ML20216D981

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Feb 1998 for Jm Farley Nuclear Plant,Units 1 & 2
ML20216D981
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 02/28/1998
From: Phillips A
SOUTHERN NUCLEAR OPERATING CO.
To:
Shared Package
ML20216D975 List:
References
NUDOCS 9803170382
Download: ML20216D981 (4)


Text

_

F~

OPERATING DATA REPORT DOCKET NO.:

50-348 UNIT NAME:

J. M. Farley - Unit 1 DATE:

March 4,1998 COMPLETED BY:

A. M. Phillips TELEPHONE:

(334) 899-5156, ext. 3640 OPERATING _ STATUS 1.

Reporting Period:

February 1998 2.

Design Electrical Rating (Net MWe):

829 3.

Maximum Dependable Capacity (Net MWe):

822 This3fonth YeattoDate Cumulative 4.

Number Of Hours Reactor Was Critical:

672.0 1,416.0 143,697.6 5.

Hours Generator On-line:

672.0 1,416.0 141,635.4 6.

Unit Reserve Shutdown Hours:

0.0 0.0 0.0 7.

Net Electrical Energy Generated (MWH):

552,262.0 1,170,939.0 111,471,267.0 CHALLENGES TO PRESSURIZER PORY OR PRESSURIZER SAFETY VALVES Date l Tag No.

I hvent Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.

El-1 9003170382 900311 PDR ADOCK 05000348 R

PDR

UNIT SHUTDOWNS

~

DOCKET NO.:

50-348 UNIT NAME:

- J. M. Farley - Unit 1 DATE:

March 4,1998 COMPLETED BY:

A. M. Phillips REPORTING PERIOD: Echruary_199.8 TELEPHONE:

(334) 899-5156, ext.3640 Type Method of F: Forced Duration Reason Shutting Down Cause/ Corrective Actions No.

Date S: Scheduled (Hours)

(1)

(2)

Comments There were no unit shutdowns daring the month.

m anuu.

m muuvu.

A Equipment Failure (Explain) 1 - Manual D - Maintenance or Test 2 - Manual Ts;p/ Scram C Refueling 3 Automatic TrifvScram D-Regulatory Restriction 4 Continuation E operatorTraining/ License Examination 5 - Other(Explain)

F Administrative 0 operational Error (Explain) 11 other(Explain)

CAUSE/ CORRECTIVE ACTION / COMMENTS 1

i NARRATIVE REPORT At 1813 on 980211, with the unit operating at 100% reactor power, the unit was ramped to 24% reactor power to replace a electronic card in the controls of the 'B' Main Feedwater Reg Bypass Valve Controller. Repair wr-bompleted and the unit was returned to 100% reactor power at 1135 on 980212.

El-2

~

OPERATING DATA REPORT DOCKET NO.:

50-364 UNIT NAME:

J. M. Farley - Unit 2 DATE:

March 4,1998 COMPLETED BY:

A. M. Phillips TELEPHONE:

(334) 899-5156, ext. 3640 DPERATINGSTATllS 1.

Reporting Period:

February 1998 2.

Design Electrical Rating (Net MWe):

829 3.

Maximum Dependable Capacity (Net MWe):

828 IbisJdonth YeatioEite Cumulative 4.

Number Of Hours Reactor Was Critical:

672.0 1,416.0 126,333.0 5.

Hours Generator On-line:

672.0 1,416.0 124,546.9 6.

Unit Reserve Shutdown Hours:

0.0 0.0 0.0 7.

Net Electrical Energy Generated (MWH):

566,815.0 1,193,920.0 99,025,284.0 CIIALLENGES TO PRESSURIZER PORY OR PRESSURIZER SAFETY VALVES Date l Tag No.

I Event Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.

)

E2-1

i

..;~

UNIT SHUTDOWNS j

DOCKET NO.:

50-364 i

UNIT NAME:

J. M. Farley - Unit 2 DATE:

March 4,1998 COMPLETED BY:

A. M. Phillips

~

REPORTING PERIOD: February _1998 TELEPHONE:

(334) 899-5156, ext.3640 Type Method of F: Forced Duration Reason Shutting Down Cause/ Corrective Actions No.

Date s: scheduled (Hours)

(1)

(2)

Comments l

There were no unit shutdowns during the month.

I (1) KLASUN.

(2) Mt.IllVD, A Equipment Failure (Explain) 1 - Manual D Maintenanx orTest 2 - Manual Trip / Scram C Refueling 3 AutomaticTrip/ Scram D - Regulatory Restriction 4 Continuation E OperatorTraining/ License Exarnination 5 Other(Explain)

F Administrative 0- Operational Error (Explain) 11 Other(Explain)

CAUSE/ CORRECTIVE ACTION / COMMENTS l

NARRATIVE REPORT There were no significant power reductions or major safety related maintenance during the month.

I l

E2-2