i OPERATING DATA REPORT D00KET NO.
50-364 DATE ' Hay 3, 1990 COMPLETED BY D. N.-Morey l
TELEPHONE (205)899-5156 OPERATING STATUS 4
Notes
- 1. Unit Name:
Joseph M. Parley - Unit 2
- 1) Cumulative data since
- 2. Reporting Period:
April 1990 7-30-81, date of
- 3. licensed Thermal Power (MVt):
2,652 commercial operation.
- 4. Nameplate Rating (Gross MVe):
860
- 5. Design Electrical Rating (Net MVe):
829
-6. Maximum Dependable Capacity (Gross MVe):
868.6 t
- 7. Maximum Dependable Capacity (Net MWe):
828.2
-8. If Changes occur in Capacity Ratings (Items Number 3 Through 7) Since Lsst Report, Give Reasons:
N/A
- 9. Power Level To Which Restricted, If Any (Net MVe):
N/A
- 10. Reasons For Restrictions, If Any:
N/A This Month Yr-to-Date Cumulative
- 11. Hours In Reporting Period 719 2,879 76,728
- 12. Number Of Hours Reactor Was Critical 645.4 2,805.4 66,688.5 l
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0
- 14. Hours Generator On-Line 645.1 2,805.1 65,877.1 l
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MVH) 1,694,856 7,267,680 167,523,947
- 17. Gross Electrical Energy Generated (MVH) 557,114 2,401,718 55,068,260-
~
- 18. Net Electrical Energy Generated (MVH) 529,418 2,286,012 52,229,402 i
19.-Unit Service Factor 89.7 97.4 85.9
- 20. Unit Availability Factor 89.7 97.4 85.9
'21. Unit Capacity Factor (Using MDC Net) 88.9 95.9 83.2 i
- 22. Unit Capacity Factor (Using DER Net) 88.8 95.8 82.1
- 23. Unit Forced Outage Rate 0
0 4.4
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refueling / Maintenance Outage, September 14, 1990, approximately 7 veeks.
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup: May 11, 1990 t
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY 05/06/81 05/08/81 INITIAL ELECTRICITY 05/24/81 65/75/81 C0KKERCIAL OPERATION 08/01/81 07/30/81 i