Text
_.
Dave Morey S:uthern Nuclear Vice President Op; rating C;mpany l Fadey Project P.O. Box 1295 Birmingham, Alabama 35201 Tel 205.992.5131 k
SOUTHERN h COMPANY November 10, 1998 Energy ro Serve YourWorld' Docket Nos.
50-348 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D C. 20555 Joseph M. Farley Nuclear Plant Monthly Operating Report Ladies and Gentlemen:
Enclosed are the October 1998 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2, as required by Section 6.9.1,10 of the Technical Specifications.
If you have any questions, please advise.
Respectfully submitted,
(/ 'l
]}lClu Dave Morey RWC:(mor)
Enclosures El - October Monthly Operating Report for Plant Farley Unit 1 E2 - October Monthly Operating Report for Plant Farley Unit 2 cc: Mr. L A. Reyes, Region II Administrator Mr. J. I. Zimmerman, NRR Project Manager Mr. T. P. Johnson, FNP Sr. Resident Inspector
.. < (j
,. b I
I 1
/
9811170259 981031 "
DR ADOCK 050003 l
OPERATING DATA REPORT o
DOCKET NO.:
50-348 UNIT NAME:
.I. M. Farley - Unit 1 DATE:
November 4,1998 COMPLETED BY:
A. H. Curlington TELEPHONE:
(334) 794-6431 ext. 3399 OPERATING _ STATUS 1.
Reporting Period:
OCTOBER 1998 2.
Design Electrical Rating (Net MWe):
829 3.
Maximum Dependable Capacity (Net MWe):
822 ThisMonth Yeatto Date Cumulative 4.
Number Of Hours Reactor Was Critical:
385.4 6,507.3 148,788.9 5.
Hours Generator On-line:
384.8 6,470.2 146,689.6 6.
Unit Reserve Shutdown Hours:
0.0 0.0 0.0 7.
Net Electrical Energy Generated (MWH):
308,855.0 5,228,359.0 115,528,687.0 CHALLENGES TO PRESSURIZER PORY OR PRESSURIZER SAFETY VALVES Date i lag No.
t Event Desenption There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.
El-1
~
UNIT SHUTDOWNS l
t l
DOCKET NO.:
50-348 UNIT NAME:
J. M. Farley - Unit i DATE:
November 4,1998 COMPLETED BY:
A. H. Curlington REPORTING PERIOD: OCTOBER 3998 TELEPHONE:
(334) 794-6431 ext. 3399 Type Method of F: Forced Duration Reason Shutting Down Cause/ Corrective Actions No.
. Date S: Scheduled (Hours)
(1)
(2)
Comments l
3
'981017 S
360.2 C
1 lAt 0048, on 981017, the unit was L
taken offline for the fifteenth i
refueling outage.
l I
(1) KLA50N.
W MLHlUU.
A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 ManualTrip/ Scram C Refueling 3 AutomaticTrip/ scram D Regulatory Restriction 4 - Continuation j
l E OperatorTraining/ License Examination 5 Other(Explain)
F-Administrative j
G -Operational Error (Explain) l 11 Other(Explain)
CAUSE/ CORRECTIVE ACTION / COMMENTS NARRATIVE REPORT At 1700 on 981016 the unit was ramped down and taken offline at 0048 on 981017 for the fifteenth refueling outage. On 981018 the unit entered mode 5 and on 981026 the core unload was complete.
Baffle Former Bolt replacement in progress along with other normal outage activities.
i n
El-2 i
i
l OPERATING DATA REPORT l
DOCKET NO.:
50-364 l
UNIT NAME:
J. M. Farley - Unit 2 DATE:
November 4,1998 COMPLETED BY:
A.11. Curlington l
TELEPilONE:
(334) 794-6431 ext. 3399 i
OPERATING STATUS 1.
Reporting Period:
OCTOBER 1998 2.
Design Electrical Rating (Net MWe):
829
- 3.. Maximum Dependable Capacity (Net MWe):
852 ThisAlonth Year _to Date Cumulative 4.
Number Of Hours Reactor Was Critical:
745.0 6,087.4 131,004.4 i
5.
Hours Generator On-line:
745.0 6,050.5 129,181.4 6.
Unit Reserve Shutdov.n Hours:
0.0 0.0 0.0 l
'7.
Net Electrical Energy Generated (MWH):
636,592.0 5,020,478.0 102,851,842.0 l
CHALLENGES TO PRESSURIZER PORY OR PRESSURIZER SAFETY VALVES l
Date i I ag No.
I Event Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.
1 1
i l
l l
E2-1
UNIT SHUTDOWNS DOCKET NO.:
50-364 UNIT NAME:
J. M. Farley - Unit 2 DATE:
November 4,1998 COMPLETED BY:
A.11. Curlington REPORTING PERIOD: OCTOBER.1998 TELEPilONE:
(334) 794-6431 ext. 3399 Type Method of F: Forced Duration Reason Shutting Down Cause/ Corrective Actions No.
Date S: Scheduled (llours)
(1)
(2)
Comments There were no unit shutdowns during the month.
i (l) KLASUN (2) MLiiIUU.
A Equipment Failure (Explain) 1 - Manual D MilntenanceorTest 2 - Manual Trip / scram C Refucting 3 - Automatic Trip / scram D Regulatory Restriction 4 Continuation E Operator Training / License Examination 5 - other (Explain)
F Administrative G Operational Error (Explain) 11 other(Explain) l CAUSE/ CORRECTIVE ACTION / COMMENTS l
NARRATIV E REPORT No significant power reductions occured this period.
{
f l
s E2-2 l
,