Text
(T; r
~. *
- Dave Morey Southern Nuclear Vice President.
Operating Company Farley Project P.O. Box 1295 Birmingham. Alabama 35201 l
Tel 205.992.5131 August'11 V1999 SOUTHERN COMPANY
' Docket Nos.:
50-348
- "' T " #'
- I" #" #
50-364 Ilf.
NEL-99-0290 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant Monthly Operating Report Ladies and Gentlemen:
Enclosed are the July 1999 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2, as required by Section 6.9.1.10 of the Technical Specif' cations.
If you have any questions, please advise.
I Respectfully submitted, Dave Morey-RWC:mor
Enclosures:
- 1. July Monthly Operating Report for Plant Farley Unit 1
- 2. July Monthly Operating Report for Plant Farley Unit 2 l
9908170158 990731 "
l PDR ADOCK 0 6 R
PDR m
., ~
Page 2 U. S. Nuclear Regulatory Commission
'cc:
Southern Nuclear Operating Company
- Mr. L. M. Stinson, General Manager
"'i U. S. Nuclear Regulatory Commission, Washington, D. C.
Mr. L. M. Padovan, Licensing Project Manager - Farley
. U. S. Nuclear Regulatory Commission, Region II Mr. L. A. Reyes, Regional Admini:trator
- Mr. T. P. Johnson, Senior Resident inspector - Farley I
l 1
t i
i
OPERATING DATA REPORT DOCKET NO.:
50-348 UNIT NAME:
J. M. Farley - Unit 1 DATE:
August 3.1999 COMPLETED BY:
W. L. Marlar l
TELEPHONE:
0 34) 814-4554 OPERATING STATUS 1.
Reporting Period:
JULY 1999 2.
Design Electrical Rating (Net MWe):
854 3.
Maximum Dependable Capacity (Net MWe):
847 This Month Year to Date Cumulative 4.
Number Of Hours Reactor Was Critical:
744.0 5,049.2 153,952.4 5.
Hours Generator On-line:
744.0 5.022.6 151,782.3 6.
Unit Reserve Shutdown Hours:
0.0 0.0 0.0 7.
Net Electrical Energy Generated (MWH):
619,390.0 4,157,623.0 119,691,940.0 CHALLENGES TO PRESSURIZER PORY OR PRESSURIZER SAFETY VALVES i
Date Tag No.
Event Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.
l l
El-1
g..
UNIT SHUTDOWNS DOCKET NO.:
50 348 UNIT NAME:
J. M. Farley - Unit 1 DATE:
August 3,1999 COMPLETED BY W. L. Marlar REPORTING PERIOD:
JULY 1999 TELEPHONE:
(334) 814-4554 Type Method of F: Forced Duration Reason Shutting Down Cause/ Corrective Actions No.
Date S: Scheduled (Hours)
(1)
(2)
Comments There were no unit shutdowns during the month.
(l) RLA50N.
(2) MLTilOD A. Equipment Failure (Explain)
I. Manual B. Mamtenance or Test
- 2. Manual Trip / scram C - Refuelmg 3 - Automatic Trip / scram D. Regulatory Restnction
- 4. Continuation E. Operator Training / License Exammation 5 - Other(Explain)
F. Administrative G. Operational Error (Explain)
H. Other(Explain)
CAUSE/ CORRECTIVE ACTION / COMMENTS NARRATIVE REPORT There were no significant power reductions this period.
El-2 i
i
h,
~~
OPERATING DATA REPORT DOCKET NO.:
50-364 UNIT NAME:
J. M. Farley - Unit 2
)
DATE:
August 3.1999 COMPLETED BY:
- w. L. Marlar TELEPHONE:
0 34)sl4-4554 OPERATING STATUS 1.
Reporting Period:
JULY 1999 2.
Design Electrical Rating (Net MWe):
855 3.
Maximum Dependable Capacity (Net MWe):
852 This Month Year to Date Cumulative 4.
Number Of Hours Reactor Wss Critical:
744.0 5,029.4 137,497.8 5.
Hours Generator On-line:
744.0 5,017.2 135,662.6 6.
Unit Reserve Shutdown Hours:
0.0 0.0 0.0 7.
Net Electrical Energy Generated (MWH):
625,248.0 3,723,910.0 107,823,196.0 CHALLENGES TO PRESSURIZER PORV OR PRESSURIZER SAFETY VALVES Date Tag No.
Event Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.
E2-1
UNIT SHUTDOWNS DOCKET NO.:
50-364 UNIT NAME:
J. M. Farley - Unit 2 DATE:
August 3,1999 COMPLETED BY W. L Marlar REPORTING PERIOD:
JULY 1999 TELEPilONE:
(334) 814-4554 Type Method of F: Forced Duration Reason Shutting Down Cause/ Corrective Actions No.
Date S: Scheduled (Hours)
(1)
(2)
Comments There were no unit shutdowns during the month.
(1) REASON.
(2) METliOD.
A - Equipment Failure (Explain) 1 - Manual B MaintenanceorTest 2 ManualTrip/ Scram C Refueling 3 - Automatic Trip / Scram D Regulatory Restriction 4 Continuation E-Operator Training / License Examination 5 -Other(Explain)
F-Administrative 0 - operational Error (Explam) 11-Other (Explain)
CAUSE/ CORRECTIVE ACTION / COMMENTS NARRATIVE REPORT There were no significant power reductions this period.
E2-2