Text
_
F~
OPERATING DATA REPORT DOCKET NO.:
50-348 UNIT NAME:
J. M. Farley - Unit 1 DATE:
March 4,1998 COMPLETED BY:
A. M. Phillips TELEPHONE:
(334) 899-5156, ext. 3640 OPERATING _ STATUS 1.
Reporting Period:
February 1998 2.
Design Electrical Rating (Net MWe):
829 3.
Maximum Dependable Capacity (Net MWe):
822 This3fonth YeattoDate Cumulative 4.
Number Of Hours Reactor Was Critical:
672.0 1,416.0 143,697.6 5.
Hours Generator On-line:
672.0 1,416.0 141,635.4 6.
Unit Reserve Shutdown Hours:
0.0 0.0 0.0 7.
Net Electrical Energy Generated (MWH):
552,262.0 1,170,939.0 111,471,267.0 CHALLENGES TO PRESSURIZER PORY OR PRESSURIZER SAFETY VALVES Date l Tag No.
I hvent Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.
El-1 9003170382 900311 PDR ADOCK 05000348 R
UNIT SHUTDOWNS
~
DOCKET NO.:
50-348 UNIT NAME:
- J. M. Farley - Unit 1 DATE:
March 4,1998 COMPLETED BY:
A. M. Phillips REPORTING PERIOD: Echruary_199.8 TELEPHONE:
(334) 899-5156, ext.3640 Type Method of F: Forced Duration Reason Shutting Down Cause/ Corrective Actions No.
Date S: Scheduled (Hours)
(1)
(2)
Comments There were no unit shutdowns daring the month.
m anuu.
m muuvu.
A Equipment Failure (Explain) 1 - Manual D - Maintenance or Test 2 - Manual Ts;p/ Scram C Refueling 3 Automatic TrifvScram D-Regulatory Restriction 4 Continuation E operatorTraining/ License Examination 5 - Other(Explain)
F Administrative 0 operational Error (Explain) 11 other(Explain)
CAUSE/ CORRECTIVE ACTION / COMMENTS 1
i NARRATIVE REPORT At 1813 on 980211, with the unit operating at 100% reactor power, the unit was ramped to 24% reactor power to replace a electronic card in the controls of the 'B' Main Feedwater Reg Bypass Valve Controller. Repair wr-bompleted and the unit was returned to 100% reactor power at 1135 on 980212.
El-2
~
OPERATING DATA REPORT DOCKET NO.:
50-364 UNIT NAME:
J. M. Farley - Unit 2 DATE:
March 4,1998 COMPLETED BY:
A. M. Phillips TELEPHONE:
(334) 899-5156, ext. 3640 DPERATINGSTATllS 1.
Reporting Period:
February 1998 2.
Design Electrical Rating (Net MWe):
829 3.
Maximum Dependable Capacity (Net MWe):
828 IbisJdonth YeatioEite Cumulative 4.
Number Of Hours Reactor Was Critical:
672.0 1,416.0 126,333.0 5.
Hours Generator On-line:
672.0 1,416.0 124,546.9 6.
Unit Reserve Shutdown Hours:
0.0 0.0 0.0 7.
Net Electrical Energy Generated (MWH):
566,815.0 1,193,920.0 99,025,284.0 CIIALLENGES TO PRESSURIZER PORY OR PRESSURIZER SAFETY VALVES Date l Tag No.
I Event Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.
)
E2-1
i
..;~
UNIT SHUTDOWNS j
DOCKET NO.:
50-364 i
UNIT NAME:
J. M. Farley - Unit 2 DATE:
March 4,1998 COMPLETED BY:
A. M. Phillips
~
REPORTING PERIOD: February _1998 TELEPHONE:
(334) 899-5156, ext.3640 Type Method of F: Forced Duration Reason Shutting Down Cause/ Corrective Actions No.
Date s: scheduled (Hours)
(1)
(2)
Comments l
There were no unit shutdowns during the month.
I (1) KLASUN.
(2) Mt.IllVD, A Equipment Failure (Explain) 1 - Manual D Maintenanx orTest 2 - Manual Trip / Scram C Refueling 3 AutomaticTrip/ Scram D - Regulatory Restriction 4 Continuation E OperatorTraining/ License Exarnination 5 Other(Explain)
F Administrative 0- Operational Error (Explain) 11 Other(Explain)
CAUSE/ CORRECTIVE ACTION / COMMENTS l
NARRATIVE REPORT There were no significant power reductions or major safety related maintenance during the month.
I l
E2-2