ML20141E312

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Apr 1997 for Jm Farley Nuclear Plant Units 1 & 2
ML20141E312
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 04/30/1997
From: Mcanulty M, Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9705200401
Download: ML20141E312 (9)


Text

.

i -a c

  • Dave Morey Southern Nuclear V:ce President Operating Company Farley Project P0. Box 1295 Birmingham, Alabama 35201 Tel 205 992.5131 SOUTHERNk h COMPANY May 9, 1997 Energy to ServeYourWorld" Docket Nos. 50-348 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D C 20555 Joseph M. Farley Nuclear Plant Monthly Operating Report Ladies and Gentlemen:

Attached are the April 1997 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2, as required by Section 6.9.1.10 of the Technical Specifications.

If you have any questions, please advise.

Respectfully submitted, f )htti Dave Morey RWC:(mor)

I Attachments

)

cc: Mr. L. A. Reyes, Region II Administrator /

Mr. J.1. Zimmerman, NRR Project Manager

) [k Mr. T. M. Ross, FNP Sr. Resident inspector 9705200401 970430 PDR ADOCK 05000348 R PDR kf

Joseph M. Farley Nuclear Plant Unit I

! Narrative Summary of Operations l l April 1997 l,

t

. The fourteenth refueling outage continued through the month of April.

The following major safety related maintenance was performed during the month:

1. 18 month maintenance outage was performed on the 1B Diesel Generator. This .

included replacing the tube bundles for the jacket water and lube oil heat  ;

exchangers.

~

The following maintenance was associated with outage activities:

1. The reactor was refueled.  ;
2. Performed pressure pulse and sludge lance cleaning of secondary side of the  !

steam generators. Test and inspection activities continued on the primary side of the steam generators.

3. Performed a reactor vessel inservice inspection.

{

4. Replaced 38 of 48 Containment Cooler cooling coils.
5. Replaced the IC Reactor Coolant Pump stator.
6. Modifications to remove the Boron Injection Tank and Spray Additive Tank j were completed.

h i

OPERATING DATA REPORT l DOCKET NO. 50-348 l DATE May 5,1997 i COMPLETED BY M. W. McAnulty TELEPHONE (334) 899-5156, ext.3640 OPERATING STATUS

1. Unit Name: Joseph M. Farley - Unit 1 Notes
2. Reporting Period: April 1997 1) Cumulative data since 12-01-77,
3. Licensed Thermal Power (MWt): 2,652 date of commercial operation.
4. Nameplate Rating (Gross MWe): 860
5. Design Electrical Rating (Net MWe): 829
6. Maximum Dependable Capacity (Gross MWe): 866
7. Maximum Dependable Capacity (Net MWe): 822
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Smce Last Report, Give Reasons: N/A
9. Power Level To Which Restricted, If Any (Net MWe): N/A
10. Reasons For Restrictions, if Any: N/A This Month Yr. to Date Cumulative
11. Hours in Reporting Period 719.0 2,879.0 170,183.0
12. Number Of Hours Reactor Was Critical 0.0 1,752.6 137,197.3
13. Reactor Reserve Shutdown Hours 0.0 0.0 3,650.0
14. Hours Generator On-line 0.0 1,752.5 135,168.2
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 0.0 4,511,632.6 348,230,639.0
17. Gross Electrical Energy Generated (MWH) 0.0 1,474,852.0 112,486,430.0
18. Net Electrical Energy Generated (MWH) (4,236.0) 1,390,856.0 106,272,812.0  ;
19. Unit Service Factor 0.0 60.9 79.4 l
20. Unit Availability Factor 0.0 60.9 79.4 )
21. Unit Capacity Factor (Using MDC Net) 0.0 58.8 76.7 l 58.3 75.3 l
22. Unit Capacity Factor (Using DER Net) 0.0
23. Unit Forced Outage Rate 0.0 0.0 5.5
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

4

25. If Shut Down at End Of Report Period, Estimated Date of Startup: 05/26/97
26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved Initial Criticality 08/06n7 08/0907 Initial Electricity 08/20n7 08/l8/77 Commercial Operation 12/0167 12/0107

. DOCKET NO. 50-348 UNIT 1 DATE May 5,1997 COMPLETED BY _ M. W. McAnulty_

TELEPHONE (334) 899-5156 ext 3640 2.

MONTII April DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0 17 0 2 0 18 0 I 3 0 19 0 4 0 20 0

.5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 9 0 25 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0 15 0 31 N/A 16 0 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.

l

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-348 UNIT NAME J. M. Farley - Unit 1 DATE May 5,1997 COMPLETED BY M. W. McAnuity REPORT MONTH April TELEPHONE (334) 899-5156, ext.3640

=.=:w-E E S T A T Y Y S 11 SC

~

P O O TO CAUSE AND CORRECTIVE E DURATION N D ED COMPONENT ACT10N TO NO. DATE (1) (llOURS) (2) (3) LER # ME CODE (5) PREVENT RECURRENCE i

- - . --- - ...L --

.n ~

from 970315.

L ._ _ _ _ _ _

I l

1: 2: 3: EVENTS REPORTED

. F: Forced Reason Method INVOLVE A S: Scheduled A . Equipment Failure (Explain) 1 Manual GREATER TilAN 20%

B Maintenance or Ten 2 ManualScram REDUCTION IN C. Refueling 3 - Automatic Scram AVERAGE DAILY ,

D. Regulatory Restriction 4 Other(Explain) POWER LEVEL FOR E Opermot Training A 1.icense Examinmion Tile PRECEDINO 24 F Administrative llOURS.

O-Operathmal Error (Explain) 1 11.Other(Explain)

m Joseph M. Farley Nuclear Plant Unit 2 Narrative Summary of Operations l April 1997 i

There were no unit shutdowns or power reductions during the month.

There was no major safety related maintenance performed during the month.

l -.

l l

l l

l l

l l

l L

l I

t

. _ _ _ . . _ _ _ . _ _ _ _ _ _ . _ . _ _ _ . _ m .-___._.__ _ . _ _ _ __ _ _ _ _______ . _____.______._.m____ .

OPERATING DATA REPORT DOCKET NO. 50-364 DATE May 5,1997 COMPLETED BY M. W. McAnulty TELEPHONE (334) 899-5156, ext.3640 OPERATING STATUS

1. Unit Name: Joseph M. Farley - Unit 2 Notes
2. Reporting Period: April 1997 1) Cumulative data since 07-30-81,
3. Licensed Thermal Power (MWt): 2,652 date ofcommercial operation.
4. Nameplate Rating (Gross MWe): 860
5. Design Electrical Rating (Net MWe): 829
6. Maximum Dependable Capacity (Gross MWe): 863.6
7. Maximum Dependable Capacity (Net MWe): 822
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Smce Last Report, Give Reasons: N/A
9. Power Level To Which Restricted, If Any (Net MWe): N/A
10. Reasons For Restrictions,If Any: N/A This Month Yr. to Date Cumulative
11. IIours in Reporting Period 719.0 2,879.0 138,096.0
12. Number OfIIours Reactor Was Critical 719.0 2,879.0 118,996.0
13. Reactor Reserve Shutdown llours 0.0 0.0 138.0
14. liours Generator On line 719.0 2,879.0 117,249.9
15. Unit Reserve Shutdown llours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWil) 1,906,788.0 7,54 ,306.8 298,989,401.0
17. Gross Electrical Energy Generated (MWII) 633,017.0 2,505,229.0 98,019,527.0
18. Net Electrical Energy Generated (MWII) 603,739.0 2,388,093.0 92,938,549.0 l
19. Unit Service Factor 100.0 100.0 84.9
20. Unit Availability Factor 100.0 100.0 84.9_
21. Unit Capacity Factor (Using MDC Net) 102.2 100.9 82.0
22. Unit Capacity Factor (Using DER Net) 101.3__ 100.1 81.2
23. Unit Forced Outage Rate 0.0 0.0 3.7
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
25. If Shut Down at End Of Report Period, Estimated Date of Startup: N/A ~
26. Units In Test Status (Prior To Commercial Operation): Forceast Achieved Initial Criticality 05/06/81 05/08/81 Initial Electricity 05/24/81 05/25/81 Cornmercial Operation 08/01/81 07/30/81 r

^~ .

  • DOCKET NO. 50-364 j l-

. UNIT 2  ;

DATE May 5,1997  ;

COMPLETED BY M. W. McAnuity l l' TELEPHONE (334) 899-5156 ext 3640 i

MONTil April ,

, DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) ,

1 846 17 842 l

2 844 18 845 3 843 19 842 4 838 20 846  ;

5 835 21 833 6 834 22 832 l 7 837 23 838 8 844 24 842 9 843 25 842 10 843 26 840 ,

11 837 27 832  !

835 l 12 836 28 l3 842 29 839  !

i 14' 845 30 839 15 844 31 N/A J 16 843 l

INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.

l . ~-

r -

a.. - UNIT SHUTDOWNS AND POWER REDUCTIONS i

DOCKET NO. 50-364  !

UNIT NAME J. M. Farley - Unit 2 DATE May 5,1997 COMPLETED BY M. W. McAnuity [

REPORT MONTil April TELEPHONE (334) 899-5156, ext.3640 R M  !

E E S ,

T A T Y Y S 11 SC j P O O TO CAUSE AND CORRECTIVE

{

E DURATION N D ED COMPONENT ACTION TO

~

NO. DATE (1) (llOURS) (2) (3) LEA # ME CODE (5) PREVENT RECURRENCE l @,_ere were no ShutdO,wns Or power reductions during the month. l l

i t

t l  !

i l

! I,

,-. - .m., .

a 1: 2: 3: EVENTS REPORTED p F; forced Reason Method INVOLVE A S: Scheduled A Equipment Failurc(Exclain) 1 Manual GREATER TilAN 20%

B Maintenance or Test 2 - Manual Scram REDUCTION IN C Refueling 3 Automatic Scram AVERAGE DAILY D Regulatory Restriction 4 Other(Explain) POWER LEVEL FOR E Operator Training & License Examination Tite PRECEDINO 24 F Administrative llOURS.

G OperationalError(Explain)

I 11 Other(Esplain)

I i

i

. . _ _