MONTHYEARML20217G0361999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20212E7451999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Hcgs,Unit 1.With Summary of Changes,Tests & Experiments Implemented During Aug 1999.With ML20216E4941999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Jmfnp.With ML20210R6031999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With L-99-267, Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20209G0661999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With L-99-023, Monthly Operating Repts for May 1999 for Jfnp Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Jfnp Units 1 & 2. with L-99-020, Monthly Operating Repts for Apr 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With L-99-161, Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20205N0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20207M6421999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20203A2651999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20199E6591998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20198B2561998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20195C9681998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20154H6001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20197C8991998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20237B1891998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20236M5981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20248M3121998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20247F3631998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20216D5941998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Joseph M Farley Nuclear Plant,Units 1 & 2 ML20216D9811998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20202G4211998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20198L6191997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Jm Farley Nuclear Plant,Units 1 & 2 ML20203F6391997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Jm Farley Nuclear Plant,Units 1 & 2 ML20198T4151997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Jm Farley Nuclear Plant ML20211N7221997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Jm Farley Nuclear Plant Units 1 & 2 ML20216J3151997-08-31031 August 1997 Monthly Operating Repts for August 1997 for Jfnp ML20210K5981997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Jm Farley Nuclear Plant,Units 1 & 2 ML20141H3191997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Joseph M Farley Nuclear Plant Units 1 & 2 ML20148K6081997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Joseph M Farley Nuclear Plant ML20141E3121997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Jm Farley Nuclear Plant Units 1 & 2 ML20137T1841997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Jm Farley Nuclear Plant Units 1 & 2 ML20136G4731997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Jm Farley Plant Units 1 & 2 ML20138K5881997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Jm Farley Nuclear Plant Units 1 & 2 ML20133F4791996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20132C0631996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20134K7141996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20128Q1161996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Jm Farley Nuclear Plant,Units 1 & 2 ML20117M1291996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20116J6421996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20115D6821996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20117M2721996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20111D1401996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Jm Farley Plant Units 1 & 2 ML20101R6271996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Jm Farley Nuclear Plant ML20106H0791996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Jm Farley Nuclear Plant ML20097D5651996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Jm Farley Nuclear Plant ML20096C0921995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Jm Farley Nuclear Plant Units 1 & 2 ML20095E9451995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Joseph M Farley Nuclear Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217P0761999-10-0606 October 1999 Non-proprietary, Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs ML20217G0361999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20212E7451999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Hcgs,Unit 1.With Summary of Changes,Tests & Experiments Implemented During Aug 1999.With ML20216E4941999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Jmfnp.With ML20210T2161999-08-0606 August 1999 Draft SE Supporting Proposed Conversion of Current TS to ITS for Plant ML20211B2011999-08-0404 August 1999 Informs Commission About Results of NRC Staff Review of Kaowool Fire Barriers at Farley Nuclear Plant,Units 1 & 2 & Staff Plans to Address Technical Issues with Kaowool & FP-60 Barriers ML20210R6031999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20196J3791999-06-30030 June 1999 Safety Evaluation of TR WCAP-14750, RCS Flow Verification Using Elbow Taps at Westinghouse 3-Loop Pwrs. Rept Acceptable ML20209G0661999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With L-99-267, Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With L-99-023, Monthly Operating Repts for May 1999 for Jfnp Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Jfnp Units 1 & 2. with ML20206G7471999-05-0404 May 1999 Safety Evaluation Accepting Corrective Actions Taken by SNC to Ensure That Valves Perform Intended Safety Functions & Concluding That SNC Adequately Addressed Requested Actions in GL 95-07 L-99-020, Monthly Operating Repts for Apr 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20206C9461999-04-30030 April 1999 1:Final Cycle 16 Freespan ODSCC Operational Assessment L-99-161, Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20205N0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20204D7271999-03-15015 March 1999 ISI Refueling 15,Interval 2,Period 3,Outage 3 for Jm Farley Nuclear Generating Plant,Unit 1 ML20207M6421999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20203A2651999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20199D8611999-01-12012 January 1999 SER Accepting Relief Request for Inservice Insp Program for Plant,Units 1 & 2 ML20199E6591998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20206C8081998-12-31031 December 1998 Alabama Power 1998 Annual Rept ML20198K4091998-12-18018 December 1998 COLR for Jm Farley,Unit 1 Cycle 16 ML20198B2561998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20195E2281998-11-16016 November 1998 Safety Evaluation Authorizing Relief Request for Second 10-year ISI Program Relief Request 56 for Plant,Unit 1 ML20195C9681998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20155E0271998-10-29029 October 1998 SER Approving & Denying in Part Inservice Testing Program Relief Requests for Plant.Relief Requests Q1P16-RR-V-3 & Q2P16-RR-V Denied Since Requests Do Not Meet Size Requirement of GL 89-04 ML20154B6121998-10-0101 October 1998 Safety Evaluation Granting Second 10-year ISI Requests for Relief RR-13 & RR-49 Through RR-55 for Jm Farley NPP Unit 1 ML20151V8341998-09-30030 September 1998 Non-proprietary Rev 2 to NSA-SSO-96-525, Jm Farley Nuclear Plant Safety Analysis IR Neutron Flux Reactor Trip Setpoint Change ML20154H6001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20154H0121998-09-30030 September 1998 Submittal-Only Screening Review of Farley Nuclear Plant IPEEE (Seismic Portion) ML20197C8991998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20237C5471998-08-20020 August 1998 Suppl to SE Re Amends 137 & 129 to Licenses NPF-2 & NPF-8, Respectively.Se Being Supplemented to Incorporate Clarifications/Changes & Revise Commitment for Insp of SG U-bends in Rows 1 & 2 for Unit 2 Only ML20236Y1121998-07-31031 July 1998 Voltage-Based Repair Criteria 90-Day Rept ML20237B1891998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20237A2181998-07-24024 July 1998 Jm Farley Unit 2 ISI Rept Interval 2,Period 3 Outage 1, Refueling Outage 12 ML20236U6141998-07-23023 July 1998 Safety Evaluation Authorizing Use of Alternative Alloy 690 Welds (Inco 52 & 152) as Substitute for Other Weld Metal ML20236R8671998-07-0909 July 1998 Safety Evaluation Concluding That Southern Nuclear Operating Co USI A-46 Implementation Program Has Met Purpose & Intent of Criteria in GIP-2 & Staff SSER-2 on GIP-2 for Resolution of USI A-46 ML20236M5981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20154H0461998-06-30030 June 1998 Technical Evaluation Rept on Review of Farley Nuclear Plant IPEEE Submittal on High Winds,Flood & Other External Events (Hfo) ML20248M3121998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20247F3631998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20217D2591998-04-21021 April 1998 Safety Evaluation Accepting Licensee Proposed Alternative Re Augmented Exam of Reactor Vessel Shell Welds for Plant ML20247E8851998-03-31031 March 1998 FNP Unit 2 Cycle 13 Colr ML20217H3191998-03-31031 March 1998 Safety Evaluation Accepting Proposed Changes to Plant Matl Surveillance Programs ML20216D5941998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Joseph M Farley Nuclear Plant,Units 1 & 2 ML20217D4081998-03-24024 March 1998 Safety Evaluation Accepting Proposed Changes to Maintain Calibration Info Required by ANSI N45.2.4-1972 ML20216H6731998-03-17017 March 1998 SER Accepting Quality Assurance Program Description Change for Joseph M Farley Nuclear Plant,Units 1 & 2 ML20216J6851998-03-16016 March 1998 Revised Pages 58 & 59 to Fnp,Units 1 & 2,Power Uprate Project BOP Licensing Rept ML20216D9811998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Jm Farley Nuclear Plant,Units 1 & 2 1999-09-30
[Table view] |
Text
. ~ - . . . . . . . .. -. -. - - -- -,.
- Southarn Nucitar Operating Company i
, Post Offica Box 1205
- Birmingham, Alabama 35201 Telephone (205) 868-5131 J
o.ve morey Southern Nudear Operating Company Vice President Fariey Project the Southem elecinc system July 9, 1996 Docket Nos. 50-348 50-364 l
l U. S. Nuclear Regulatory Commission )
i ATTN: Document Control Desk l
Washington, D C 20555 )
Joseph M. Farley Nuclear Plant Monthly Operating Report
- Ladies and Gentlemen
l Attached are the June 1996 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2, as required by Section 6.9.1.10 of the Technical Specifications.
I lf you have any questions, please advise.
Respectfully submitted,
//14t Dave Morey l RWC:(mor) l Attachments cc: Mr. S. D. Ebneter, Region 11 Administrator Mr. B. L. Siegel, NRR Senior Project Manager Mr. T. M. Ross, FNP Resident inspector hD DO K 05 0 48 i R PM 4
\ \
qt4 .
e t Joseph M. Farley Nuclear Plant Unit 1 l Narrative Summary of Operations June 1996 At 1800 on June 16,1996, with the unit operating in mode 1 at 100% reactor power, the unit was ramped down to 55% reactor power to repair the Main Generator Terminal Bus Cooling Fan.
All repairs were completed and the unit was retumed to 100% reactor power at 0727 on June 17,1996.
i l
There was no major safety related maintenance performed during the month. j l
L I
l l
l i
i I-
OPERATING DATA REPORT DOCKET NO. 50-348 DATE July 5,1996 COMPLETED BY M. W. McAnulty TELEPHONE (334) 899-5156, ext. 3640 QPERATINGSTATES
- 1. Unit Name: Joseph M. Farley - Unit 1 Notes
- 2. Reporting Period: June 1996 1) Cumulative data since 12-01-77,
- 3. Licensed Thermal Power (MWt): 2,652 date of commercial operation.
- 4. Nameplate Rating (Gross MWe): 860
- 5. Design Electrical Rating (Net MWe): 829
- 6. Maximum Dependable Capacity (Gross MWe) 855.7
- 7. Maximum Dependable Capacity (Net MWe): 812 _
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Smce Last Report, Give Reasons: N/A
- 9. Power Level To Which Restricted, If Any (Net MWe): N/A
- 10. Reasons For Restrictions,If Any: N/A This Month Yr. to Date Cumulative
- 11. Hours in Reporting Period 720.0 4,367.0 162,887.0
- 12. Number Of Hours Reactor Was Critical 720.0 4,338.3 131,027.7 l
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 3,650.0
- 14. Hours Generator On-line 720.0 4,323.0 128,998.7
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1,897,153.3 11,294,719.6 332,049,092.5
- 17. Gross Electrical Energy Generated (MWH) 617,575.0 3,710,528.0 107,202,682.0
- 18. Net Electrical Energy Generated (MWH) 586,359.0 3,524,426.0 101,264,078.0
- 19. Unit Service Factor 100.0 99.0 79.2 l
- 20. Unit Availability Factor 100.0 99.0 79.2
- 21. Unit Capacity Factor (Using MDC Net) 100.3 99.4 76.6 l
- 22. Unit Capacity Factor (Using DER Net) 98.2 97.4 75.0
- 23. Unit Forced Outage Rate 0.0 0.0 5.7
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
- 25. If Shut Down at End Of Report Period, Estimated Date of Startup: N/A l 26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved i
! Initial Criticality 08/06/77 08/09/77
- Initial Electricity 08/20/77 08/18/77 i
Commercial Operation 12/01/77 12/01/77
- . ~ ..- . . - - - . -
.. UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-348 UNIT NAME J. M. Farley - Unit 1 DATE July 5,1996 COMPLETED BY M. W. McAnulty REPORT MONTil June TELEPHONE (334) 899-5156, ext. 3640 j R M l E E S T A T Y Y S 11 SC P O O TO CAUSE AND CORRECTIVE E DURATION N D ED COMPONENT ACTION TO NO. DATE (1) (llOURS) (2) (3) LER # ME CODE (5) PREVENT RECURRENCE M 9606f6~F~ 0 ]~A 1 N/A TB -FXN
~
At l'800Ms6661~63i~ tlithe unit operating in mode 1 at 100% reactor power, the unit was ,
ramped down to 55% reactor power to repair the Main Generator Terminal Bus Cooling Fan.
All repairs were completed and the unit was returned to 100% reactor power at 0727 on 960617.
'l ,
i l
l 1
l i
. - - - _ . . . . - l 1: 2: 3: EVENrSREPORTED
- F
- Forced Reason Method INVOLVE A S: Scheduled A - Equipment Failure (Explain) 1 - Manual GREATER TilAN 20%
D Maintenance orTest 2 - Manual Scram REDUCTION IN C Refueling 3 - Automatic Scram AVERAGE DAILY ,
D Regulatory Restriction 4 -Other (Explain) POWER LEVEL FOR I i E - Operator Training & License Examination Tile PRECEDING 24 l
- F- Administrative ilOURS.
G Operational Error (Explain) f 11 Other(Explain) l l
1 DOCKET NO. 50-348 _
UNIT 1
.. DATE July 5,1996 COMPLETED BY M. W. McAnuity TELEPHONE (334) 899-5156 ext. 3640 MONTH June DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 _
823 17 744 2 824 18 818 3 826 19 820 4 824 20 814 5 823 21 819 ,
6 823 22 816 :
7 822 23 815 ;
8 822 24 813 9 823 25 814 10 823 26 814 11 823 27 816 12 820 28 824 13 811 29 823 14 822 30 821 15 820 31 N/A _
16 736 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.
i l
l
^
l 1
i Joseph M. Farley Nuclear Plant l
Unit 2 l Narrative Summary of Operations l
! June 1996 At 1845 on June 20,1996, with the unit operating in mode 1 at 100% reactor power, the unit began a ramp down due to entry into Technical Specification (TS) -
3.0.3 action statement as a result of not meeting all surveillance requirements for the reactor protection system. The ramp down was stopped at 75% reactor power I and TS 3.0.3 was exited after an enforcement discretion was granted by the NRC. )
The unit was returned to 100% reactor power at 0100 on June 21,1996.
There was no major safety related maintenance performed during the month. l l
l l
l .
I i
i I
i i
4
1 OPERATING DATA REPORT DOCKET NO. 50-364 l
.o DATE July 5,1996 COMPLETED BY M. W. McAnulty TELEPHONE (334) 899-5156, ext. 3640 OPERATING STATUS
- 1. Unit Name: Joseph M. Farley - Unit 2 Notes 1
- 2. Reporting Period: June 1996 1) Cumulative data since 07-30-81,
- 3. Licensed Thermal Power (MWt): 2,652 date of commercial operation. i
- 4. Nameplate Rating (Gross MWe): 860 )
- 5. Design Electrical Rating (Net MWe): 829 I
- 6. Maximum Dependable Capacity (Gross MWe) 863.6 )
- 7. Maximum Dependable Capacity (Net MWe): 822 ;
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Smce l
Last Report, Give Reasons: N/A l 1
- 9. Power Level To Which Restricted, If Any (Net MWe): N/A l
- 10. Reasons For Restrictions,If Any: N/A This Month Yr. to Date Cumulative
- 11. Hours in Reporting Period 720.0 4,367.0 130,800.0
- 12. Number Of Hours Reactor Was Critical 720.0 4,367.0 113,270.4
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0
- 14. Hours Generator On-line 720.0 4,367.0 111,577.2
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1,907,026.7 11,192,315.3 284,166,105.7
- 17. Gross Electrical Energy Generated (MWH) 621,749.0 3,681,435.0 93,143,914.0
- 18. Net Electrical Energy Generated (MWH) 591,989.0 3,502,055.0 88,315,706.0
- 19. Unit Service Factor 100.0 100.0 85.3
- 20. Unit Availability Factor 100.0 100.0 85.3
- 21. Unit Capacity Factor (Using MDC Net) 100.0 97.6 82.4
- 22. Unit Capacity Factor (Using DER Net) 99.2 96.7 81.4
- 23. Unit Forced Outage Rate 0.0 0.0 3.8
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refueling Outage scheduled for October 12,1996 with a duration of 47 days
- 25. If Shut Down at End Of Report period, Estimated Date of Startup: N/A
- 26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved Initial Criticality 05/06/81 05/08/81 Initial Electricity 05/24/81 05/25/81 Commercial Operation 08/01/81 07/30/81
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-364 UNIT NAME J. M. Farley . Unit 2 DATE July 5,1996 COMPLETED BY M. W. McAnulty REPORT MONTil June TELEPilONE (334) 899-5156, ext. 3640 R M ~-l E E S T A T Y Y S II sC P o o To CAUSE AND CORRECTIVE E DURATION N D ED COMPONENT ACTION To No. DATE (1) (IIOURs) (2) (3) LER # ME CODE ($) PREVENT RECURRENCE
~
009 V60820~F 0 D 4"9610(Mili)TJC HS At 1845 on 960620, with the unit in mode 1 operating at 100% reactor power, the unit began a ramp down due to entry into Technical Specification (TS) 3.0.3 action statement as a result of not meeting all surveillance requirements for the manual safety injection input into the reactor protection system. The ramp down was stopped at 75% reactor power and TS 3.0.3 was exited after an enforcement discretion was granted by the NRC, pending a one time TS change for the current operating cycle.
The unit returned to 100% reactor power at 0100 on 960621.
i l
__._ =ll i 1: 2: 3: EVENTS REPORTED F: Forced Reason Method INVOLVE A S: Scheduled A - Equipment Failure (Explain) 1 - Manual GREATER TilAN 20%
B - Maintenance or Test 2 - Manual Scram REDUCTION IN C . Refueling 3 - Automatic Scram AVERAGE DAILY
- D - Regulatory Restriction 4 - other (Explain) POWER LEVEL FoR E - operator Training & License Examination TIIE PRECEDING 24 F Administrative llOURS.
G - operational Error (Explain)
II- other (Explain)
i .
- I DOCKET NO. 50-364 UNIT 2 DATE July 5,1996 COMPLETED BY M. W. McAnulty_
TELEPHONE (334) 899-5156 ext. 3640 MONTH June DAY AVERAGE DAILY POWER LEVEL DAY. AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 825 17 825 2 826 18 824 3 826 19 823 4 826 20 795 5 826 21 821 6 826 22 818 8
7 824 23 818 8 824 24 819 9 826 25 819
]
10 826 26 819 11 827 27 821
'12 822 28 829 13 813 29 828 14 825 30 t' 825 15 823 31 N/A
( 16 825 i
INSTRUCTIONS l On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt. ~