Corrected Monthly Operating Rept for Nov 1989 for Jm Farley Nuclear Plant Unit 2
ML20055F750
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 11/30/1989
From: Dennis Morey
ALABAMA POWER CO.
To:
Shared Package
ML20055F742 List:
References
NUDOCS 9007190147
Download: ML20055F750 (1)


Text

f =

  • U L OPERATING DATA REPORT DOCKEP No. 50-364 DATE 12/6/89 COMPLETED BY D. N. Morey J TELEPHONE (205)B99-5156 j L '

l' -OPERATING STATUS Notes-1.' Unit Name: Joseph M. Farley - Unit 2 1) Cumulative data since  !

2. Reporting Period November 3989 7-30-81, date of I
3. Licensed Thermal Power (MVt)
2,652 commercial operation.' i
4. Nameplate Rating (Gross MVe): 860 j
5. Design Electrical Rating (Net MVe): 829 '

6c Maximum Dependable Capacity (Gross MVe): 870.3

, 7. Maximum Dependable Capacity (Net MVe): 829.7

8. If-Changes occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A
9. Power Level To Vhich Restricted, If Any (Net MWe): N/A L10. Reasons For Restrictions, If Any: N/A This Month Yr-to-Date Cumulative
11. Hours In Reporting Period 720 8,016 73,105 la. Number Of Hours Reactor Vas Critical 702.3 6,461.2 63,139.1
13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0- l
14. Hours Generator On-Line 695.6 6,295.4 62,328.0
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 16.~ Gross Thermal Energy Generated (MVH) 1,815,074 16,086,752 158,284,388
17. Gross-Electrical Energy. Generated (MVH) 600,696 5,273,398 52,008,884
18. Net Electrical Energy Generated (MVH) 571,776 4,990,412 49,315,698
19. Unit Service Factor 96.6 78.5 85.3
20. Unit Availability Factor 96.6 78.5 85.3 1
21. Unit Capacity Factor (Using MDC Net)

. 95.7 75.0 82.5

22. Unit Capacity Factor (Using DER Net) 95.8 75.1 81.4
23. Unit Forced Outage Rate 3.4 5.2 4.6
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A

25. If Shut Down At End Of Report Period, Estimated Date of Startup: N/A

-.36. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY 05/06/81 05/08/81 INITIAL ELECTRICITY 05/24/81 05/25/81 COMMERCIAL OPERATION 08/01/81 07/30/81 Form 2/30 9007190147 900711 PDR ADOCK 05000364 R PDC