (1) (2) Comments l 3 '981017 S 360.2 C 1 lAt 0048, on 981017, the unit was L

' i taken offline for the fifteenth refueling outage.

l I

I I

(1) KLA50N. W MLHlUU.

! A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 ManualTrip/ Scram I C Refueling 3 AutomaticTrip/ scram D Regulatory Restriction 4 - Continuation E OperatorTraining/ License Examination j l 5 Other(Explain) j F- Administrative <

G -Operational Error (Explain) 11 Other(Explain) l CAUSE/ CORRECTIVE ACTION / COMMENTS NARRATIVE REPORT At 1700 on 981016 the unit was ramped down and taken offline at 0048 on 981017 for the fifteenth I refueling outage. On 981018 the unit entered mode 5 and on 981026 the core unload was complete.

Baffle Former Bolt replacement in progress along with other normal outage activities.

l i

n El-2 i

i

l , .

. OPERATING DATA REPORT l DOCKET NO.: 50-364 l UNIT NAME:

J. M. Farley - Unit 2 DATE: November 4,1998

, COMPLETED BY: A.11. Curlington l TELEPilONE: (334) 794-6431 ext. 3399 i

OPERATING STATUS

1. Reporting Period: OCTOBER 1998
2. Design Electrical Rating (Net MWe): 829
3. . Maximum Dependable Capacity (Net MWe): 852 ThisAlonth Year _to Date Cumulative
4. Number Of Hours Reactor Was Critical: 745.0 6,087.4 131,004.4 i 5. Hours Generator On-line: 745.0 6,050.5 129,181.4
6. Unit Reserve Shutdov.n Hours
0.0 0.0 0.0 l '7. Net Electrical Energy Generated (MWH): 636,592.0 5,020,478.0 102,851,842.0 l

CHALLENGES TO PRESSURIZER PORY OR PRESSURIZER SAFETY VALVES l

l Date i I ag No. I Event Description  :

There were no challenges to Pressurizer PORV or I Pressurizer Safety Valves.

1 1

i l

l l

l I

E2-1

UNIT SHUTDOWNS DOCKET NO.: 50-364 UNIT NAME: J. M. Farley - Unit 2 DATE: November 4,1998 COMPLETED BY: A.11. Curlington REPORTING PERIOD: OCTOBER.1998 TELEPilONE: (334) 794-6431 ext. 3399 Type .

Method of F: Forced Duration Reason Shutting Down Cause/ Corrective Actions No. Date S: Scheduled (llours) (1) (2) Comments There were no unit shutdowns during the month.

i (l) KLASUN (2) MLiiIUU.

A Equipment Failure (Explain) 1 - Manual D MilntenanceorTest 2 - Manual Trip / scram C Refucting 3 - Automatic Trip / scram D Regulatory Restriction 4 Continuation E Operator Training / License Examination 5 - other (Explain)

F Administrative G Operational Error (Explain) 11 other(Explain) l CAUSE/ CORRECTIVE ACTION / COMMENTS l NARRATIV E REPORT No significant power reductions occured this period.

{

f l

s E2-2 l

__ ,