Monthly Operating Repts for June 1998 for Jm Farley Nuclear Plant,Units 1 & 2
ML20236M598
Person / Time
Site: Farley  
Issue date: 06/30/1998
From: Clouse R, Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9807140151
Download: ML20236M598 (5)


Text

- _ _ _ _ _ _. _ _

a Dave Mor:y SIuthera Nuclear Vice President Operating Company Farley Project P.O. Box 1295 Birmingham, Alabama 35201 Tel 205.992.5131 i

July 10, 1998 SOUTHERN COMPANY Energy eo Serve YourWorld" Docket Nos.

50-348 j

50-364 I

l I

U. S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, D C 20555 Joseph M. Farley Nuclear Plant Monthly Operating Report Ladies and Gentlemen:

i Enclosed are the June 1998 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units I and 2, as required by Section 6.9.1.10 of the Technical Specifications.

If you have any questions, please advise.

Respectfully submitted, ML/

Dave Morey j

RWC:(mor)

Enclosures El - June Monthly Operating Report for Plant Farley Unit I E2 - June Monthly Operating Report for Plant Farley Unit 2 cc: Mr. L. A. Reyes, Region 11 Administrator Mr. J.1. Zimmerman, NRR Project Manager Mr. T. M. Ross, FNP Sr. Resident inspector f) 9907140151 990630 PDR ADOCK 05000348; R

PDR !

,~A

,-o A.; L

OPERATING DATA REPORT l

DOCKET NO.:

50-348 UNIT NAME:

J. M. Farley - Unit I

^

DATE:

July 6,1998 COMPLETED BY:

R. W. Clouse i

TELEPHONE:

(205) 992-5732

)

l I

OPERATING STATUS 1.

Reporting Period:

June 1998 2.

Design Electrical Rating (Net MWe):

829 3.

Maximtun Dependable Capacity (Net MWe): __

822 l

This Month Year to Date Cumulative 4.

Number Of11ours Reactor Was Critical:

720.0 4,343.0 146,624.6 5.

Ilours Generator On-line:

720.0 4,343.0 144,562.4 6.

Unit Reserve Shutdown Hours:

0.0 0.0_

0.0 7.

Net Electrical Energy Generated (MWII):

586,755.0 3,576,559.0 113,876,887.0 l

l I

I CHALLENGES TO PRESSURIZER PORY OR PRESSURIZER SAFETY VALVES i

Date i I ag No, i Event Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.

l El-1 I

l

UNIT SHUTDOWNS DOCKET NO.:

50-348 UNIT NAME:

J. M. Farley - Unit 1 DATE:

July 6,1998 COMPLETED BY:,

R. W. Clouse REPORTING PERIOD: June _1998 TELEPilONE:

(205) 992 5732 Type Method of F: Forced Duration Reason Shutting Down Cause/ Corrective Actions No.

Date S: Scheduled (IIours)

(1)

(2)

Comments j

There were no unit shutdowns during the month.

t (1) KLAdvN.

(2) M L11tu u.

J A Equipment Failure (Explain) 1 Manual I

B - Maintenance or Test 2 - Manual Trip / Scram C Refueling 3 - Automatic Trip / scram D Regulatory Restriction 4 - Continuation E Operator Training / License Examination -

5 - Other (Explain)

F Administrate G - Operational Error (l'xplain) 11-Other (Explain) l CAUSE/ CORRECTIVE ACTION / COMMENTS i

NARRATIVE REPORT On 980620 at 2201 the Unit was ramped to 89% reactor power for Quarterly Governor Valve testing.

The testing was completed and the Unit returned to 100% on 980621 at 0326.

El-2

L OPERATING DATA REPORT DOCKET NO.:

50-364 r

UNIT NAME:

J. M. Farley - Unit 2 i

DATE:

July 6,1998 COMPLETED BY:

R. W. Clouse TELEPHONE:

(205) 992-5732 OPERATING STATUS i

1.

Reporting Period:

June 1998 l : 2.

Design Electrical Rating (Net MWe):

829

' - 3.

Maximum Dependable Capacity (Net MWe):

852 I

i

)

This_ Month Yeatto.Date Cumulative 4.

Number Of Hours Reactor Was Critical:

720.0 3,134.4 128,051.4 l 5.

Hours Generator On-line:

720.0 3,097.5 126,228.4 l

6.

Unit Reserve Shutdown IIours:

0.0 0.0 0.0 7.

Net Electrical Energy Generated (MWH):

608,894.0 2,551,923.0 100,383,287.0 i

CHALLENGES TO PRESSURIZER PORV OR PRESSURIZER SAFETY VALVES j

i Date i 1ag No.

1 Event Description There were no challenges to Pressurizer PORV or l

Pressurizer Safety Valves.

i l

E2-1 L__________---

UNIT SHUTDOWNS i

DOCKET NO.:

50-364 UNIT NAME:

J. M. Farley - Unit 2 DATE:

July 6,1998 COMPLETED BY:

R. W. Clouse REPORTING PERIOD: June 1998 TELEPilONE:

(205) 992-5732 Type Method of F: Forced Duration Reason Shutting Down Cause/ Corrective Actions No.

Date S: Scheduled (liours)

(1)

(2)

Comments There were no unit shutdowns during the month.

4 (1) KLASUN.

(2) MLillVD.

A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip / Scram C. Refueling 3 - Automatic Trip / scram D - Regulatory Restriction 4 - Continuation E. Operator Training / License Examination 5 - Other(Explain)

F Administrative G -Operational Error (Explain) i 11 Other(Explain)

CAUSE/ CORRECTIVE ACTION / COMMENTS 1

l NARRATIVE REPORT On 980607 at 0513 the Unit was ramped to 95% reactor power for turbine performance testing after power uprate. The testing was completed and the reactor returned to 100% reactor power on 980607 at 1305.