ML20106H079

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Feb 1996 for Jm Farley Nuclear Plant
ML20106H079
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 02/29/1996
From: Mcanulty M, Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9603200160
Download: ML20106H079 (9)


Text

, . __

, Sourturn Nuci;zr Operatin0 Company

. _ ,

  • Post Offico Box 1295

Birmingham, Alabama 35201 Telephone (205) 868 5131

o. . uor.y Southern Nudear Operating Company March 11, 1996 Docket Nos. 50-348 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk I Washington, D.C. 205$5 2 1

$ Joseph M. Farley Nuclear Plant

., Monthly Operating Renort

, Gentlemen: l l

Attached are the February 1996 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units I and 2, as required by Section 6.9.1.10 of the Technical Specifications.

i i If you have any questions, please advise.

Respectfully submitted,

$V 2/W)/

Dave Morey  !

RWC:(mor)

Attachments cc: Mr. S. D. Ebneter Mr. B. L. Siegel Mr. T. M. Ross 180091

\ \

9603200160 960229 PDR ADOCK 0500034G R PDR

Joseph M. Farley Nuclear Plant Unit 1 Narrative Summary of Operations February 1996 At 1201 on February 9,1996, with the unit operating in mode 1 at 100% reactor power, the unit was ramped down to 15% reactor power to perform chemistry flush of Steam Generators.

Flushing was completed and the unit was returned to 100% reactor power at  :

2029 on February 11,1996.

There was no major safety related maintenance performed during the month. I I

J 1

m

OPERATING DATA REPORT DOCKET NO. 50-348 DATE March 8,1996 COMPLETED BY M. W. McAnulty

'TELEPilONL (334) 899-5156, ext.3640 OPERATINGETAIUS

1. Unit Name: Joseph M. Farley - Unit 1 Notes
2. Reporting Period: February 1996 1) Cumulative data sincel2-01-77,
3. Licensed Thermal Power (MWt): 2,652_ date of commercial operation.
4. Nameplate Rating (Gross MWe): 860
5. Design Electrical Rating (Net MWe): 829
6. Maximum Dependable Capacity (Gross MWe) 855.7
7. Maximum Dependable Capacity (Net MWe): 812
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Smce Last Report, Give Reasons: N/A
9. Power Level To Which Restricted, If Any (Net MWe): N/A
10. Reasons For Restrictions,if Any: N/A This Month Yr.to Date Cumulative
11. Hours in Reporting Period 696.0 1,440.0 159,960.0
12. Number Of Hours Reactor Was Critical 696.0 1,440.0 128,129.4
13. Reactor Reserve Shutdown Hours 00 0.0 3,650.0
14. Hours Generator On-line 696.0 1,440.0 126,115.7
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 i
16. Gross Thermal Energy Generated (MWH) 1,745,785.1 3,718,891.7 324,473,264.6  :
17. Gross Electrical Energy Generated (MWH) 574,826.0 1,229,139.0 104,721,293.0 j
18. Net Electrical Energy Generated (MWH) 545,504.0 1,168,197.0 98,907,849.0
19. Unit Service Factor 100.0 100.0 78.8 )
20. Unit Availabilty Factor 100.0 100.0 78.8 j
21. Unit Capacity Factor (Using MDC Net) 96.5 99.9 76.1 l
22. Unit Capacity Factor (Using DER Net) 94.5 97.9 74.6 j
23. Unit Forced Outage Rate 0.0 0.0 5.9 j
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): j N/A
25. If Shut Down at End Of Report Period, Estimated Date of Startup: N/A
26. Units In Test Status (Prior To Com.mercial Operation): Forecast Achieved Initial Criticality 08/06/77 08/09/77 Initial Electricity 08/20/77 08/18/77 Commercial Operation 12/01/77 12/01/77

I j .

DOCKET FO. 50-348 UNIT 1 DATE March 8,1996 COMPLETED BY M. W. McAnulty TELEPHONE (334) 899-5156 ext ?64 MONTil February l

. DAY. AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 1 838 17 837

.2 834 18 837 i

.3 838 19 834 4 838 20 833 5 840 21 832 6 840 22 830 7 839 23 828 8 837 24 830 9 609 25 832 10 50 26 828 11 380 27 829 12 834 28 828 13 836 29 836 14 834 30 N/A 15 831 31 N/A 16 837 l

l INSTRUCTIONS l

On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-348 UNIT NAME J. M. Farley - Unit 1 DATE March 8,1996 COMPLETED BY M. W. McAnulty REPORT MONT February TELEPIlONE (334) 899-5156, ext.3640 R M E E S.

T A T Y Y S '11 SC P O O TO CAUSE AND CORRECTIVE E DURATION N D ED COMPONENT ACTION TO NO. DATE (1) (llOURS) (2) (3) LER # ME CODE (5) 4 PREVENT RECURRENCE 1

001 960209 S 0 B 4 N/A AB SG At 1201 on 960209, with the unit operating in mode 1 at 100% reactor power, the unit

{

l waS ramped down to 15% reactor power to l perform chemistry flush of Steam Generators.

j Flushing was completed and the unit was returned to 100% reactor power at 2029 i on 960211.  ;

l i

1 1

i

)

1: 2: 3: EVENTS REPORTED  !

F: Forced Reason Method INVOLVE A S: Scheduled A - Equipment Failure (Explain) 1 Manual GREATER TilAN 20%

B Maintenance or Test 2 - Manual Scram REDUCTION IN C - Refueling 3 Automatic Scram AVERAGE DAILY D - Regulatory Restriction 4 -Other (Explain) POWER LEVEL FOR E - Operator Training & License Examination TiiE PRECEDINO 24 F Administrative if0URS.

G Operational Error (Explairi)

II- Other (Explain)

l l I l . .

l l- Joseph M. Farley Nuclear Plant

! Unit 2 Narrative Summary of Operations l-February 1996 There were no unit shutdowns or major power reductions during the month.

l There was no major safety.related maintenance performed during the month. <

Chemistry flush of Steam Generators was completed and the unit was returned  ;

to 100% reactor power at 0316 on February 2,1996.

l l

1 l

l i

1

. . . - , m -- ..,4 . -

  • l

. . \

~

OPERATING DATA REPORT DOCKET NO. 50-364 DATE March 8,1996 COMPLETED BY M. W. McAnulty TELEPIIONE (334) 899-5156, ext.3640 QPERATINGETATUS

1. Unit Name: Joseph M. Farley - Unit 2 Notes
2. Reporting Period: February 1996 1) Cumulative data since 07-30-81,
3. Licensed Thermal Power (MWt): 2,652 date of commercial operation.
4. Nameplate Rating (Gross MWe): 860
5. Design Electrical Rating (Net MWe): 829
6. Maximum Dependable Capacity (Gross MWe) 863.6
7. Maximum Dependable Capacity (Net MWe): 822
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Smce Last Report, Give Reasons: N/A
9. Power Level To Which Restricted, If Any (Net MWe): N/A
10. Reasons For Restrictions,If Any: N/A This Month Yr.to Date Cumulative
11. Hours in Reporting Period 696.0 1,440.0 127,873.0
12. Number Of Hours Reactor Was Critical 696.0 1,440.0 110,343.4
13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0
14. Hours Generator On-line 696.0 1,440.0 108,650.2
15. Unit Reserve Shutdown Hours _

0.0 0.0 0.0

16. Gross Thermal Energy Generated (MWH) 1,809,698.3 3,677,448.9 276,651,239.3
17. Gross Electrical Energy Generated (MWH) 600,264.0 1,217,767.0 90,680,246.0
18. Net Electrical Energy Generated (MWH) 571,772.0 1,158,833.0 85,972,484.0
19. Unit Service Factor 100.0 100.0 85.0
20. Unit Availabilty Factor 100.0 100.0 85.0
21. Unit Capacity Factor (Using MDC Net) 99.9 97.9 82.0
22. Unit Capacity Factor (Using DER Net) 99.1 97.1 81.1
23. Unit Forced Outage Rate 0.0 0.0 3.9
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A

25. If Shut Down at End Of Report Period, Estimated Date of Startup: N/A
26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved Initial Criticality 05/06/81 05/08/81 Initial Electricity 05/24/81 05/25/81 Commercial Operation 08/01/81 07/30/81

DOCKET NO. 50-364 UNIT 2 DATE March 8,1996 M. W. McAnulty COMPLETED BY TELEPHONE (334) 899-5156 ext 364 MONTH February M

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) - ,

i 1 349 17 843 2 834 18 842 3- 844 19 837 l 4 844 20 836 5 845 21 836 6 845 22 ,35 i

7 843 23 831 8 840 24 834

\

9 835 25 837 10 837 26 833 11 835 27 834 l l

12 843 28 832  !

13 843 29 842 i

14 839 30 N/A i 15 834 31 N/A 16- jt42 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute in the nearest whole megawatt.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-364 l

- '* UNIT NAME J. M. Farley - Unit 2 l DATE March 8,1996 COMPLETED BY M. W. McAnuity REPORT MONT February TELEPHONE (134) 899-5156, ext.3640 .

I i

R. M )

E E S A j T T Y Y S 11 SC 'f l

P O O TO CAUSE AND CORRECTIVE E DURATION N D ED COMPONENT ACTION TO

- NO. DATE (1) (IIOURS) (2) (3) LER# ME CODE (5) PPEVENT RECURRENCE l There were nO Shutdowns Or power reductions during the month.

l l

1 t

t l

i i

I i

I: 2: 3: EVENTS REPORTED l F: Forced Reason Method INVOLVE A +

S: Scheduled A Equipment Failure (Explain) 1 Manual GREATER TilAN 20%

B - Maintenance or Test 2 - Manual Scram - REDUCTION!N l C- Refueling 3 - Automatic Scram AVERAGE DAILY [

D Regulatory Restriction 4 -Other (Explain) POWER LEVEL FOR E - Operator Training & License Examination Tile PRECEDING 24 i F - Administratis e llOURS.

G OperationalError(Explain) l 11 Other(Explain)