a Dave Mor:y SIuthera Nuclear Vice President Operating Company Farley Project P.O. Box 1295 Birmingham, Alabama 35201 Tel 205.992.5131 i
July 10, 1998 SOUTHERN COMPANY Energy eo Serve YourWorld" Docket Nos.
50-348 j
50-364 I
l I
U. S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, D C 20555 Joseph M. Farley Nuclear Plant Monthly Operating Report Ladies and Gentlemen:
i Enclosed are the June 1998 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units I and 2, as required by Section 6.9.1.10 of the Technical Specifications.
If you have any questions, please advise.
Respectfully submitted, ML/
Dave Morey j
RWC:(mor)
Enclosures El - June Monthly Operating Report for Plant Farley Unit I E2 - June Monthly Operating Report for Plant Farley Unit 2 cc: Mr. L. A. Reyes, Region 11 Administrator Mr. J.1. Zimmerman, NRR Project Manager Mr. T. M. Ross, FNP Sr. Resident inspector f) 9907140151 990630 PDR ADOCK 05000348; R
PDR !
,~A
,-o A.; L
OPERATING DATA REPORT l
DOCKET NO.:
50-348 UNIT NAME:
J. M. Farley - Unit I
^
DATE:
July 6,1998 COMPLETED BY:
R. W. Clouse i
TELEPHONE:
(205) 992-5732
)
l I
OPERATING STATUS 1.
Reporting Period:
June 1998 2.
Design Electrical Rating (Net MWe):
829 3.
Maximtun Dependable Capacity (Net MWe): __
822 l
This Month Year to Date Cumulative 4.
Number Of11ours Reactor Was Critical:
720.0 4,343.0 146,624.6 5.
Ilours Generator On-line:
720.0 4,343.0 144,562.4 6.
Unit Reserve Shutdown Hours:
0.0 0.0_
0.0 7.
Net Electrical Energy Generated (MWII):
586,755.0 3,576,559.0 113,876,887.0 l
l I
I CHALLENGES TO PRESSURIZER PORY OR PRESSURIZER SAFETY VALVES i
Date i I ag No, i Event Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.
l El-1 I
l
UNIT SHUTDOWNS DOCKET NO.:
50-348 UNIT NAME:
J. M. Farley - Unit 1 DATE:
July 6,1998 COMPLETED BY:,
R. W. Clouse REPORTING PERIOD: June _1998 TELEPilONE:
(205) 992 5732 Type Method of F: Forced Duration Reason Shutting Down Cause/ Corrective Actions No.
Date S: Scheduled (IIours)
(1)
(2)
Comments j
There were no unit shutdowns during the month.
t (1) KLAdvN.
(2) M L11tu u.
J A Equipment Failure (Explain) 1 Manual I
B - Maintenance or Test 2 - Manual Trip / Scram C Refueling 3 - Automatic Trip / scram D Regulatory Restriction 4 - Continuation E Operator Training / License Examination -
5 - Other (Explain)
F Administrate G - Operational Error (l'xplain) 11-Other (Explain) l CAUSE/ CORRECTIVE ACTION / COMMENTS i
NARRATIVE REPORT On 980620 at 2201 the Unit was ramped to 89% reactor power for Quarterly Governor Valve testing.
The testing was completed and the Unit returned to 100% on 980621 at 0326.
El-2
L OPERATING DATA REPORT DOCKET NO.:
50-364 r
UNIT NAME:
J. M. Farley - Unit 2 i
DATE:
July 6,1998 COMPLETED BY:
R. W. Clouse TELEPHONE:
(205) 992-5732 OPERATING STATUS i
1.
Reporting Period:
June 1998 l : 2.
Design Electrical Rating (Net MWe):
829
' - 3.
Maximum Dependable Capacity (Net MWe):
852 I
i
)
This_ Month Yeatto.Date Cumulative 4.
Number Of Hours Reactor Was Critical:
720.0 3,134.4 128,051.4 l 5.
Hours Generator On-line:
720.0 3,097.5 126,228.4 l
6.
Unit Reserve Shutdown IIours:
0.0 0.0 0.0 7.
Net Electrical Energy Generated (MWH):
608,894.0 2,551,923.0 100,383,287.0 i
CHALLENGES TO PRESSURIZER PORV OR PRESSURIZER SAFETY VALVES j
i Date i 1ag No.
1 Event Description There were no challenges to Pressurizer PORV or l
Pressurizer Safety Valves.
i l
E2-1 L__________---
UNIT SHUTDOWNS i
DOCKET NO.:
50-364 UNIT NAME:
J. M. Farley - Unit 2 DATE:
July 6,1998 COMPLETED BY:
R. W. Clouse REPORTING PERIOD: June 1998 TELEPilONE:
(205) 992-5732 Type Method of F: Forced Duration Reason Shutting Down Cause/ Corrective Actions No.
Date S: Scheduled (liours)
(1)
(2)
Comments There were no unit shutdowns during the month.
4 (1) KLASUN.
(2) MLillVD.
A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip / Scram C. Refueling 3 - Automatic Trip / scram D - Regulatory Restriction 4 - Continuation E. Operator Training / License Examination 5 - Other(Explain)
F Administrative G -Operational Error (Explain) i 11 Other(Explain)
CAUSE/ CORRECTIVE ACTION / COMMENTS 1
l NARRATIVE REPORT On 980607 at 0513 the Unit was ramped to 95% reactor power for turbine performance testing after power uprate. The testing was completed and the reactor returned to 100% reactor power on 980607 at 1305.
E2-2