ife.

[

OPERATING DATA REPORT DOCKET No. 50-364 DATE 1/3/90 COMPLETED BY D. N. Morey TELEPHONE (205)899-5156

~0PERATING STATUS Notes ile Unit Names Joseph H. Farley - Unit 2 1) Cumulative data since 2e Reporting Period: December 1989 7-30-81, date of ,

3.' Licensed Thermal Power (MVt): 2,652 commercial operation.

4.: Nameplate Rating (Gross MVe): . 860

5. Design Electrical Rating (Net MVe): 829
6. Maximum Dependable Capacity (Gross MVe): 870.3 ,

-7. Maximum Dependable Capacity (Net MVe): 829.7 80;If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A

.9.~ Power Level To Which Restricted, If Any (Net MVe): N/A

10. Reasons For Restrictions, If Any: N/A This Month Yr-to-Date Cumulative i
11. Hours In Reporting Period 744 8,760 73,849
13. Number Of Hours Reactor Vas Critical 744.0 7,205.2 63,883.1 l
13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0 E 14. Hours Generator On-Line 744.0 7,039.4 63,072.0 l 15. Unit Reserve Shutdown Hours 0.0 0.0- 0.0 l~ 16. Gross Thermal Energy Generated (MWH) 1,971,879 18,058,631 160,256,267 17.' Gross Electrical Energy Generated (MVH) 657,658 5,931,056 52,666,542
18. Net Electrical Energy Generated (MVH) 627,692 5,618,104 49,943,390 19.; Unit Service Factor 100.0 80.4- 85.4 20.f Unit Availability Factor 100.0 80.4 85.4

- 21. Unit Capacity Factor (Using MDC Net) 101.7 77.3 82.7 .

l 123. Unit Capacity Factor (Using DER Net) 101.8 77.4 81.6 '

23. Unit Forced Outage Rate 0 4.7 4.6 24.-Shutdowns Scheduled Over Next 6 Months (Type, Date, an3 Duration of Each):

N/A

. 25 If Shut Down At End Of Report Period, Estimated Date of Startup: N/A

26. Units In Test Status (Prior to' Commercial Operation): Forecast Achieved INITIAL CRITICALITY 05/06/81 05/08/81 INITIAL ELECTRICITY 05/24/81 05/25/81 CONMERCIAL OPERATION UB/01/81 07/30/81 Form'2/30 '

9007190150 900711 PDR ADOCK 0500036,4 R PDC