. Dav)Mirey Southern Nuct:ar Vice President Op;rati1g Company Farley Project P.O. Box 1295 Birmingham, Alabama 35201 Tel 205.992.5131 SOUTHERN COMPANY January 9, 1997 Energyto Serve %urWorld" Docket Nos. 50-348 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D C 20555 Joseph M. Farley Nuclear Plant Monthly Operating Report Ladies and Gentlemen:

Attached are the December 1996 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units I and 2, as required by Section 6.9.1.10 of the Technical Specifications.

If you have any questions, please advise.

Respectfully submitted, O'll lb Dave Morey RWC:(mor)

Attachments cc: Mr. S. D. Ebneter, Region II Administrator Mr. J.1. Zimmerman, NRR Project Manager Mr. T. M. Ross, FNP Sr. Resident Inspector l 1

Lf / l w nea $3B 9701140213 961231 PDR ADOCK 05000348 R PDR

1 Joseph M. Farley Nuclear Plant 8

Unit I

Narrative Summary of Operations l December 1996 e

1 4

i There were no unit shutdowns or major power reductions during the month.

i There was no major safety related maintenance performed during the month. ,

i J.

i 1

i i

.I i

i i

I I

l l

- . . .,. - , . ., .- 1

OPERATING DATA REPORT DOCKET NO. 50-348 DATE January 9,1997 COMPLETED BY M. W. McAnulty TELEPIIONE (334) 899-5156, ext.3640 OPERATING _ STATUS

1. Unit Name: Joseph M. Farley - Unit 1 Notes
2. Reporting Period: __ December 1996 1) Cumulative data since 12-01-77,
3. Licensed Thermal Power (MWt): 2,652 date ofcommercial operation.
4. Nameplate Rating (Gross MWe): 860
5. Design Electrical Rating (Net MWe): 829_
6. Maximum Dependable Capacity (Gross MWe): 855.7
7. Maximum Dependable Capacity (Net MWe): 812
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) smce Last Report, Give Reasons: N/A
9. Power Level To Which Restricted, If Any (Net MWe): N/A
10. Reasons For Restrictions,If Any: N/A This Month Yr. to Date Cumulative
11. Hours in Reporting Period 744.0 8,784.0 167,304.0
12. Number Of Hours Reactor Was Critical 744.0 8,755.3 135,444.7
13. Reactor Reserve Shutdown Hours 0.0 0.0 3,650.0
14. Hours Generator On line 744.0 8,740.0 133,415.7
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1,973,088.0 _

22,964,633.5 343,719,006.4 ,

17. Gross Electrical Energy Generated (MWH) 649,089.0 7,519,424.0 111,011,578.0 l
18. Net Electrical Energy Generated (MWH) 617,095.0 7,142,304.0 104,881,956.0 l
19. Unit Service Factor 100.0 99.5 79.7
20. Unit Availability Factor 100.0 99.5_ 79.7 l
21. Unit Capacity Factor (Using MDC Net) 102.1 100.l _

77.2

22. Unit Capacity Factor (Using DER Net) 100.1 98.1_ _ _ 75.6
23. Unit Forced Outage Rate 0.0 0.0 5.6
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueling Outage scheduled for March 15,1997 with a duration of 56 days.

25. If Shut Down at End Of Report Period, Estimated Date of Startup: N/A
26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved

< Initial Criticality 08/06/77 08/09/77 Initial Electricity 08/20/77 08/l8/77 Commercial Operation 12/01/77 12/01/77

DOCKET NO. 50-348 UNIT I DATE January 9,1997 COMPLETED BY M. W. McAnulty_

TELEPHONE (334) 899 5156 ext 3640 MONTH December DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 827 17 830 2 834 18 832 3 833 19 833 4 833 20 832 5 831 21 832 6 827 22 832 7 825 23 830 8 832 24 829 9 _

832 25 834 10 830 26 831 11 827 27 831 12 823 28 826 13 827 29 824 14 830 30 824 15 829 31 824 16 829 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the rcporting period. Compute to the nearest whole megawatt.

UNIT SHUTDOWNS AND POWER REDUCTIONS  ;

I I

DOCKET NO. 50-348 .

UNIT NAME J. M. Farley - Unit I  !

DATE January 9,1997 l COMPLETED BY M. W. McAnulty REPORT MONTil December TELEPHONE (334) 899-5156, ext.3640 i i

I R M E E S }

T A T Y  !

Y S II SC P O O TO CAUSE AND CORRECilVE .;

E DURATION N D ED COMPONENT ACilON TO f

NO. DATE (1) (ilOURS) (2) (3) LER # ME CODE (5) PREVENT RECURRENCE ,

i There were nO Shutdowns Or power reductions during the month.

i I

h i

1 i

l l

1: 2: 3: EVENTS REPORTED F: Forced Reason Method INVOLVE A S: Scheduled A Equipment Failure (Explain) 1 - Manual GREATER TilAN 20%

B - Maintenance or Test 2 ManualScram REDUCTION IN C- Refueling 3 Automatic Scram AVERAGE DAILY D Regulatory Restriction 4 -Other (Explain) POWER LEVEL FOR E - Operator Training & License Examination Ti!E PRECEDING 24 F Administrative IIOURS.

G OperationalError(Explain)

II Other(Explain) l j

-. . -._ - - - - ~..-.-.-..-.-..-- - ..-.-. - - . . - . . - . . - . . - -

. j Joseph M. Farley Nuclear Plant Unit 2 i Narrative Summary of Operations  !

December 1996 i

The eleventh refueling outage continued into the month of December. Initial j criticality was achieved at 0508 on December 13,1996. However, at 0147 on 1 December 14,1996, with the Unit operating in mode 2 at less than 1 percent i reactor power, the reactor was manually tripped after experiencing several Rod j Control System malfunctions during low power physics testing. LER 96-004  !

was written to report the event.

l The Rod Control System was repaired, physics testing was completed and the l Unit was synchronized to the grid at 1422 on December 18,1996. j There was no major safety related maintenance performed during the month. i l

1 l

l I

t 4

I l

l I

OPERATING DATA REPORT DOCKET NO. 50-364  !

DATE January 9,1997 l COMPLETED BY M. W. McAnulty TELEPIIONE (334) 899-5156, ext.3640 OPERATING STAT _US i

1. Unit Name: Joseph M. Farley - Unit 2 Notes
2. Reporting Period: December 1996 1) Cumulative data since 07-30-81,  ;
3. Licensed Thermal Power (MWt): 2,652 date of commercial operation. l
4. Nameplate Rating (Gross MWe): 860
5. Design Electrical Rating (Net MWe): 829
6. Maximum Dependable Capacity (Gross MWe): 863.6
7. Maximum Dependable Capacity (Net MWe): 822
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Smce Last Report, Give Reasons: N/A
9. Power Level To Which Restricted, If Any (Net MWe): N/A
10. Reasons For Restrictions, If Any: N/A l

This Month Yr. to Date Cumulative l l  !

11. Hours in Reporting Period 744.0 8,784.0 135,217.0 l
12. Number Of Hours Reactor Was Critical 372.7 7,213.6 116,117.0  !
13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0
14. Hours Generator On-line 321.6 7,160.6 114,370.9
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 749,110.0 18,474,303.8 291,448,094.2
17. Gross Electrical Energy Generated (MWH) 245,688.0 6,051,819.0 95,514,298.0
18. Net Electrical Energy Generated (MWII) 220,662.0 5,736,805.0 90,550,456.0
19. Unit Service Factor 43.2 81.5 84.6
20. Unit Availability Factor 43.2 81.5 84.6
21. Unit Capacity Factor (Using MDC Net) 36.1 79.5 81.7
22. Unit Capacity Factor (Using DER Net) _ 35.8 78.8 80.8
23. Unit Forced Outage Rate 0.0 0.0 3.7
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
25. If Shut Down at End Of Report Period, Estimated Date of Startup: N/A
26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved Initial Criticality 05/06/81 05/08/81 Initial Electricity 05/24/81 05/25/81 Commercial Operation 08/01/81 07/30/81 l

l

l DOCKET NO. 50-364 UNIT 2 DATE January 9,1997 COMPLETED BY M. W. McAnulty TELEPHONE (334) 899-5156 ext 3640 MONTH December DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net)  ;

l 1 0 17 0 2 0 18 29 +

3 0 19 172 4 0 20 378  ;

5 0 21 706 >

6 0 22 838 7 0 23 840 8 0 24 842  ;

9 0 25 848 10 0 26 845 11 0 27 842 12 0 28 835 13 0 29 833 ,

14 0 30 832 15 0 31 834 16 0 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.

)

_ . . . . . _ _ _l UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-364 UNIT NAME J. M. Farley - Unit 2 '

DATE January 9,1997 COMPLETED BY M. W. McAnulty REPORTMONTH December TELEPHONE (334) 899-5156, ext.3640 R M E E S T A T Y Y S 11 SC P O O TC CAUSE AND CORRECTIVE  ;

E DURATION N D ED COMPONENT ACrlON TO NO. DATE (1) (IIOURS) (2) (3) LER # ME CODE (5) PREVENT RECURRENCE i

I

~6~11 T6Tlif2 S 422 C-'1 N/A N/A N/A The eleventh refueling Outage continued  ;

from 961012.

i i

The generator was Synchronized to the  :

grid at 1422 on December 18,1996.

l l

}

}

l l

l l

l l

l t

l 1: 2: 3: EVENTS REPORTED F: Forced Reason Method INVOLVE A S: Scheduled A - Equipment Failure (Explain) 1 Manual GREATER TilAN 20%

B - Maintenance cr Test 2 Manual Scram REDUCTION IN C - Refueling 3 - Automatic Scram AVERAGE DAILY i D - Regulatory Restriction 4 Other(Exnlain) POWER LEVEL FOR E Operator Training & License Examination TIIE PRECEDING 24 F- Administrative llOURS.  :

1 G -Operational Error (Explain)

II Other(Explain) 1

. . -