Text
--_.. - _ - _ - _ -. _ - -
- ~* ' '.
Dave Mirey S:uthern Nuclear Y
Vice President Operating Compny Farley Project P.O. Box 1295 Birmingham, Alabama 35201 Tel 205.992.5131 SOUTHERN h June 11, 1998 COMM I
Energy toServeYourWorld" Docket Nos.
50-348 50-364
{
U. S. Nuclear Regulatory Commission ATfN: Document Control Desk l
Washington, D C 20555 Joseph M. Farley Nuclear Plant Monthly Operating Report Ladies and Gentlemen:
Enclosed are the May 1998 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2. as required by Section 6.9.1.10 of the Technical Specifications.
If you have any questions, please advise.
Respectfully submitted, l
Dave Morey i
RWC:(mor) s Enclosures El - May Monthly Operating Report for Plant Farley Unit I h
E2 - May Monthly Operating Report for Plant Farley Unit 2 cc: Mr. L. A. Reyes, Region II Administrator Mr. J.1. Zimmerman, NRR Project Manager l
Mr. T. M. Ross, FNP Sr. Resident inspector 1
8 R
i L.
OPERATING DATA REPORT DOCKET NO.:
50-348 UNIT NAME:
J. M. Farley - Unit 1 DATE:
June 4,1998 COMPLETED BY:
R. W. Clouse TELEPHONE:
(205) 992-5732 I
OPERATING. STATUS
)
1.
Reporting Period:
May 1998 2.
Design Electrical Rating (Net MWe):
829 3.
Maximum Dependable Capacity (Net MWe):
822 This Month Yearto Date Cumulative 4.
Number Of Hours Reactor Was Critical:
744.0 3,623.0
_ 145,904.6 5.
Hours Generator On-line:
744.0 3,623.0 143,842.4 6.
Unit Reserve Shutdown Hours:
0.0 0.0 0.0 7.
Net Electrical Energy Generated (MWH):
609,047.0 2,989,804.0 113,290,132.0 CIIALLENGES TO PRESSURIZER PORY OR PRESSURIZER SAFETY VALVES Date i Iag No.
i Event Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.
El-1
~
UNIT SHUTDOWNS DOCKET NO.:
50-348 UNIT NAME:
J. M. Farley - Unit 1 DATE:
June 4,1998 COMPLETED BY:
R. W. Clouse REPORrlNG PERIOD: May_1998 TELEPHONE:
(205) 992-5732 Type Method of F: Forced Duration Reason Shutting Down Cause/ Corrective Actions No.
Date S: Scheduled (Hours)
(1)
(2)
Comments There were no unit shutdowns during the month.
(I) KLASUN.
(2) MLI&IUU.
A Equipment Failure (Explain) 1 - Manual B Maintenance orTest 2 ManualTrip/ Scram C Refueling 3 - Automatic Trip / Scram D - Regulatory Restriction 4 Continuation E - Operator Training / License Examination 5 Other(Explain)
F-Administrative G - operational Enor (Explain)
H Other(Explain)
CAUSE/ CORRECTIVE ACTION / COMMENTS l
NARRATIVE REPORT Following the 'l A' SGFP trip, at 1430 on 980521, with the unit operating at 100% reactor power, the unit was ramped to 60% reactor power to repair a broken wire to the 'l A' SGFP thrust bearing monitor. The wire was repaired and unit was returned to 100% power at 2348 on 980521.
l El-2 l
l_
I-l
OPERATING DATA REPORT DOCKET NO.:
5_0-364 UNIT NAME:
_ J. M. Farley - Unit 2 _
DATE:
June 4,1998 COMPLETED BY:
R. W. Clouse TELEPIIONE:
(205) 992-5732 OPERATING STATUS 1.
Reporting Period:
May 1998 2.
Design Electrical Rating (Net MWe):
829 3.
Maximum Dependable Capacity (Net MWe):
828 This Month Year.to.Date Cumulative 4.
Number Ofliours Reactor Was Critical:
349.0 2,414.4 127,331.4 5.
Hours Generator On-line:
312.4 2,377.5 125,508.4 6.
Unit Reserve Shutdown Hours:
0.0 0.0 0.0 7.
Net Electrical Energy Generated (MWH):
210,879.0 1,943,029.0 99,774,393.0 CIIALLENGES TO PRESSURIZER PORV OR PRESSURIZER SAFETY VALVES Date i Tag No.
I Event Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.
i l
l l
l E2-1
UNIT SHUTDOWNS DOCKET NO.:
50-364 UNIT NAME:
J. M. Farley - Unit 2 DATE:
June 4,1998 COMPLETED HY:
R. W. Clouse REPORTING PERIOD: May 1998 TELEPilONE:
(205)992-5732 Type Method of F: Forced Duration Reason Shutting Down Cause/ Corrective Actions No.
Date S: Scheduled (Hours)
(1)
(2)
Comments 001 980328 S
431.6 C
1 lThe twelfth refueling outage was completed on 980518.
(1) KLASUN.
(2) MLillUU.
A Equipment Failure (Explain) 1 - Manual H - Maintenance or Test 2 - Manual Trip / scram C Refueling 3 - Automatic Trip / Scram D Regulatory Restriction 4 - Continuation E - operator Training / License Examination 5 -other (Explain)
F Administrative G -operational Error (Explain) 11-other (Explain)
CAUSE/ CORRECTIVE ACTION / COMMENTS NARRATIVE REPORT The reactor was manually tripped on 980512, when the control rod K-2 dropped into the core during control rod operability testing. The reactor was also manually tripped on 980515, when control rod F-10 dropped into the core during low power physics testing. Reference LER 98-001-01 (Unit 2).
On 980518 at 2334 the U2RF12 outage was completed and the generator synchronized to the grid. On 980523 Unit 2 was returned to 100% power. Power uprate modifications were completed during the outage.
E2-2
- _ _ _ _ _ _ _ - _ _ _ _ _ -.