ML20198T415
| ML20198T415 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 10/31/1997 |
| From: | Mcanulty M, Dennis Morey SOUTHERN NUCLEAR OPERATING CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9711140278 | |
| Download: ML20198T415 (9) | |
Text
4 Dave Morey -
Southern Nuclear
%ce Pre 9 dent Operating Cornpany farley Propct.'
. PA Bax 1295 Bin dr.gham. Afatama 35201 Tel 205.992.5131 SOUTHERN COMPANY w xt 30, 1997 Esserg to Serve krWorW" Docket Nos.
50-348.
50-361
' O. S. Nuclear Regulatory Commission ATTN: Document Control Desk -
Washington, D C -20555 Joseph M. Farley Nuclear Plant Monthly Operating Report ladies and Gentlemen:
Attached are the October 1997 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units I and 2, as required by Section 6.9.1.10 of the Technical Specifications.
' If you have any questions, please advise.
Respectfully submitted, h) ))LW Dave Morey RWC:(mor)
Attachments ec:
Mr. L. A. Reyes, Region 11 Administrator
([
Mr. J.1. Zimmerman, NRR Project Manager j
Mr. T. M. Ross, FNP Sr. Resident inspector i
9711140278 971031 Y
[I. l
,lRI PDR ADOCK 05000348 lan R
PDR Q
_.~... _. __
- i.,
c,-
NARRATIVE
SUMMARY
OF OPERATIONS DOCKET No.
50-348 UNIT NAME L M. Parley Unit 1 DATE.
November 4,1997
~
COMPLETED BY M. W. McAnuity REPORT MONTil Octaber TELEPHONE
_{334) 899 5156, ext.3640 s
There were no unit shutdowns or power reductions during the' month.
The following major safety related maintenance was performed during the month:
18 month maintenance outage was performed on the 12A Diesel Generator which included replacement of the jacket water and lube oil heat exchanger tube bundles
- and repair of exhaust system leaks.
e l~
l
OPERATING DATA ' REPORT DOCKET NO.
50-348 DATE November 4,1997 COMPLETED fly M. W. Mc.Anulty_
TELEPilONE (334) 899-5156, ext.3640 OPERATING STATUS
- 1. > Unit Name:
Joseph M. Farley - Unit 1___
Voies 2.
Reporting Period:
October 1997
- 1) Cumulative data since 12-01-77, 3.
Licensed Thermal Power (MWt):
4.
Nameplate Rating (Gross MWe):
2,652_
date of commercial operation.
860 5.
Design Electrical Rating (Net MWe):
6.
Maximum Dependable Capacity (Gross MWe):.
829_
866 7.
Maximum Dependable Capacity (Net MWe):
822 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Smce Last Report, Give Reasons:
N/A 9.
Poiver^11eldTo Wiiic'hitestriciid,~~lf Anf[ ei~MWi)i-
[N7Al][-
~
~~
- 10. Reasons For Restrictions,if Any:
N/A This Month Yr. to Date Cumulative
- 11. Ilours in Reporting Period
_ __745.0_
_. __7,29_6.0
_ _ _ 174,600.0
- 12. Number OfIlours Reactor Was Critical
_. _ _ _ _ 0.0_
_ _ _____0.0_
__ _ _ 3,650.0 745.0_
_ _ 5,372.9
_ _ _1_40,817.6
- 13. Reactor Reserve Shutdown llours
- 14. Ifours Generator On-line 745.0 5,339.7 138,755.4
- 15. Unit Reserve Shutdown flours
_0.0
_ _ _ _ _0. 0_
___357,493,173.3
- 16. Gross Thermal Energy Generated (MWH)
_ 1,975,740.0 13,774,166.9
_ 0.0_
- 17. Gross Electrical Energy Generated (MWil) 647,880.0 4,484,410.0 115,495,988.0
- 18. Net Electrical Energy Generated (MWil) 615,756.0 4,231,414.0 109,113,370.0
.19. Unit Service Factor
_ 100.0_
_ 73.2 79.5
- 20. Unit Availability Factor 100.0 73.2 79.5
- 21. Unit Capacity Factor (Using MDC Net) 100.5 70.6 76.7
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate
____W.7_
_ __ _70.0_.
75.4 0.0 0.0 5.3
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
- 25. If Sliut 6oim'at EridUf'Ripoiiiieriod,~IfsiimatedDate of Startup:
S/A
~~
._i
~
~
- 26. Units in Test Status (Prior To Commercial Operation):
Forecast Achieved initial Criticality N/A N/A Initial Electricity N/A N/A Commercial Operation N/A N/A
4-
' DOCKET NO.
50-348 UNIT
-1 DATE_ November 4,1997 COMPLETED BY -
M W. McAnuity__
' TELEPHONE (334) 899 5156 ext 3640 l
MONTl!
October
. DAY AVERAGE DAILY POWER LEVEL - DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) l-824' 17 829 2
828 18 82,9 827
.19 830 3
4 827 20 834 5-822 21 830 6
824.
22 830 7
_822 23 832 8
822 24 827 9
821 25 823 10 822 26 822
.I1 824 27 831 12 822 28 834 13 822 29 833 14 823 30 832 15-
_ _828_
31 828 16-828' l*
l
- INSTRUCTIONS
- On this format, list the average daily unit pow :r level in MWe-Net for each day in the L. reporting period.- Compute to the nearest whole megawatt.
h-l 4
-~,.
E a.
1*
. UNIT SHUTDOWNS AND POWER REDUCTIONS -
i 7.. -
- DOCKET NO. _ _ _ _
-- 50_.3_48
. UNIT NAME _ _J. M. Farley. Unit 1
- DATE-November 4J997 COMPLETED BY.
M. W. McAnuity
- REPORT MONTil October _
TELEPHONE : (334) 899 5156, ext 3640j umwarm-am&mu
.a=r===&=& a-m==7 m== = =aa===w=.= rare mmum;.
R M -.
E-
-E S-
~
T?
A~
T Y
Y S
11-SC P
O O
TO CAUSE AND CORRECTIVE 1:
DURATION M
~D ED COMPON!:NT ACIlON TO 7
NO--
DATE-(1)
(I'.sVRS) -
(2)
(3) 1.!:R #-
ME CODE ($)
PREVINT RI'CURRINCE Ikhc rhIO$hhidhk b[ -.ebh b(.tI1htihiti kh[I510ntN'.
7.
l e-
?
- i.
i l
l h
l l
I g-i 1
~
1 f
e I=
I, i
I l.
m.Lxw =.; ; u. - =.s =wwwJ. : 2.-Gw ::=:=== w=z= =.-
=:== = r=. ========,a-;=
l
=:=m
~- 1:
2:
3:
EVI:NiS REPORTED n toeced ~
Reas.a :
Method '
INVOLVE A
. S: Scheduled
_' A. l'quipment I alture (Explain).
l Manual GREATI:R TilAN 20%
- D e Maintenance or Test 2 ManualScram REDUCI'lON IN -
I-C.EcDwlms:
3 Automatic Scram AVERAGE DAILY.
D i Regulatory Restriction 4 Other(Explain)
POWER LI: VEL FOR E. Operator Training & License I-:xaminauon TiiE PRECEDING 24
- 0. Administrative ll0URS.
. G.Operstional Error (Explain)
II.Other(Explain) i i-c-
-t-c v
w
.a.
wr i e,
=-, - -
-e+
--*---->--*--e-=
--~+- ---
NARRATIVE
SUMMARY
OF OPERATIONS DOCKET NO.'
--50 364 UNIT NAME
_ J._M. Farley; Unit 2.
DATE-
. November 4,1997
_. _ M. W. McAnulty
- COMPLETED BY
.REPORTMONTil Atober _
'.TELEP110NE- __(334] 899 5156, ext.3641
.l There were no unit shutdowns or power reductions during the month.
There was no inajor safety related maintenance performed during the month, r
a i
a----
n-
--,+,-e-
, -,,, ~ -
,-,.--.---------,-.----n---
- - -,-n-a-,
- -,,. ~
w
OPERATING DATA REPORT DOCKET NO.
50-364 DATE
_ November _4,199)_
COMPLETED BY M. W. McAnulty_
TELEPilONE (334) 899-51M, ext 3640 OPERATING STATUS 1.
Unit Name:
Joseph M. Farley - Unit 2
" Rotes
~
2.
Reporting Period:
_,0cto_ber 1997_
- 1) Cumulative data since 07-30-81, 3.
Licensed Thermal Power (MWI):
2,652 date of commercial operation.
4.
Nameplate Rating (Gross MWe):
860 5.
Desig i Electrical Rating (Net MWe):
829 6.
Maximum Dependable Capacity (Gross MWe):._
863.6_
7.
Maximum Dependable Capacity (Net MWe):
822 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Smce Last Report, Give Reasons:
N/A 9.
Power Level To Which Restricted, if Any (Net MWe):
N/A
- 10. Reasons For Restrictions,If Any:
N/A This Month Yr. to Date Cumulative
- 11. Ilours in Reporting Period 745.0 7,296.0 142,513.0
- 12. Number Ofliours Reactor Was. Critical 745.0 7,296.0 123,413.0
_0_._0_
_ 0.0_
138.0
- 13. Reactor Reserve Shutdowrillours
._745.0_
_ 7,296.0_
_ _ _121,666.9_
- 14. Ilours Generator On line
- 15. Unit Reserve Shutdown flours
_._ _ _ 0.0 0.0_
__310,699,943.4
_ _ 0.0_
- 16. Gross Thermal Energy Generated (MWH)
. _ 187_5,501.3
_ _19,251,849.2
- 17. Gross Electdcal Energy Generated (MWil) 653,793.0 6,352,409.0 101,866,707.0
- 18. Net Electrical Energy Generated (MWil) 623,099.0 6,053,125.0 96,603,581.0 100.0 100.0 85.4
- 19. Unit Ser ice Factor 100.0 100.0_
85.4
- 20. Unit Artilability Factor 101.7 100.9 82.6
- 21. Unit Capacity Factor (Using MDC Net) 2.2. Unit Capacity Factor (Using DFR Net) 100.9 100.1 81.8
- 23. Unit Forced Outage Rate 0.0 0.0 3.5
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refueling Outage _ scheduled for March 28.1998 v,ith a duration of 52 days.
- 25. IfSiiuiDKnit 5ncf0?IEp~ oil e'riod, Eitl~ mated Date of Startup:
N/A
~
i
- 26. Units In Test Status (Prior To Commercial Operation):
Forecast Achieved Initial Criticality N/A N/A luitial Electricity N/A_
N/A Comuercial Operation N/A N/A
3
. DOCKET NO.'
50 364'
-4 1 UNIT. DATE-November 4,1997 COMPLETED BY_ - M. W. McAnulty TELEPHONE (334) 899. 5156 ext 3640 -
T
-i MONTil.
October _-
DAYg l AVERA(?E DAILY POWER LEVEL ' DAY - AVERAGE DAILY POWER LEVEL (MWe-Net)'
(MWe-Net)
~ l 834 17 840 2
838 18 840
,m 3:
837 19 842 4
836 20 844 5-
_831 21 842 6
833 22 841 7
831 23 844 8;
828 24 837 9
829 25 831 831 26 828 11 832 27 844 12 829 28 846 e
13 829 29 846 14 832 30 844
- 15. ;
. 2838 31 835 16
.- 83 9 _
INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting period.- Compute to the nearest whole megawatt.
i
,m-4+-..
4 m
,-y---
.wi-
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. -
50 364 UNIT NAME J. M. Farley. Unit 2 -
DATE-November 4,1997 -
COMPLETED BY M. W. McAnuity _
REPORTMONTil October TELEPilONE 1334) 899 5156, est.3640.
www w====:,: x=u====.== _=m =:.m
.==
r_-
-m. =. _-
R-M E
E 5
T A-T Y
i.
r-I, Y-S.
11 -
SC P.
.O-O
- T O CAtISE ANDCORRFCrlVE E
DURN. ION N
D
'E D COMPONINr ACTION TO :-
NO. -
DATE (l)
(llOURS) 42)
(3) 1.I:R #
ME CODE ($)
PREVENT RECUR.RENCE.
,w
x.
=-=h=z.m w
. -. _ _ _.- _... - -._._=1-
- There werg no shutdowns Dr power reductions during the month.-
a
_ r i
i 4
1 i
i a
i
+
i l
i
~
l i
i.
I i
4 i
-1 l
l i
ms.umr%=N[w wmuN=m n-u - '----
- = -.
.- -. --.E 1:
2:
3; EVENTS REPORTED i. rorced Reason Method INVOLVE A 4
1 S: Scheated -
A Equipment Failure (Explain)
I. Manual GREATER TilAN 20%
- B Maintenance or Test
- 2. Manual Scram REDUCTION IN C. Refueling
- 3. Automatic Scram AVERAGE DAILY
. D. Regulatory Restriction 4.Other (Explain)
POWER LEVEL FOR
. E Operator Training & License Examination Tile PRECEDINO 24
~
F Administrative tlOURS.
0 OperationalError(Explain) 1 11 Other(Explain) a..
,n s
.,-. = - - - - -, _ ~.. -,
e
-r,
-