__

L Dave Morey S:vthern Nucle:r Vice President Operating Company farley Project RO. Box 1295 Birmingham. Alabama 35201 Tel 205.992.5131 SOUTHERN h*

COMPANY May 11a 1998 Energy toServeYour%rld" 1

Docket Nos.

50-348 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D C 20555 Joseph M. Farley Nuclear Plant Monthly Operating Report Ladies and Gentlemen:

Enclosed are the April 1998 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2, as required by Section 6.9.1.10 of the Technical Specifications.

If you have any questions, please advise.

Respectfully submitted,

%g Dave Morey RWC:(mor)

Enclosures E1 - April Monthly Operating Report for Plant Farley Unit 1 E2 - April Monthly Operating Report for Plant Farley Unit 2 cc: Mr. L. A. Reyes, Region II Administrator Mr. J. I. Zimmerman, NRR Project Manager Mr. T. M. Ross, FNP Sr. Resident inspector

(-

[

a

_Jud**

goSt O k

/

8 R

OPERATING DATA REPORT DOCKET NO.:

50-348 I

UNIT NAME:

J. M. Farley - Unit I _,_

DATE:

May 4,1998 COMPLETED BY:

11. J. Jones TELEPIIONE:

(334) 899-5156, ext. 365 I

OPERATING STATUS l

\\

l 1.

Reporting Period:

April 1998 2.

Design Electrical Rating (Net MWe):

829 3.

Maximum Dependable Capacity (Net MWe):

822 i

l This Month Year to Date Cumulative I

4.

Number Of Hours Reactor Was Critical:

719.0 2,879.0 145,160.6 5.

Hours Generator On-line:

719.0 2,879.0 143,098.4 6.

Unit Reserve Shutdown Hours:

0.0 0.0 0.0 7.

Net Electrical Energy Generated (MWH):

591,718.0 2,380,757.0 112,681,085.0 i

l I

CIIALLENGES TO PRESSURIZER PORY OR PRESSURIZER SAFETY VALVES l

Date

! lag No.

I Event Description l

l There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.

I i

El-1 1

j

l l

2 l

UNIT SHUTDOWNS i

l DOCKET NO.:

50-348 l

UNIT NAME:

J. M. Farley - Unit l_

DATE:

May 4,1998 COMPLETED BY:

11. J. Jones REPORTING PERIOD: April 1998 TELEPIIONE:

(334) 899-5156, ext. 3628 i

Type Method of F: Forced Duration Reason Shutting Down Cause/ Corrective Actions No.

Date S: Scheduled (Hours)

(1)

(2)

Comments There were no unit shutdowns during the month.

l (1) KLANUN.

(2) MLillVD.

A - Equipment railure (Explain) 1 - Manual II Maintenance or Test 2 - Manual Trip / Scram C - Refueling 3 - Automatic Trip / Scram D-Regulatory Restriction 4 - Continuation E - operator Training / License Examination 5 -other (Explain) l'. Administrative G OperationalError(Explain) 11 Other(Explain)

CAUSE/ CORRECTIVE ACTION / COMMENTS NARRATIVE REPORT At 1304 on 980429, with the unit operating at 100% reactor power, the unit was ramped to 80% reactor power to repair a cooler leak in the 1 A Condensate Pump Motor. The cooler was repaired and the lower motor bearing replaced. The unit was returned to 100% reactor power at 1755 on 980430.

1 El-2 J

(

OPERATING DATA REPORT DOCKET NO.:

50-364 l

UNIT NAME:

J. M. Farley - Unit 2 DATE:

May 4,1998 COMPLETED BY:

11.J. Jones TELEPilONE:

(334) 899-5156, ext. 3658 OPERATING STATUS l

1.

Reporting Period:

April 1998 2.

Design Electrical Rating (Net MWe):

829 3.

Maximum Dependable Capacity (Net MWe):

828 l

This Month Year to Date Cumulative 4.

Number Of Hours Reactor Was Critical:

0.0 2,065.4 126,982.4 5.

Ilours Generator On-line:

0.0 2,065.1 125,196.0 6.

Unit Reserve Shutdown liours:

0.0 0.0 0.0 7.

Net Electrical Energy Generated (MWII):

0.0 1,732,150.0 99,563,514.0 CIIALLENGES TO PRESSURIZER PORY OR PRESSURIZER SAFETY VALVES Date l Iag No.

I Event Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.

l E2-1

l i

UNIT SHUTDOWNS l

l DOCKET NO.:

50-364 UNIT NAME:

J. M. Farley - Unit 2 DATE:

May_4,1998 l

COMPLETED BY:

1-1. J. Jones REPORTING PERIOD: April 1998 TELEPIIONE:

(334) 899-5156, ext. 3628 Type Method of F: Forced Duration Reason Shutting Down Cause/ Corrective Actions No.

Date S: Scheduled (Hours)

(1)

(2)

Comments 001 980328 S

719 C

1 The twelfth refueling outage continued from 980328.

i l

I i

(1) KLAsVN.

(2) MLillVL).

A - Equipment failure (Explain) 1 - Manual H Maintenance or Test 2 - Manual Trip / Scram C - Refueling 3 - Automatic Trip / scram D - Regulatory Restriction 4 - Continuation E - operator Training / License Examination 5 -other (Explain)

F Administrative G operational Error (lixplain) 11 - other (Explain)

CAUSE/ CORRECTIVE ACTION / COMMENTS NARRATIVE REPORT Completed the following Refueling Outage Activities; RCP Stator Winding Assembly Replacement - 10 Year Inspection Spray Add Tank Removal Modification Fuel Oxide Measurements RHR Heat Exchanger Head Gasket Replacement Core Reload Steam Generator Eddy Current Testing E2-2

_ _ _ _ _ _ _ _ _ -