Monthly Operating Repts for Aug 1996 for Jm Farley Nuclear Plant Units 1 & 2
ML20117M129
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 08/31/1996
From: Mcanulty M, Woodard J
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9609170312
Download: ML20117M129 (9)


Text

, Southern 9duclear Operating Company

' i

. Post Office Box 1295

. Birmingham. Alabama 35201 Telephone (2,05) 868 5086 L

J. D. Woodard Executive %ce President Southern Nudear Operating Company -

l e southem elecMc system i September 9, 1996 l

I l

l Docket Nos. 50-348 50-364 l

U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D C 20555 Joseph M. Farley Nuclear Plant Monthly Operating Report Ladies and Gentlemen:

Attached are the August 1996 Monthly Operating Reports for Joseph M. Farley Nuclear Plant j Units I and 2, as required by Section 6.9.1.10 of the Technical Specifications.

l If you have any questions, please advise.

Respectfully submitted, J. oodard RWC:(mor) l Attachments cc: Mr. S. D. Ebneter, Region II Administrator 3 Mr. J. I. Zimmerman, NRR Project Manager Mr. T. M. Ross, FNP Resident inspector h9170312960831 R ADOCK 0500034s PDR

?. R 10"Q lh $

feyj * /

~

1 l

1 Joseph M. Farley Nuclear Plant Unit 1 Narrative Summary of Operations August 1996 I

There were no unit shutdowns or major power reductions during the month.

There was no major safety related maintenance performed during the month. ;

l l

l 1

1 I

r l

l

i

)

OPERATING DATA REPORT I DOCKET NO. 50-348 {

DATE September 5,1996 COMPLETED BY M. W. McAnulty_ {

TELEPilONE (334) 899-5156, ext.3640

{

OPERATING STATUS '

l. Unit Name: Joseph M. Farley - Unit 1 Notes
2. Reporting Period: August 1996 1) Cumulative data since 12-01-77, )
3. Licensed Thermal Power (MWt): 2,652 date of commercial operation.
4. Nameplate Rating (Gross MWe): 860
5. Design Electrical Rating (Net MWe): 829
6. Maximum Dependable Capacity (Gross MWe): 855.7
7. Maximum Dependable Capacity (Net MWe): 812
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Smce Last Report, Give Reasons: N/A

~

9. Vower Level To Which Restricted, If Any (Net MWe): N/A
10. Reasons For Restrictions,If Any: N/A This Month Yr. to Date Cumulative I

l!.11ours in Reporting Period 744.0 5,855.0 164,375.0

12. Number OfIlours Reactor Was Critical _

744.0 5,826.3 132,515.7

13. Reactor Reserve Shutdown Ilours 0.0 0.0 3,650.0
14. IIours Generator On-line 744.0 5,811.0 130,486.7
15. Unit Reserve Shutdown IIours 0.0 0.0 0.0 ,
16. Gross Thermal Energy Generated (MWII) 1,972,106.8 15,197,774.1 335,952,147.0 l
17. Gross Electrical Energy Generated (MWII) 639,927.0 4,y74,544.0 108,466,698.0
18. Net Electrical Energy Generated (MWII) 607,423.0 4,7 3,602.0 102,463,254.0
19. Unit Service Factor 100.0 99.2 79.4
20. Unit Availability Factor 100.0 99.2 79.4
21. Unit Capacity Factor (Using MDC Net) 100.5 99.4 76.8
22. Unit Capacity Factor (Using DER Net) 98.5 97.3 75.2
23. Unit Forced Outage Rate 0.0 0.0 5.7
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each':  ;
25. IfShut DodsatTn~d Of Report Period, Estimated Date of Startup: N/A l l
26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved Initial Criticality 08/06/77 _

08/09/77 Initial Electricity 08/20/77 08/18/77 Commercial Operation _ 12/01/77 12/01/77

DOCKET NO. 50-348

, UNIT 1 DATE September 5,1996 COMPLETED BY M. W. McAnulty TELEPHONE (334) 899-5156 ext 3640 MONTH August DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) l 1 816 17 817 l l

2 616 18 817 1 3 815 19 818 _

l 4 814 20 817 5 816 21 818 6 816 22 821 7 814 23 819 8 812 24 816 9 816 25 817 l

10 816 26 819 11 799 27 818 12 815 28 818 13 817 29 819 14 820 30 819 15 819 31 821 16 819 l

INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the l reporting period. Compute to the nearest whole megawatt.

4

. UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-348 UNIT NAME J. M. Farley - Unit 1 DATE September 5,1996 COMPLETED BY M. W. McAnulty REPORT MONTH August TELEPHONE (334) 899-5156, ext.3640 q

E E S T A T Y Y S 11 SC P O O TO CAUSE AND CORRECTIVE E DURATION N D ED COMPONENT ACTION TO NO. DATE (1) (IIOURS) (2) (3) LER # ME CODE (5) PREVENT RECURRENCE There were nO Shutdowns Or power reductions during the month.

I L__._ _ m_J __ m__m _ _._1 - _ . _ _j 1: 2: 3: EVENTS REPORTED F: Forced Reason Method INVOLVE A S: Scheduled A Equipment Failure (Explain) 1 Manual GREATER TIMN 20%

D Maintenance or Test 2 ManualScram REDUCTION IN C - Refueling 3 - Automatic Scram AVERAGE DAILY D - Regulatory Restriction 4 -Other (Explain) POWER LEVEL FOR .

E - Operator Training & License Examination Tile PRECEDING 24 I F - Administrative liOURS.

G Operational Error (Explain)

II Other(Explain)

i j -

)

i Joseph M. Farley Nuclear Plant 3

Unit 2 i Narrative Summary of Operations

, August 1996 i

4 There were no unit shutdowns or major power reductions during the month.

i i There was no major safety related maintenance performed during the month. l l )

4 i

i l

i l

.' OPERATING DATA REPORT

. DOCKET NO. 50-364 DATE Septemb::r 5,1996 COMPLETED BY M. W. McAnulty_

TELEPIlONE (334) 899-5156, ext.3640 OPERATING STATUS

1. Unit Name: Joseph M. Farley - Unit 2 Notes
2. Reporting Period: August 1996 1) Cumulative data since 07-30-81,
3. Licensed Thermal Power (MWt): 2,652 date of commercial operation.
4. Nameplate Rating (Gross MWe): 860
5. Design Electrical Rating (Net MWe): 829
6. Maximum Dependable Capacity (Gross MWe): 863.6
7. Maximum Dependable Capacity (Net MWe): 822
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Smce Last Report, Give Reasons: N/A _ _ _
9. Power Level To Which Restricted, if Any (Net MWe): N/A
10. Reasons For Restrictions,If Any: N/A __

This Month Yr. to Date Cumulative

11. Hours in Reporting Period 744.0 5,855.0 132.288.0
12. Number Ofliours Reactor Was Critical 744.0 5,855.0 114,758.4
13. Reactor Reserve Shutdown liours 0.0 0.0 138.0
14. liours Generator On-line 744.0 5,855.0 113,065.2
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 ,
16. Gross Thermal Energy Generated (MWII) 1,972,154.5 15,137,557.8 288,111,348.2 I
17. Gross Electrical Energy Generated (MWli) 641,987.0 _

4,964,377.0 94,426J56.0 '

18. Net Electrical Energy Generated (MWli) 611,557.0 4,723,871.0 89,537,522.0
19. Unit Service Factor 100.0 100.0 85.5
20. Unit Availability Factor 100.0 100.0 85.5
21. Unit Capacity Factor (Using MDC Net) 100.0 98.2 82.6
22. Unit Capacity Factor (Using DER Net) 99.2 97.3 31.6
23. Unit Forced Outage Rate 0.0 0.0 3.8
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueling _ O_utage scheduled for October 12,1996 with a duration of 48 days

25. If5 hut Down at End Of Report Period, Estimated Date of Startup- N/A
26. Units in Test Status (Prior To Commercial Operation): Forecast Achieved Initial Criticality _

05/06/81 05/08/81 Initial Electricity 05/24/81 05/25/81 Commercial Operation 08/01/81 07/30/81

=

.. DOCKET NO. 50-364

' UNIT 2 DATE_ September 5,1996 COMPLETED BY M. W. McAnuity_.

TELEPHONE (334) 899-5156 ext 3640 {

MONTH August DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER I.EVEL  !

(MWe-Net) (MWe-Net) 1 821 17 823 2 822 ' 18 822 3 819 19 824 4 818 20 823 _

5 822 21 823 6 S22 22 825 7 822 23 823 8 821 24 814 9 823 25 817 10 821 26 825 11 819 27 821 12 822 28 821 13 823 29 822  :

14 827 30 825 15 826 31 826 16 826 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.

l

.< UNIT SilUTDOWNS AND POWER REDUCTIONS DOC KET NO. 50-364 UNIT NAME J. M. Farley - Unit 2 t DATE September 5,1996 COMPLETED BY M. W. McAnulty REPORT MONTli August TELEP110NE (334) 899-5156, ext.3640

? ,

i E E S T A T Y l j Y S I S C

P O O TO CAUSE AND CORRECTIVE E DURATION N D ED COMPONENT ACTION TO NO. DATE (1) (IIOURS) (2) (3) LER # ME CODE (5) PREVENT RECURRENCE i k__m _ _.E j There were nO ShaownS Or power reductions during the month.

I l i i i l 1 1 4

I i

I

-- w 1: 2: 3: EVENTS REPORTED F: Forced Reason Method INVOLVE A S: Scheduled A Equipment Failure (Explain) 1 - Manual GREATER TilAN 20%

!!- Maintenance or Test 2 - Manual Scram REDUCTION IN C Refueling 3. Automatic Scram AVERAGE DAILY D Regulatory Restriction 4 - Other (Explain) POWER LEVEL FOR E - Operator Training & License Examination TIIE PRECEDING 24 F Administrative IIOURS.

G Operational Error (Explain)

II- Other (Explain)