Monthly Operating Repts for Aug 1999 for Jmfnp.With
ML20216E494
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 08/31/1999
From: Marlar W, Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NEL-99-0321, NUDOCS 9909140192
Download: ML20216E494 (6)


Text

, 1

  • Dave Morey Southern Nucle:r

,

  • Vice President Operating CompaIy Farley Project ' P.O. Box 1295 Birmingham. Alabama 35201 j

Tel 205.992.5131 September 10, 1999 SOUTHERN h Docket Nos.: 50-348 COMPANY 50-364 p,,,gy ,, S,,,, 7,,, ,,,,,

NEl 99-0321 i

U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 j Joseph M. Farley Nuclear Plant J

Monthly Operating Report '

Ladies and Gentlemen:

Enclosed are the August 1999 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2, as required by Section 6.9.1.10 of the Technical Specifications.

If you have any questions, please advise. l Respectfully submitted, ,

b M Dave Morey RWC:mor

Enclosures:

1. August Monthly Operating Report for Plant Farley Unit 1 i
2. August Monthly Operating Report for Plant Farley Unit 2 pl-9909140192 990831 PDR ADOCK 05000348 R PDR

+

o j 1

Page 2

. U. S. Nuclear Regulatory Commission l

cc: . Southern Nuclear Operating Company 1 Mr. L. M. Stinson, General Manager U. S. Nuclear Regulatory Commission, Washington, D. C.

Mr. L. M. Padovan, Licensing Project Manager - Farley U. S. Nuclear Regulatory Commission, Region 11 Mr. L. A. Reyes, Regional Administrator >

Mr. T. P. Johnson, Senior Resident Inspector - Farley 1

)

l l

l l

l l

I OPERATING DATA REPORT DOCKET NO.: 50-348 UNIT NAME: J. M. Farley - Unit 1 DATE: September 8.1999 COMPLETED BY: w. L Marlar TELEPIIONE: (334)s 4 4554 i OPERATING STATUS 1

1. Reporting Period: AUGUST 1999
2. Design Electrical Rating (Net MWe): 854
3. Maximum Dependable Capacity (Net MWe): 847 l

l This Month Year to Date Cumulative l

l 4. Number Of Hours Reactor Was Critical: 744.0 5,793.2 154,696.4

5. Hours Generator On-line: 744.0 5,766.6 152,526.3
6. Unit Reserve Shutdown Hours: 0.0 0.0 0.0
7. Net Electrical Energy Generated (MWH): 617,851.0 4,775,474.0 120,309,791.0 1

CHALLENGES TO PRESSURIZER PORY OR PRESSURIZER SAFETY VALVES l

l Date Tag No. Event Description 1

There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.

l El-1

r UNIT SHUTDOWNS DOCKET NO.: 50-348 UNIT NAME: J. M. Farley Unit 1 DATE: september 8,1999 COMPLETED BY W. L Marlar REPORTING PERIOD: AUGUST 1999 TELEPIIONE: (334) 814-4554 Type Method of F: Forced Duration Reason Shutting Down Cause/ Corrective Actions No. Date s: scheduled (flours) (1) (2) Comments There were no unit shutdowns during the month.

U R (2) MLIIIOD AF ent Failure (Explain) 1 - Manual B-L aance or Test 2 - Manual Trip / Scram C Retuming 3 - Automatic Trip / Scram D - Regulatory Restriction 4 Continuation i E - operator Training / License Examination 5 other(Explain) '

F- Administrative G operational Error (Explain) 11 - other (Explain)

CAUSE/ CORRECTIVE ACTION / COMMENTS 1

NARRATIVE REPORT On 990828 at 2200 Unit I was ramped down to 89% power to perform Governor Valve Testing.

The Unit was returned to 100% power on 990829 at 0514.

El-2 I

p

, , OPERATING DATA REPORT l- DOCKET NO.: 50-364 UNIT NAME: J. M. Farley - Unit 2 DATE: September 8,1999 COMPLETED BY: W. L Marlar TELEPHONE: 0 34) 814-4554 OPERATING STATUS l 1. Reporting Period: AUGUST 1999

2. Design Electrical Rating (Net MWe): 855
3. Maximum Dependable Capacity (Net MWe): 852 This Month Year to Date Cumulative
4. Number Of Hours Reactor Was Critical: 744.0 5,773.4 138,241.8 l
5. Hours Generator On-line: 744.0 5,761.2 136,406.6
6. Unit Reserve Shutdown Hours: 0.0 0.0 0.0
7. Net Electrical Energy Generated (MWH): 624,353.0 4,348,263.0 108,447,549.0 l- )

1 CHALLENGES TO PRESSURIZER PORY OR PRESSURIZER SAFETY VALVES I

Date Tag No. Event Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.

I I

I E2-1 i

! l L . .

UNIT SHUTDOWNS DOCKET NO.: 50-364 UNIT NAME: J. M. Farley - Unit 2 DATE: September 8,1999 COMPLETED BY W. L. Marlar REPORTING PERIOD: AUGUST 1999 TELEPIlONE: (334)814-4554 Type Method of

~

F: Forced Duration Reason Shutting Down Cause/ Corrective Actions No. Date S: Scheduled (Hours) (1) (2) Comments There were no unit shutdowns during the month, t1) REASON. (2) METI(OD.

A Equipment Failure (Explain) 1 - Manual D - Maintenance or Test 2 - Manual Trip / scram C Refuelmg 3 - Automatic Trip / scram D - Regulatory Restriction 4 Contmuation E - operator Training / License Examination 5 other(Explain)

F Administrative O operationalError(Explain)

II- other (Explain)

CAUSE/ CORRECTIVE ACTION / COMMENTS i

NARRATIVE REPORT There were no significant power reductions this period.

1 E2-2