Monthly Operating Repts for July 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With
ML20210R603
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 07/31/1999
From: Marlar W, Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NEL-99-0290, NUDOCS 9908170158
Download: ML20210R603 (6)


Text

-

(T; r '

~.** Dave Morey Southern Nuclear Vice President . Operating Company

,. Farley Project P.O. Box 1295 Birmingham. Alabama 35201 l

Tel 205.992.5131 August'11 V1999 SOUTHERN

' Docket Nos.: 50-348 COMPANY 50-364 #"' T " #'

  • I" #" #

Ilf. NEL-99-0290 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant l Monthly Operating Report Ladies and Gentlemen:

Enclosed are the July 1999 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2, as required by Section 6.9.1.10 of the Technical Specif' cations.

If you have any questions, please advise.

I Respectfully submitted, Dave Morey-l RWC:mor

Enclosures:

1. July Monthly Operating Report for Plant Farley Unit 1
2. July Monthly Operating Report for Plant Farley Unit 2 l

l ,

9908170158 990731 "

PDR ADOCK 0PDR 6 R _.

m

.,~

Page 2 U. S. Nuclear Regulatory Commission

  • 'cc: Southern Nuclear Operating Company

- Mr. L. M. Stinson, General Manager

"'i U. S. Nuclear Regulatory Commission, Washington, D. C.

Mr. L. M. Padovan, Licensing Project Manager - Farley

. U. S. Nuclear Regulatory Commission, Region II Mr. L. A. Reyes, Regional Admini:trator

- Mr. T. P. Johnson, Senior Resident inspector - Farley I

l t

1 i

i

OPERATING DATA REPORT DOCKET NO.: 50-348 UNIT NAME: J. M. Farley - Unit 1 DATE: August 3.1999 COMPLETED BY: W. L. Marlar l TELEPHONE: 0 34) 814-4554 OPERATING STATUS

1. Reporting Period: JULY 1999
2. Design Electrical Rating (Net MWe): 854
3. Maximum Dependable Capacity (Net MWe): 847 This Month Year to Date Cumulative
4. Number Of Hours Reactor Was Critical: 744.0 5,049.2 153,952.4
5. Hours Generator On-line: 744.0 5.022.6 151,782.3
6. Unit Reserve Shutdown Hours: 0.0 0.0 0.0
7. Net Electrical Energy Generated (MWH): 619,390.0 4,157,623.0 119,691,940.0 CHALLENGES TO PRESSURIZER PORY OR PRESSURIZER SAFETY VALVES i Date Tag No. Event Description l

There were no challenges to Pressurizer PORV or  !

Pressurizer Safety Valves.

l I

l El-1

g..

UNIT SHUTDOWNS DOCKET NO.: 50 348 UNIT NAME: J. M. Farley - Unit 1 DATE: August 3,1999 COMPLETED BY W. L. Marlar REPORTING PERIOD: JULY 1999 TELEPHONE: (334) 814-4554 Type Method of F: Forced Duration Reason Shutting Down Cause/ Corrective Actions No. Date S: Scheduled (Hours) (1) (2) Comments There were no unit shutdowns during the month.

(l) RLA50N. (2) MLTilOD A . Equipment Failure (Explain) I . Manual B . Mamtenance or Test 2. Manual Trip / scram C - Refuelmg 3 - Automatic Trip / scram D . Regulatory Restnction 4. Continuation E . Operator Training / License Exammation 5 - Other(Explain)

F. Administrative G . Operational Error (Explain)

H. Other(Explain)

CAUSE/ CORRECTIVE ACTION / COMMENTS NARRATIVE REPORT There were no significant power reductions this period.

El-2 i i

h,'

~~

OPERATING DATA REPORT DOCKET NO.: 50-364 UNIT NAME: J. M. Farley - Unit 2

)

DATE: August 3.1999 COMPLETED BY: w. L. Marlar TELEPHONE: 0 34)sl4-4554 OPERATING STATUS

1. Reporting Period: JULY 1999
2. Design Electrical Rating (Net MWe): 855
3. Maximum Dependable Capacity (Net MWe): 852 This Month Year to Date Cumulative
4. Number Of Hours Reactor Wss Critical: 744.0 5,029.4 137,497.8
5. Hours Generator On-line: 744.0 5,017.2 135,662.6
6. Unit Reserve Shutdown Hours: 0.0 0.0 0.0
7. Net Electrical Energy Generated (MWH): 625,248.0 3,723,910.0 107,823,196.0 CHALLENGES TO PRESSURIZER PORV OR PRESSURIZER SAFETY VALVES Date Tag No. Event Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.

E2-1 l

UNIT SHUTDOWNS DOCKET NO.: 50-364 UNIT NAME: J. M. Farley - Unit 2 DATE: August 3,1999 COMPLETED BY W. L Marlar REPORTING PERIOD: JULY 1999 TELEPilONE: (334) 814-4554 Type Method of F: Forced Duration Reason Shutting Down Cause/ Corrective Actions No. Date S: Scheduled (Hours) (1) (2) Comments There were no unit shutdowns during the month.

(1) REASON. (2) METliOD.

A - Equipment Failure (Explain) 1 - Manual B MaintenanceorTest 2 ManualTrip/ Scram C Refueling 3 - Automatic Trip / Scram D Regulatory Restriction 4 Continuation E- Operator Training / License Examination 5 -Other(Explain)

F- Administrative 0 - operational Error (Explam) 11- Other (Explain)

CAUSE/ CORRECTIVE ACTION / COMMENTS NARRATIVE REPORT There were no significant power reductions this period.