Corrected Monthly Operating Rept for May 1990 for Jm Farley Nuclear Plant Unit 2
ML20055F762
Person / Time
Site: Farley 
Issue date: 05/31/1990
From: Dennis Morey
ALABAMA POWER CO.
To:
Shared Package
ML20055F742 List:
References
NUDOCS 9007190165
Download: ML20055F762 (1)


Text

-

OPERATING DATA REPORT DOCKET NO.

50-364 Lp DATE June 6, 1990 COMPLETED BY D. N. Morey TELEPHONE (205)899-5156 l

' OPERATING STATUS Notes

1. Unit Name

' Joseph M. Parley - Unit 2

1) Cumulative data since l
2. Reporting Period:

May 1990 7-30-81, date of l

3. Licensed Thermal Power (MVt):

2,652 commercial operation.

4. Nameplate Rating (Gross MVe):

860 5; Design Electrical Rating (Net MVe): 829

6. Maximum Dependable Capacity (Gross MVe):

868.6

7. Maximum Dependable Capacity (Net MVe):

828.2

8. If Changes Occur in capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A
9. Power Level To Which Restricted, If Any (Net MWe):

N/A

10. Reasons For Restrictions, If Any:

N/A 1

4 l

This Month Yr-to-Date Cumulative l

11. Hours In Reporting Period 744 3,623 77,472 67,162.6-l'j
12. Number Of Hours Reactor Was Critical 474.0 3,279.4
13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0
14. Hours Generator On-Line 457.7 3,262.8 66,334.8 i"
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MVH) 1,168,621 8,436,301 168,692,568 j
17. Gross Electrical Energy Generated (MVH) 380,622 2,782,340 55,448,882
18. Net Electrical Energy-Generated (MVH) 355,632 2,641,644 52,585,034
19. Unit Service Factor 61.5 90.1 85.6 R
20. Unit Availability Factor 61.5 90.1 85.6 l
21. Unit Capacity-Factor (Using MDC Net) 57.7 88.0 82.9 L

'22. Unit Capacity Factor (Using DER Net) 57.7

'88.0

_ 81.9

23. Unit Forced Outage Rate 16.6 2.7 4.5
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

i L

Refueling / Maintenance Outage, September 14, 1990, approximately 7 weeks l

25. If Shut Down At End Of Report Period, Estimated Date of Startup: N/A
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 05/06/81 05/08/81 INITIAL ELECTRICITY 05/24/81 05/25/81 COMMERCIAL OPERATION 08/01/81 07/30/81 Form 2/30 g.0071901659007[jgn00cx **g 9