Text

. ~ - . . . . . . . .. -. -. - - -- -,.

  • Southarn Nucitar Operating Company i

, Post Offica Box 1205

  • Birmingham, Alabama 35201 Telephone (205) 868-5131 J

o.ve morey Southern Nudear Operating Company Vice President Fariey Project the Southem elecinc system July 9, 1996 Docket Nos. 50-348 50-364 l

l U. S. Nuclear Regulatory Commission )

i ATTN: Document Control Desk l

Washington, D C 20555 )

Joseph M. Farley Nuclear Plant Monthly Operating Report

Ladies and Gentlemen

l Attached are the June 1996 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2, as required by Section 6.9.1.10 of the Technical Specifications.

I lf you have any questions, please advise.

Respectfully submitted,

//14t Dave Morey l RWC:(mor) l Attachments cc: Mr. S. D. Ebneter, Region 11 Administrator Mr. B. L. Siegel, NRR Senior Project Manager Mr. T. M. Ross, FNP Resident inspector hD DO K 05 0 48 i R PM 4

\ \

qt4 .

e t Joseph M. Farley Nuclear Plant Unit 1 l Narrative Summary of Operations June 1996 At 1800 on June 16,1996, with the unit operating in mode 1 at 100% reactor power, the unit was ramped down to 55% reactor power to repair the Main Generator Terminal Bus Cooling Fan.

All repairs were completed and the unit was retumed to 100% reactor power at 0727 on June 17,1996.

i l

There was no major safety related maintenance performed during the month. j l

L I

l l

l i

i I-

OPERATING DATA REPORT DOCKET NO. 50-348 DATE July 5,1996 COMPLETED BY M. W. McAnulty TELEPHONE (334) 899-5156, ext. 3640 QPERATINGSTATES

1. Unit Name: Joseph M. Farley - Unit 1 Notes
2. Reporting Period: June 1996 1) Cumulative data since 12-01-77,
3. Licensed Thermal Power (MWt): 2,652 date of commercial operation.
4. Nameplate Rating (Gross MWe): 860
5. Design Electrical Rating (Net MWe): 829
6. Maximum Dependable Capacity (Gross MWe) 855.7
7. Maximum Dependable Capacity (Net MWe): 812 _
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Smce Last Report, Give Reasons: N/A
9. Power Level To Which Restricted, If Any (Net MWe): N/A
10. Reasons For Restrictions,If Any: N/A This Month Yr. to Date Cumulative
11. Hours in Reporting Period 720.0 4,367.0 162,887.0
12. Number Of Hours Reactor Was Critical 720.0 4,338.3 131,027.7 l
13. Reactor Reserve Shutdown Hours 0.0 0.0 3,650.0
14. Hours Generator On-line 720.0 4,323.0 128,998.7
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1,897,153.3 11,294,719.6 332,049,092.5
17. Gross Electrical Energy Generated (MWH) 617,575.0 3,710,528.0 107,202,682.0
18. Net Electrical Energy Generated (MWH) 586,359.0 3,524,426.0 101,264,078.0
19. Unit Service Factor 100.0 99.0 79.2 l
20. Unit Availability Factor 100.0 99.0 79.2
21. Unit Capacity Factor (Using MDC Net) 100.3 99.4 76.6 l
22. Unit Capacity Factor (Using DER Net) 98.2 97.4 75.0
23. Unit Forced Outage Rate 0.0 0.0 5.7
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
25. If Shut Down at End Of Report Period, Estimated Date of Startup: N/A l 26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved i

! Initial Criticality 08/06/77 08/09/77

Initial Electricity 08/20/77 08/18/77 i

Commercial Operation 12/01/77 12/01/77

- . ~ ..- . . - - - . -

.. UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-348 UNIT NAME J. M. Farley - Unit 1 DATE July 5,1996 COMPLETED BY M. W. McAnulty REPORT MONTil June TELEPHONE (334) 899-5156, ext. 3640 j R M l E E S T A T Y Y S 11 SC P O O TO CAUSE AND CORRECTIVE E DURATION N D ED COMPONENT ACTION TO NO. DATE (1) (llOURS) (2) (3) LER # ME CODE (5) PREVENT RECURRENCE M 9606f6~F~ 0 ]~A 1 N/A TB -FXN

~

At l'800Ms6661~63i~ tlithe unit operating in mode 1 at 100% reactor power, the unit was ,

ramped down to 55% reactor power to repair the Main Generator Terminal Bus Cooling Fan.

All repairs were completed and the unit was returned to 100% reactor power at 0727 on 960617.

'l ,

i l

l 1

l i

. - - - _ . . . . - l 1: 2: 3: EVENrSREPORTED

F
Forced Reason Method INVOLVE A S: Scheduled A - Equipment Failure (Explain) 1 - Manual GREATER TilAN 20%

D Maintenance orTest 2 - Manual Scram REDUCTION IN C Refueling 3 - Automatic Scram AVERAGE DAILY ,

D Regulatory Restriction 4 -Other (Explain) POWER LEVEL FOR I i E - Operator Training & License Examination Tile PRECEDING 24 l

F- Administrative ilOURS.

G Operational Error (Explain) f 11 Other(Explain) l l

1 DOCKET NO. 50-348 _

UNIT 1

.. DATE July 5,1996 COMPLETED BY M. W. McAnuity TELEPHONE (334) 899-5156 ext. 3640 MONTH June DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 _

823 17 744 2 824 18 818 3 826 19 820 4 824 20 814 5 823 21 819 ,

6 823 22 816  :

7 822 23 815  ;

8 822 24 813 9 823 25 814 10 823 26 814 11 823 27 816 12 820 28 824 13 811 29 823 14 822 30 821 15 820 31 N/A _

16 736 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.

i l

l

^

l 1

i Joseph M. Farley Nuclear Plant l

Unit 2 l Narrative Summary of Operations l

! June 1996 At 1845 on June 20,1996, with the unit operating in mode 1 at 100% reactor power, the unit began a ramp down due to entry into Technical Specification (TS) -

3.0.3 action statement as a result of not meeting all surveillance requirements for the reactor protection system. The ramp down was stopped at 75% reactor power I and TS 3.0.3 was exited after an enforcement discretion was granted by the NRC. )

The unit was returned to 100% reactor power at 0100 on June 21,1996.

There was no major safety related maintenance performed during the month. l l

l l

l .

I i

i I

i i

4

1 OPERATING DATA REPORT DOCKET NO. 50-364 l

.o DATE July 5,1996 COMPLETED BY M. W. McAnulty TELEPHONE (334) 899-5156, ext. 3640 OPERATING STATUS

1. Unit Name: Joseph M. Farley - Unit 2 Notes 1
2. Reporting Period: June 1996 1) Cumulative data since 07-30-81,
3. Licensed Thermal Power (MWt): 2,652 date of commercial operation. i
4. Nameplate Rating (Gross MWe): 860 )
5. Design Electrical Rating (Net MWe): 829 I
6. Maximum Dependable Capacity (Gross MWe) 863.6 )
7. Maximum Dependable Capacity (Net MWe): 822  ;
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Smce l

Last Report, Give Reasons: N/A l 1

9. Power Level To Which Restricted, If Any (Net MWe): N/A l
10. Reasons For Restrictions,If Any: N/A This Month Yr. to Date Cumulative
11. Hours in Reporting Period 720.0 4,367.0 130,800.0
12. Number Of Hours Reactor Was Critical 720.0 4,367.0 113,270.4
13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0
14. Hours Generator On-line 720.0 4,367.0 111,577.2
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1,907,026.7 11,192,315.3 284,166,105.7
17. Gross Electrical Energy Generated (MWH) 621,749.0 3,681,435.0 93,143,914.0
18. Net Electrical Energy Generated (MWH) 591,989.0 3,502,055.0 88,315,706.0
19. Unit Service Factor 100.0 100.0 85.3
20. Unit Availability Factor 100.0 100.0 85.3
21. Unit Capacity Factor (Using MDC Net) 100.0 97.6 82.4
22. Unit Capacity Factor (Using DER Net) 99.2 96.7 81.4
23. Unit Forced Outage Rate 0.0 0.0 3.8
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueling Outage scheduled for October 12,1996 with a duration of 47 days

25. If Shut Down at End Of Report period, Estimated Date of Startup: N/A
26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved Initial Criticality 05/06/81 05/08/81 Initial Electricity 05/24/81 05/25/81 Commercial Operation 08/01/81 07/30/81

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-364 UNIT NAME J. M. Farley . Unit 2 DATE July 5,1996 COMPLETED BY M. W. McAnulty REPORT MONTil June TELEPilONE (334) 899-5156, ext. 3640 R M ~-l E E S T A T Y Y S II sC P o o To CAUSE AND CORRECTIVE E DURATION N D ED COMPONENT ACTION To No. DATE (1) (IIOURs) (2) (3) LER # ME CODE ($) PREVENT RECURRENCE

~

009 V60820~F 0 D 4"9610(Mili)TJC HS At 1845 on 960620, with the unit in mode 1 operating at 100% reactor power, the unit began a ramp down due to entry into Technical Specification (TS) 3.0.3 action statement as a result of not meeting all surveillance requirements for the manual safety injection input into the reactor protection system. The ramp down was stopped at 75% reactor power and TS 3.0.3 was exited after an enforcement discretion was granted by the NRC, pending a one time TS change for the current operating cycle.

The unit returned to 100% reactor power at 0100 on 960621.

i l

__._ =ll i 1: 2: 3: EVENTS REPORTED F: Forced Reason Method INVOLVE A S: Scheduled A - Equipment Failure (Explain) 1 - Manual GREATER TilAN 20%

B - Maintenance or Test 2 - Manual Scram REDUCTION IN C . Refueling 3 - Automatic Scram AVERAGE DAILY

D - Regulatory Restriction 4 - other (Explain) POWER LEVEL FoR E - operator Training & License Examination TIIE PRECEDING 24 F Administrative llOURS.

G - operational Error (Explain)

II- other (Explain)

i .

  • I DOCKET NO. 50-364 UNIT 2 DATE July 5,1996 COMPLETED BY M. W. McAnulty_

TELEPHONE (334) 899-5156 ext. 3640 MONTH June DAY AVERAGE DAILY POWER LEVEL DAY. AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 825 17 825 2 826 18 824 3 826 19 823 4 826 20 795 5 826 21 821 6 826 22 818 8

7 824 23 818 8 824 24 819 9 826 25 819

]

10 826 26 819 11 827 27 821

'12 822 28 829 13 813 29 828 14 825 30 t' 825 15 823 31 N/A

( 16 825 i

INSTRUCTIONS l On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt. ~

I

. , . . _ .- . ,. - , .-. - _ - . - . - - - - - - -i