From: Clouse R, Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9806150282
Download: ML20248M312 (5)


Text

--_.. - _ - _ - _ -. _ - -

  • ~* ' '.

Dave Mirey S:uthern Nuclear Y

Vice President Operating Compny Farley Project P.O. Box 1295 Birmingham, Alabama 35201 Tel 205.992.5131 SOUTHERN h June 11, 1998 COMM I

Energy toServeYourWorld" Docket Nos.

50-348 50-364

{

U. S. Nuclear Regulatory Commission ATfN: Document Control Desk l

Washington, D C 20555 Joseph M. Farley Nuclear Plant Monthly Operating Report Ladies and Gentlemen:

Enclosed are the May 1998 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2. as required by Section 6.9.1.10 of the Technical Specifications.

If you have any questions, please advise.

Respectfully submitted, l

Dave Morey i

RWC:(mor) s Enclosures El - May Monthly Operating Report for Plant Farley Unit I h

E2 - May Monthly Operating Report for Plant Farley Unit 2 cc: Mr. L. A. Reyes, Region II Administrator Mr. J.1. Zimmerman, NRR Project Manager l

Mr. T. M. Ross, FNP Sr. Resident inspector 1

8 R

i L.

OPERATING DATA REPORT DOCKET NO.:

50-348 UNIT NAME:

J. M. Farley - Unit 1 DATE:

June 4,1998 COMPLETED BY:

R. W. Clouse TELEPHONE:

(205) 992-5732 I

OPERATING. STATUS

)

1.

Reporting Period:

May 1998 2.

Design Electrical Rating (Net MWe):

829 3.

Maximum Dependable Capacity (Net MWe):

822 This Month Yearto Date Cumulative 4.

Number Of Hours Reactor Was Critical:

744.0 3,623.0

_ 145,904.6 5.

Hours Generator On-line:

744.0 3,623.0 143,842.4 6.

Unit Reserve Shutdown Hours:

0.0 0.0 0.0 7.

Net Electrical Energy Generated (MWH):

609,047.0 2,989,804.0 113,290,132.0 CIIALLENGES TO PRESSURIZER PORY OR PRESSURIZER SAFETY VALVES Date i Iag No.

i Event Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.

El-1

~

UNIT SHUTDOWNS DOCKET NO.:

50-348 UNIT NAME:

J. M. Farley - Unit 1 DATE:

June 4,1998 COMPLETED BY:

R. W. Clouse REPORrlNG PERIOD: May_1998 TELEPHONE:

(205) 992-5732 Type Method of F: Forced Duration Reason Shutting Down Cause/ Corrective Actions No.

Date S: Scheduled (Hours)

(1)

(2)

Comments There were no unit shutdowns during the month.

(I) KLASUN.

(2) MLI&IUU.

A Equipment Failure (Explain) 1 - Manual B Maintenance orTest 2 ManualTrip/ Scram C Refueling 3 - Automatic Trip / Scram D - Regulatory Restriction 4 Continuation E - Operator Training / License Examination 5 Other(Explain)

F-Administrative G - operational Enor (Explain)

H Other(Explain)

CAUSE/ CORRECTIVE ACTION / COMMENTS l

NARRATIVE REPORT Following the 'l A' SGFP trip, at 1430 on 980521, with the unit operating at 100% reactor power, the unit was ramped to 60% reactor power to repair a broken wire to the 'l A' SGFP thrust bearing monitor. The wire was repaired and unit was returned to 100% power at 2348 on 980521.

l El-2 l

l_

I-l

OPERATING DATA REPORT DOCKET NO.:

5_0-364 UNIT NAME:

_ J. M. Farley - Unit 2 _

DATE:

June 4,1998 COMPLETED BY:

R. W. Clouse TELEPIIONE:

(205) 992-5732 OPERATING STATUS 1.

Reporting Period:

May 1998 2.

Design Electrical Rating (Net MWe):

829 3.

Maximum Dependable Capacity (Net MWe):

828 This Month Year.to.Date Cumulative 4.

Number Ofliours Reactor Was Critical:

349.0 2,414.4 127,331.4 5.

Hours Generator On-line:

312.4 2,377.5 125,508.4 6.

Unit Reserve Shutdown Hours:

0.0 0.0 0.0 7.

Net Electrical Energy Generated (MWH):

210,879.0 1,943,029.0 99,774,393.0 CIIALLENGES TO PRESSURIZER PORV OR PRESSURIZER SAFETY VALVES Date i Tag No.

I Event Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.

i l

l l

l E2-1

UNIT SHUTDOWNS DOCKET NO.:

50-364 UNIT NAME:

J. M. Farley - Unit 2 DATE:

June 4,1998 COMPLETED HY:

R. W. Clouse REPORTING PERIOD: May 1998 TELEPilONE:

(205)992-5732 Type Method of F: Forced Duration Reason Shutting Down Cause/ Corrective Actions No.

Date S: Scheduled (Hours)

(1)

(2)

Comments 001 980328 S

431.6 C

1 lThe twelfth refueling outage was completed on 980518.

(1) KLASUN.

(2) MLillUU.

A Equipment Failure (Explain) 1 - Manual H - Maintenance or Test 2 - Manual Trip / scram C Refueling 3 - Automatic Trip / Scram D Regulatory Restriction 4 - Continuation E - operator Training / License Examination 5 -other (Explain)

F Administrative G -operational Error (Explain) 11-other (Explain)

CAUSE/ CORRECTIVE ACTION / COMMENTS NARRATIVE REPORT The reactor was manually tripped on 980512, when the control rod K-2 dropped into the core during control rod operability testing. The reactor was also manually tripped on 980515, when control rod F-10 dropped into the core during low power physics testing. Reference LER 98-001-01 (Unit 2).

On 980518 at 2334 the U2RF12 outage was completed and the generator synchronized to the grid. On 980523 Unit 2 was returned to 100% power. Power uprate modifications were completed during the outage.

E2-2