Monthly Operating Repts for Sept 1997 for Jm Farley Nuclear Plant Units 1 & 2
ML20211N722
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 09/30/1997
From: Mcanulty M, Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9710170082
Download: ML20211N722 (9)


Text

. _ _ - _ _ _ _ _ _ _ _ _ _ ___ .-

  • Dave Merey Southern Nucleat Ste Pseudent Operating Company fatley Project PD. Box 1795 Birmirgham. Alatiama 35201 Tel 205 997 $131 SOUTHERN COMPANY October 10, 1997 Docket Nos. 50448

$0464 U. S. Nuclear Regulatory Commission ATrN: Document Control Desk Washington, D C 20555 Joseph M. Farley Nuclear Plant Monthly Operating Report Ladies and Gentlemen:

Attached are the September 1997 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units I and 2, as acquired by Section 6.9.1.10 of the Technical Specifications, if you have any questions, please advise.

Respectfully submitted, 81/1 }/lcu /

Dave Morty -

RWC:(mor)

Attachments cc: Mr. L. A. Reyes, Region 11 Administrator '

p Mr. J.1. Zimmerman, NRR Project Manager Mr. T. M. Ross, FNP Sr. Resident inspector [/Gh( ,

9710170002 970930 PDR ADOCK 05000148 llli,Illll1,18!Illll

i NARRATIVE

SUMMARY

OF OPERATIONS i

DOCKET NO. 50-348

. UNIT NAME J. M. Farley - Unit 1

, DATE October 6,1997 l COMPLETED BY M. W. McAnulty REPORTMONTH _ September TELEPilONE J334) 899 5156, ext.3640

- There were no unit shutdowns or power reductions during the month.

There was no ,.,r safety related maintenance performed during the month.

--I '

d

= =-s. = = = -

OPERATING ' DATA REPORT DOCKET NO. 50-348 DATE October 6,1997 COMPLETED BY M. W. McAnulty TELEPilONE (334) 899-5156, ext.3640 OPEinDNGliTATUS

1. Unit Narr Joseph M. Farley - Unit 1 Notes
2. Reporting Period: September 1997 1) Cumulative data since 12-01-77,
3. Licmsed Thermal Power (MWt): 2,6E date of commercial operation.

<$. Nameplate Rating (Gross MWe): 86.

5. Design Electrical Rating (Nr.t MWe): 829
6. Maxinam Dependable Capacity (Gross MWe): _866
7. Maximum Dependable Capacity (Net MWe): 822
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) smce Last Report, Give Reasons: N/A
9. ~ Power Level To Which Restricted, If Any (Net MWe): N/A
10. Reasons For Restrictions,If Any: N/A This Month Yr. to Date Cumulative
11. Hours in Reporting Period __

720.0 6,551.0 173,855.0

12. Number Of Hours Reactor Was Critical 720.0 _

4,627.9 140,0_72.6

13. Reactor Reserve Shutdmvn Hours 0.0 01 3,650.0
14. Ik urs Generator On-line 720.0 4,594.7 138,010.4
15. Unit Reserve Snutdown Hours 0.0 0.0_ 0.0
16. Gross Thermal Energy Generated (MWH) 1,908,697.4 11,798,426.9 355,517,433.3 17, Gross Electrical Energy Generated (MWH) 621.356.0 3,836,530.0 114,848,108.0
18. Net Electrical Energy Generated (MWH) 590,214.0 __L615,658.0 108,497,614.0
19. Unit Service Factor 100.0 70.1 79.4
- 20. Unit Availability Factor 100.0 70.l_ 79.4
21. Unit Capacity Factor (Using MDC Net) 99.7 67.1 76.6
22. Unit Capacity Factor (Using DER Net) 98.9 66.6 75.3
23. Unit Forced Outage Rate 0.0 0.0 5.4
24. Shutdowns Scheduled Over Next 6 Minths (Type, Date, and Duration of Each):

~25. If Shut Down at End Of Report Period, Estimated Date of Startup: N/A

26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved l l

Initial Criticality _ ]!/A _

N/A l Initial Electricity N/A N/A l Commercial Operation N/A N/A

1 DOCKET NO. 50-348-UNIT 'I )

DATE October 6,1997

.l COMPLETED BY - M. W. McAnulty 2 TELEPHONE _(334) 899 5156 e:t 3640 ,

MONTil September DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 817 17- 819 2 818 18 819

-3 817 19 819 4 81d 20 808 5 826 21 819 6 825 22 _

816 7 _

824 23 817 8 821 24 816 9 820 25- 817 10 820 26 825 11 823 27 822 12 822 28 822-13 819 29- 819 14 820 30 824 15 822 31 N/A 16 821

- INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.

/ -*

UNIT SHUTDOWNS AND POWER REDUCTIONS i- DOCKET NO. 50-348 UNIT NAME J. M. Farley - Unit 1

- ~.

DATE October 6,1997

. COMPLETED BY M. W. McAnuity_

REPORTMONTil September TELEPHONE (331) 899-5156, ext.3640 l, E E S T A T Y Y S P SC P O e TO CAUSE AND CORRECTIVE E DURATION N D ED COMPONWT ACrlON TO NO. DATE (1) (ItOURS) (2) (3) LERf ME CODE ($) PREVENT RECURRENCE L

i There were nO ShiiidOwns er power reductions during the month.

4 1

I 4

e 4

I i

4 5

! l

1
2: 3: EVENTS REPORTED

- F:Ferced Reason Method INVOLVE A S: Scheduled . A Equipment FaEure(Explain) 1 Manual GREATER TilAN 20%

B MaintenanceorTest 2. Manual Scram REDUCTION IN C. Refueling 3. Autora. tic Scram AVERAGE DAILY

! D. Regulatory Restriction d .Other (Explain) POWER LEVEL FOR E Operator Training & License Examination TIIE PRECEDINO 24

i. F. Administrative llOURS.

G.Operatinal Error (Explain)

II.Other(Explain) l

.)

NARRATIVE

SUMMARY

OF OPERATIONS

- DOCKET NO. - 50-364 l , - UNIT NAME - J. M. Farley - Unit 2

, DATE October 6,1997 COMPLETED BY M. W. McAnulty

. REPORT MONTH September TELEPHONE (334) 899 5156, ext.3640 1

1 4'

l There were no unit shutdowns or power reductions during the month.

There was no major safety related maintenance performed during the month.

p 3

1 i

4 4

5 9 m. r---r

OPERATING DATA REPORT DOCKET NO. 50-364 )

DATE October 6,1997 COMPLETED BY M. W. McAnuity TELEPilONE (334) 899-5156, ext.3640 OPERATLNG STATUS

1. Unit Name: Joseph M. Farley - Unit 2 Notes
2. Reporting Period: September 1997 1) Cumulative data since 07-30-81,
3. Licensed Thermal Power (MWt): 2,652 date of commercial operation.
4. Nameplate Rating (Gross MWe): 860
5. Design Electrical Rating (Net MWe): 829
6. Maximum Dependable Capacity (Gross MWe): 863.6
7. Maximum Dependable Capacity (Net MWe): 822 L
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Smce Last Report, Give Reasons: N/A
9. Power Level To Which Restricted, if Any (Net MWe): N/A
10. Reasons For Restrictions,if Any: N/A This Month Yr. to Date Cumulative
11. Hours in Reporting Period 720.0 6,551.0 141,768.0
12. Number Of Hours Reactor Was Critical 720.0 6,551.0 122,668.0
13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0
14. Hours Generator On-line 720.0 6,551.0 120,921.9
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1,909,440.0 17,276,347.9 308,724,442.1
17. Gross Electrical Energy Generated (MWH) 627,254.0 5,698,616.0 101,212,914 0
18. Net Electrical Energy Generated (MWH) 597,456.0 5,430,026.0 95,980,482.0
19. Unit Service Factor 100.0 100.0 85.3
20. Unit Availability Factor 100.0 100.0 85.3
21. Unit Capacity Factor (Using MDC Net) 100.9- 100.8 82.5
22. Unit Capacity Factor (Using DER Net) 100.1 100.0 81.7
23. Unit Forced Outage Rate 0.0 0.0 3.6
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueling Outage scheduled for March 28,1998 with a duration of 52 days.

25. If Shut Down at End Of Report Period, Estimated Date of Startup: N/A
26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved Initial Criticality N/A N/A Initial Electricity N/A N/A Commercial Operation N/A N/A l

l I

. . - ._ . . . - .~ . - _ - .

DOCKET NO. 50-364' UNIT 2 DATE October 6,1997 COMPLETED BY M. W. McAnuity

, l* TELEPHONE -(334) 899-5156 ext 36e MONTH September DAY- AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net; I 827 17 827 2 829 18 829 3 827 19 827 4 827 20 828 5 836 21 827 6 835 22 825 7 837 23 824 8 834 24 824 9 830 25 -825 10 830 26- _

836 11 832 27 832 12 832- 28 832 13 830 29 829 14 'S31 30 833 15 833 31 N/A 16 830 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.

. UNIT SIIUTDOWNS AND POWER REDUCTIONS

,4 DOCKET NO. 50-364 UNIT NAME J. M. Farley . Unit 2 DATE October 6,1997 COMPLETED BY M. W. McAnulty REPORTMONT11 September TELEPHONE (334)899-5156, ext.3640 l

R M l

E E S T A T Y Y S H SC P O O TO CAUSE AND CORRECTIVE ,

E DURATION N D ED COMPONENT ACTION TO NO. DATE (1) (llOURS) (2) (3) LER # ME CODE (5) PREVENT RECURRENCE Tilere were no Shutdowns Or power reductions during the month.

1: 2: 3: EVENTS REPORTED F: Forced Reason Method INVOLVE A S: Scheduled A- Equipment Failure (Explain) 1 - Manual GREATER TilAN 20%

B - Maintenance or Test 2 Manual Scram REDUCTION IN C Refueling 3 - Automatic Scrarr. AVERAGE DAILY D Regulatory Restriction 4 Other(Explem) POWER LEVEL FOR E Operator Training & License Examination . TIIE PRECEDINO 24 F Administrative llOURS.

O OperationalError(Explain)

II Other(Explain) i l

e-- _

. - - . -