L Dave Morey S:vthern Nucle:r Vice President Operating Company farley Project RO. Box 1295 Birmingham. Alabama 35201 Tel 205.992.5131 SOUTHERN h*
COMPANY May 11a 1998 Energy toServeYour%rld" 1
Docket Nos.
50-348 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D C 20555 Joseph M. Farley Nuclear Plant Monthly Operating Report Ladies and Gentlemen:
Enclosed are the April 1998 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2, as required by Section 6.9.1.10 of the Technical Specifications.
If you have any questions, please advise.
Respectfully submitted,
%g Dave Morey RWC:(mor)
Enclosures E1 - April Monthly Operating Report for Plant Farley Unit 1 E2 - April Monthly Operating Report for Plant Farley Unit 2 cc: Mr. L. A. Reyes, Region II Administrator Mr. J. I. Zimmerman, NRR Project Manager Mr. T. M. Ross, FNP Sr. Resident inspector
(-
[
a
_Jud**
goSt O k
/
8 R
OPERATING DATA REPORT DOCKET NO.:
50-348 I
UNIT NAME:
J. M. Farley - Unit I _,_
DATE:
May 4,1998 COMPLETED BY:
- 11. J. Jones TELEPIIONE:
(334) 899-5156, ext. 365 I
OPERATING STATUS l
\\
l 1.
Reporting Period:
April 1998 2.
Design Electrical Rating (Net MWe):
829 3.
Maximum Dependable Capacity (Net MWe):
822 i
l This Month Year to Date Cumulative I
4.
Number Of Hours Reactor Was Critical:
719.0 2,879.0 145,160.6 5.
Hours Generator On-line:
719.0 2,879.0 143,098.4 6.
Unit Reserve Shutdown Hours:
0.0 0.0 0.0 7.
Net Electrical Energy Generated (MWH):
591,718.0 2,380,757.0 112,681,085.0 i
l I
CIIALLENGES TO PRESSURIZER PORY OR PRESSURIZER SAFETY VALVES l
Date
! lag No.
I Event Description l
l There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.
I i
El-1 1
j
l l
2 l
UNIT SHUTDOWNS i
l DOCKET NO.:
50-348 l
UNIT NAME:
J. M. Farley - Unit l_
DATE:
May 4,1998 COMPLETED BY:
- 11. J. Jones REPORTING PERIOD: April 1998 TELEPIIONE:
(334) 899-5156, ext. 3628 i
Type Method of F: Forced Duration Reason Shutting Down Cause/ Corrective Actions No.
Date S: Scheduled (Hours)
(1)
(2)
Comments There were no unit shutdowns during the month.
l (1) KLANUN.
(2) MLillVD.
A - Equipment railure (Explain) 1 - Manual II Maintenance or Test 2 - Manual Trip / Scram C - Refueling 3 - Automatic Trip / Scram D-Regulatory Restriction 4 - Continuation E - operator Training / License Examination 5 -other (Explain) l'. Administrative G OperationalError(Explain) 11 Other(Explain)
CAUSE/ CORRECTIVE ACTION / COMMENTS NARRATIVE REPORT At 1304 on 980429, with the unit operating at 100% reactor power, the unit was ramped to 80% reactor power to repair a cooler leak in the 1 A Condensate Pump Motor. The cooler was repaired and the lower motor bearing replaced. The unit was returned to 100% reactor power at 1755 on 980430.
1 El-2 J
(
OPERATING DATA REPORT DOCKET NO.:
50-364 l
UNIT NAME:
J. M. Farley - Unit 2 DATE:
May 4,1998 COMPLETED BY:
11.J. Jones TELEPilONE:
(334) 899-5156, ext. 3658 OPERATING STATUS l
1.
Reporting Period:
April 1998 2.
Design Electrical Rating (Net MWe):
829 3.
Maximum Dependable Capacity (Net MWe):
828 l
This Month Year to Date Cumulative 4.
Number Of Hours Reactor Was Critical:
0.0 2,065.4 126,982.4 5.
Ilours Generator On-line:
0.0 2,065.1 125,196.0 6.
Unit Reserve Shutdown liours:
0.0 0.0 0.0 7.
Net Electrical Energy Generated (MWII):
0.0 1,732,150.0 99,563,514.0 CIIALLENGES TO PRESSURIZER PORY OR PRESSURIZER SAFETY VALVES Date l Iag No.
I Event Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.
l E2-1
l i
UNIT SHUTDOWNS l
l DOCKET NO.:
50-364 UNIT NAME:
J. M. Farley - Unit 2 DATE:
May_4,1998 l
COMPLETED BY:
1-1. J. Jones REPORTING PERIOD: April 1998 TELEPIIONE:
(334) 899-5156, ext. 3628 Type Method of F: Forced Duration Reason Shutting Down Cause/ Corrective Actions No.
Date S: Scheduled (Hours)
(1)
(2)
Comments 001 980328 S
719 C
1 The twelfth refueling outage continued from 980328.
i l
I i
(1) KLAsVN.
(2) MLillVL).
A - Equipment failure (Explain) 1 - Manual H Maintenance or Test 2 - Manual Trip / Scram C - Refueling 3 - Automatic Trip / scram D - Regulatory Restriction 4 - Continuation E - operator Training / License Examination 5 -other (Explain)
F Administrative G operational Error (lixplain) 11 - other (Explain)
CAUSE/ CORRECTIVE ACTION / COMMENTS NARRATIVE REPORT Completed the following Refueling Outage Activities; RCP Stator Winding Assembly Replacement - 10 Year Inspection Spray Add Tank Removal Modification Fuel Oxide Measurements RHR Heat Exchanger Head Gasket Replacement Core Reload Steam Generator Eddy Current Testing E2-2
_ _ _ _ _ _ _ _ _ -