ML20210R603

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for July 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With
ML20210R603
Person / Time
Site: Farley  
Issue date: 07/31/1999
From: Marlar W, Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NEL-99-0290, NUDOCS 9908170158
Download: ML20210R603 (6)


Text

(T; r

~. *

  • Dave Morey Southern Nuclear Vice President.

Operating Company Farley Project P.O. Box 1295 Birmingham. Alabama 35201 l

Tel 205.992.5131 August'11 V1999 SOUTHERN COMPANY

' Docket Nos.:

50-348

  1. "' T " #'
  • I" #" #

50-364 Ilf.

NEL-99-0290 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant Monthly Operating Report Ladies and Gentlemen:

Enclosed are the July 1999 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2, as required by Section 6.9.1.10 of the Technical Specif' cations.

If you have any questions, please advise.

I Respectfully submitted, Dave Morey-RWC:mor

Enclosures:

1. July Monthly Operating Report for Plant Farley Unit 1
2. July Monthly Operating Report for Plant Farley Unit 2 l

9908170158 990731 "

l PDR ADOCK 0 6 R

PDR m

., ~

Page 2 U. S. Nuclear Regulatory Commission

'cc:

Southern Nuclear Operating Company

- Mr. L. M. Stinson, General Manager

"'i U. S. Nuclear Regulatory Commission, Washington, D. C.

Mr. L. M. Padovan, Licensing Project Manager - Farley

. U. S. Nuclear Regulatory Commission, Region II Mr. L. A. Reyes, Regional Admini:trator

- Mr. T. P. Johnson, Senior Resident inspector - Farley I

l 1

t i

i

OPERATING DATA REPORT DOCKET NO.:

50-348 UNIT NAME:

J. M. Farley - Unit 1 DATE:

August 3.1999 COMPLETED BY:

W. L. Marlar l

TELEPHONE:

0 34) 814-4554 OPERATING STATUS 1.

Reporting Period:

JULY 1999 2.

Design Electrical Rating (Net MWe):

854 3.

Maximum Dependable Capacity (Net MWe):

847 This Month Year to Date Cumulative 4.

Number Of Hours Reactor Was Critical:

744.0 5,049.2 153,952.4 5.

Hours Generator On-line:

744.0 5.022.6 151,782.3 6.

Unit Reserve Shutdown Hours:

0.0 0.0 0.0 7.

Net Electrical Energy Generated (MWH):

619,390.0 4,157,623.0 119,691,940.0 CHALLENGES TO PRESSURIZER PORY OR PRESSURIZER SAFETY VALVES i

Date Tag No.

Event Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.

l l

El-1

g..

UNIT SHUTDOWNS DOCKET NO.:

50 348 UNIT NAME:

J. M. Farley - Unit 1 DATE:

August 3,1999 COMPLETED BY W. L. Marlar REPORTING PERIOD:

JULY 1999 TELEPHONE:

(334) 814-4554 Type Method of F: Forced Duration Reason Shutting Down Cause/ Corrective Actions No.

Date S: Scheduled (Hours)

(1)

(2)

Comments There were no unit shutdowns during the month.

(l) RLA50N.

(2) MLTilOD A. Equipment Failure (Explain)

I. Manual B. Mamtenance or Test

2. Manual Trip / scram C - Refuelmg 3 - Automatic Trip / scram D. Regulatory Restnction
4. Continuation E. Operator Training / License Exammation 5 - Other(Explain)

F. Administrative G. Operational Error (Explain)

H. Other(Explain)

CAUSE/ CORRECTIVE ACTION / COMMENTS NARRATIVE REPORT There were no significant power reductions this period.

El-2 i

i

h,

~~

OPERATING DATA REPORT DOCKET NO.:

50-364 UNIT NAME:

J. M. Farley - Unit 2

)

DATE:

August 3.1999 COMPLETED BY:

w. L. Marlar TELEPHONE:

0 34)sl4-4554 OPERATING STATUS 1.

Reporting Period:

JULY 1999 2.

Design Electrical Rating (Net MWe):

855 3.

Maximum Dependable Capacity (Net MWe):

852 This Month Year to Date Cumulative 4.

Number Of Hours Reactor Wss Critical:

744.0 5,029.4 137,497.8 5.

Hours Generator On-line:

744.0 5,017.2 135,662.6 6.

Unit Reserve Shutdown Hours:

0.0 0.0 0.0 7.

Net Electrical Energy Generated (MWH):

625,248.0 3,723,910.0 107,823,196.0 CHALLENGES TO PRESSURIZER PORV OR PRESSURIZER SAFETY VALVES Date Tag No.

Event Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.

E2-1

UNIT SHUTDOWNS DOCKET NO.:

50-364 UNIT NAME:

J. M. Farley - Unit 2 DATE:

August 3,1999 COMPLETED BY W. L Marlar REPORTING PERIOD:

JULY 1999 TELEPilONE:

(334) 814-4554 Type Method of F: Forced Duration Reason Shutting Down Cause/ Corrective Actions No.

Date S: Scheduled (Hours)

(1)

(2)

Comments There were no unit shutdowns during the month.

(1) REASON.

(2) METliOD.

A - Equipment Failure (Explain) 1 - Manual B MaintenanceorTest 2 ManualTrip/ Scram C Refueling 3 - Automatic Trip / Scram D Regulatory Restriction 4 Continuation E-Operator Training / License Examination 5 -Other(Explain)

F-Administrative 0 - operational Error (Explam) 11-Other (Explain)

CAUSE/ CORRECTIVE ACTION / COMMENTS NARRATIVE REPORT There were no significant power reductions this period.

E2-2